Repairs to head sluice gate t ch 30.10 km of 16th distry under Hebballa channaiah canal
Construction of protective wall to seepage portion at chainage 0.007 KM 1st branch of RSM Canal
Clearing of thick jungle and removal of silt in HHLIS canal for the year 2026-27
Removal of silt and weeds in Kaggere branch & Chamalapura branch of RSM canal (at selected reaches)
AME (Manpower) of Canal Ch 169.8 km CR/Escape of IBC for the year 2025-26
AME of Main Canal from km 63.00 to 70.00 of ILC for the Year 2025-26.
Removal of Jungle at CH 44.000 to 51.440.of Malaprabha Left Bank Canal (Reserved for SC)
Removal of Silt in Selected Reaches from Ch 75.00 Km to 108.00 Km of SRDN Canal.
Plugging leakages and Repairs to damaged bund from 0.00 km to 57.00 km of RSM Canal
DEVELOPMENT OF HANIYAMBADI ROAD ON BASAWESHWARA TEMPLE CIRCLE TO VENKATESHWARA TEMPLE UPTO CANAL IN CMC MANDYA
Removal of Jungle and Silt from ch 3.5 to 7.00km of Main canal of MLIS-2
Removal of Slipped muck in VRBC 3rd km deepcut reaches coming under Votehole Right Bank canal
Improvements to canal and reconstruction of CD works in Dy 36, 37 and 38 under HRBC
Improvements to service road of HLBC main canal from Hemavathy colony No.2 joining Belasinda village.
AME of Canal for Dy-7 & BD-7 of SBC for the year 2025-26.(Machineries)
Improvements to canal, outlets & service road of Hulkere and Bettahalli minor under D-66 of HLBC
Construction of Box drain and protective works in 40 DPO near Kyathanahalli village under CDS Canal
Construction of Road and Culvert to Canal near Thungabadhra colony in Siruguppa Town of Ballari Dist
Providing C C Lining in Km No.2 in Dy No.2 of North Branch Canal.
CONSTRUCTION OF SALAPURA MAIN CANAL FROM CH 2.170 to 2.705 Km INCLUDING STRUCTURES UNDER SALAPUR LIS
Removal of jungle from ch 24.00 to 29.0km and silt in vulnerable reaches of D.D.Urs Canal
Repairs to Gates in combined Structure at Ch 15.300 of Chikkud branch Canal and other Works
Re-erection of dismantled Pump No. 1 & 2 of 1250 KW at Almatti Left Bank Canal.
Repairs and Maintenance to MRBC main canal under Mallapur sub division for the year 2024-25
Improvements to P. Os, Escapes and Distributaries from ch.22.00 km to 27.00km of Hullahally Canal
Road Asphalting From Gadadi Farm Canal To Satteppa Bilkara House In Tukkanatti Village Of Mudalagi Taluka
Construction of Guidewall on both side of canal at Ch 10.10Km of Dy 22A of SBC.
Removal of jungle from ch 18.00 to 24.0km and silt in vulnerable reaches of D.D.Urs Canal
Repairs and Maintenance to MRBC main canal under Belavanaki sub division for the year 2025-26
Removal of Silt and Jungle clearance of Dy 31 to 38 under Alamatti Left bank canal
Supplying of Labours for Water Management of Karimasuti West canal During 2025-26 (Reservation Scheduled Tribe)
Clearing of thick jungle and removal of silt in HHLIS canal for the year 2025-26
Construction of bridge at ch 1.550 of Dy No 2 of North branch canal & other works
Removal of Jungle from Ch 12.00km to 19.50 km of D-26 of DD Urs Canal
Repairs of CTC at ch 3.56 km in tailend of Annur minor in sulekere south canal
Improvements to canal system of Lat-10, 10A,11,12,& 13(14) of D-26 of DDUC
Reconstruction of Damaged Canal Bund On IP Side at Ch. 86.700 km & 86.900 km of HLBC
Restoration of Gates of Lateral No 1 to 6 of Dy13B under East canal of CLIS.
Improvement of Dy-16 and SR of Varahi Left Bank Canal Ch.0.00 to 7.00 km
Shifting of Chikkanayanahalli purasabe Drinking water MS Pipe Line Crossing Yettinahole Gravity Canal at Ch142.277 km
Repairs of CTC at sunnanadadoddi minor in 0.90 km of 18th distry of Hebballa channaiah canal
Improvement of Dy-16 and SR of Varahi Left Bank Canal Ch.7.00 to 14.00 km
Removal of silt in Dy.60, 61, 62, 63 ,64, 65 & Yashodarapura sluice canal, under HRBC
Restoration of Geddalamari Pickup Canal from Ch. 0.00 to 0.030 Km of Dty-3D of NLBC
Improvements to Main Canal Service Road from Ch.107.000 to 107.750km of HRBC in Hunsur Taluk.
Removal of silt and jungle clearance from 50.00 to 60.00 KM of east canal under CLIS.
Removal of Jungle Clearance from Ch. 10.00 KM to 40.00 KM of East Canal under CLIS.
Removal of Jungle in sides from Ch 0.00 to 8.00km of Yenne hole Left Bank Canal.
Removal of silt and slipped muck from Distributory 14 to 50 of Yagachi Left Bank Canal
Improvement of road from Yadhalgudda village to MRBC main canal (upto karemmanavar temple) in Gokak Taluka