Loading…
Loading…
9,651 results • Best match
Removal of silt and jungle clearance from 50.00 to 60.00 KM of east canal under CLIS.
Removal of Jungle Clearance from Ch. 10.00 KM to 40.00 KM of East Canal under CLIS.
Removal of Jungle in sides from Ch 0.00 to 8.00km of Yenne hole Left Bank Canal.
Removal of silt and slipped muck from Distributory 14 to 50 of Yagachi Left Bank Canal
Improvement of road from Yadhalgudda village to MRBC main canal (upto karemmanavar temple) in Gokak Taluka
Maintenance of 2nd year plantation - 50 Ha. at Chankalkaval canal area of Periyaptana Range, under DDF
Removal of silt and jungle in tank atchkat canal of Sarigehalli for the year 2025-26
Asphalting Road from Bisnal-Janmatti Road to Canal Road in Bilagi Taluk(0.00 to 3.00 km)
Removal Of Silt From Ch.80.00 Km to 84.00 km of JBC Main Canal.(Selected reaches)
Removal of silt in 4th branches, Hanumana kaluve & Revani uddi under RSM Canal. (at selected reaches)
AME of canal for Distry No.7 & BD-7 of SBC for the year 2026-27
Removal of silt and jungle clearance Main canal from ch.80.00 to 87.00 km of IBC
Removal of Jungle and Silt from ch 7.00 to 10.00km of Main canal of MLIS-2
Construction of bridge across Nugu left bank canal at Ch. 31.70 Km (Reserved for SC Contractor)
Construction of Foot Bridge across Nugu Right bank canal at ch. 24.92 km near Kappasoge village
Removal of Silt & Jungle in selected reaches of Canal of Saudagar Project for 2025-26
Removal of Silt & Jungle in selected reaches of Canal of Hattikuni Project for 2025-26
AME for Engaging the Labour for water supply Networks of Varahi Irrigation Project Colony for the year 2025-26.
Annual maintenance of I.B, Residential quarters and Office building of Irrigation colony of Kiresur for the year 2025-26
Repairs, painting and maintenance of MLBC Circle office & SE quarters of Naviluteertha Irrigation colony for the year 2025-26.
PRESSURE BAG FOR 3 LITRES FLUID USED FOR UROLOGY AND HYSTOCOPE IRRIGATION(Accepted Make/Brand:-PRESSURE BAG/PROMT CARE)
Supply of various categories of manpower required for water management of UTP main canal net work under AME of UTP Main Canal for the year 2025-26 (from Km 0.00 to 89.00) (From September 2025 to March 2026)
Package - Removal of Jungle and Silt at North Branch canal in Selected Reaches from Ch 0.000 to 6.000, 6.000 to 12.120 and in selected reaches from km No. 1 to 12 of Chikkud Branch canal and other works
Providing and laying of HDPE pipeline for Drinking Water purpose from Old Borewell to Sabanna house in Kollerdoddi and Borewell near Marigemma Dicchi canal to Megappa house and Talavardoddi canal to Ramanna house and Erappa Tanda main road to ... near canal to ...
Providing water management to MRBC Main canal ,distributaries,subdistributaries and Laterals under Kurahatti Subdivision
Infrastructure development for new helicopter manufacturing facility for HAL at Biderahalla kaval gubbi taluk Tumakuru dist under phase 1 stage 3 package 3 SH Ancillary development works such as formation of canals for diversion of rivulets, ... to canals , ...
Construction work of the Raja Canal from Rudramma s house in Yaraganal village to Basavarajappa s house
Raising of plantation at Kanakadas circle to Devarahipparagi seeme canal, roadside-4km, Devarahipparagi Sangolli rayanna Circle to Ambrdakar circle and other areas-4km & Kanakadas circle to Devarahipparagi seeme canal roadside P-II-3km during 2025-26. (RESERVED FOR OTHERS)
Supplying of Man Power for Main canal from ch17.00km to 22.00km and distributory No.04 and 05 of TBC and Main canal from ch6.00km to 23.00km and distributory no.2,3,4 and 5 of NBC for the year 2026-27
Desilting of Storm Water Drains and canals passing through Ashwatha Nagar, Navule, I.G. Layout, Bommanakatte F Block, Usha Nursing Home Circle, Gandhinagar, Amir Ahmed Colony, Basavanagudi of Ward No. 02, 10 and 11 of Shivamogga City Corporation limits(Reserved for SC)
AME (Manpower) of Main Canal from Ch104.00km to115.00km of IBC for the year 2025-26
Removal of silt in Hanumanthapura canal from Ch 17.00 to 20.00 km under Hanagodu series (selected reaches)
Providing Man power for Water Management of Canal network of Yalligutti LIS for The Year 2025-26.
Removal of Jungle in Koodanahalli pickup canal, Mandakalli main & highlevel of Dalvoy tank (Reserved for Category-I).
AME of Canal at 125.00 Km to 130.00 Km of NRBC Extension for the year 2025-26
AME of Canal at 135.00 Km to 145.00 Km of NRBC Extension for the year 2025-26
Removal of silt from Km 90.00 to Km 120.00 of Bijapur Main Canal under MLI Stage-lll
Clearing of thick jungle and removal of silt in Bagali LIS canal for the year 2025-26
Removal of silt and jungle clearance main canal from 70.00 to 87.00km in selected reaches of IBC
Improvements to CD at Ch0.300Km of Block no.9 of MRBC Canal for the year 2025-26
Removal of silt from Km 120.00 to Km 155.00 of Bijapur Main Canal under MLI Stage-lll
Reconstruction of the existing dilapidated Raja Canal in ward no 12 at Gowligalli In RNR CMC Limit.
Removal of silt and jungle clearance from Ch 45.00 to 53.345 km of west canal under CLIS.
Removal of silt and jungle in selected reaches from ch 38.00 to 60.00 km of SRDN canal.
AME of Canal for Dy 1,2,3,3A & 4 with laterals of SBC for the year 2025-26(Machinaries)
Hiring of machiniers for clearing jungle from D-1 to D-10 of Taraka left bank canal.
Removal of Silt and Jungle of Dy-4,5,6 of MLI West Canal for the year 2025-26.
IMPROVEMENTS OF ROAD FROM ADIHUDI NAGANOOR ROAD CANAL KAVALI TO ADIHUDI ROAD IN JAMKHANDI TALUK BAGALKOTE DIST
Removal of silt and jungle clearance of Sonthi main canal from km 10.00 to 18.00km of SLI
Removal of Jungle and Slipped Earth in Ridge Canal and 14000 m Minor D-8 of TBC