Loading…
Loading…
9,651 results • Best match
Improvement of Road from Madhire village to Kolur Kurugodu Major District road to join village Road (VR-541) from Km 0.00 to 0.85 and from Belagoduhal canal to Eranna house in Kampli Assembly Constituency,Ballari District under 2515-KKRDB (Macro Projects) for the year 2025-26.
Removal of jungle & silt from ch 0.00 to 1.60km of D1, ch 0.00 to 2.00km of D4 and ch 0.00 to 0.50 km of D5 , ch 0.00 to 1.50km of D6, ch 0.00 to 0.9km of D8 and ch 0.00 to 1.30km of D9 of D.D.Urs Canal
Removal of silt and jungle clearance and improvements to SR of Lat 1 of Dy 1, Lat 1 of Dy 4,Lat 3 of Dy 05 and Ch 0.0km to 2.0km of JBC. and from ch 15.00 to 17.625 km of main canal of MLIS Lift-3
Supply of various categories of man power required for water management of UTP Main Canal and its network( from Ch- 90 to 156 km), Computer operator and Group-D worker for Office maintance, pertaining to UTP sub-division No.1, Rattihalli for the year 2025-26
Providing and fixing Metal crash barrier to Link canal at from ch. 1.35 to 1.80km from Ch 2.22 Km to 4.710Km near kanganamaradi from ch.5.80 to 7.80 km, near Chikkabyadarahalli & Doddabyadarahalli from ch. 8.30 to 11.50 km near Ganangooru coming under Pandavapura Taluk, Mandya District
Special Repairs to Distributaries of tank filling schemes under Managuli Branch canal for the year 2026-27 (Lining at Dy-1 Ch 3400 to 3450m, at Dy-8 Ch 750m to 950m, Murrum filling of DY-19 SR, M-2 of Dy-19 Chute at tail end)
Send for kind approval
Restoration of side lining and Bed lining of canal and encasing GRP crossing
Removal of Jungle and Silt Clearence of Arekera Branch Canal of from Ch 0.00 to 6.00km, 6.00 to 13.00km, 13.00 to 20.00km And laterals-2,3,5,6,7,8,10,11, and 12 sub-lateral 1,2 and 3of lateral 2 of D-9(A) of NRBC in selected reaches for the year 2025-26.
Removal of jungle & Silt from Ch. 0.00 to 1.50 km of SD-1, ch.0.00 to 2.00 km of SD-2 ,Ch. 0.00 to 1.50 km of SD-3, ch.0.00 to 0.70 km of SD-4 in vulnerable reaches under Dy-20 of D.D.Urs Canal(RESERVED FOR SC)
Construction of CC road from Bawasab house to Srinivas house at Ward No 06 and Providing & laying of NP-3 pipe near canal at Ward No 08 and Providing and laying of RCC Slab at Rajivnagar from D Kallappa to Shantkumar house at Ward No 07 in Sirwar Town
Construction of CC Drainage from basavaraj bhajantri house to yallappa utakanur house in Ward No 01 and aarunoday school front side in ward no 01 and 65th distributor canal to poornaroa housr in ward no 12and adayya amarayya temple to main drain in ward no10 TP Balaganur limit
CONSTRUCTION OF FIC NETWORK OF OL-2, OR-2, OL-3, OR-3, OL-4, OL-5, OL-6, OL-7, OL-8, OR-5, OL-9, OR-6, OR-7 & OL-10 OF DY-3 OF KAJIBILGI WEST CANAL UNDER DC-01A OF TUBACHI -BABLESHWAR LIS(PACKAGE-3)
Supply of Man Power for Water Management of DDUrs canal and its Distributories from ch.0.00 to 29.00 km, ch.45.00 to 55.00 km, ch.104.00 to 115.00km, Distributory-25 of DDUC Dalvoy tank and its series for both Kharif and Rabi crops for the year 2025-26
Providing and laying of HDPE Pipeline from Dr Ramaswami new house to Tanaji house and Pattar Ramesh house to Abdulsab Chaudry old house at Ward No 06 and at Mucchalgudda Camp at Ward No 11 and from Bangle Halla to 91 canal at Ward No 17 in Sirwar Town
Removal of Silt & Jungle Clearance from Ch. 0.00 KM to 25.00 KM, Dy. No.1, 2, 3, 4 & 10.71 and Laterals No. 1 to 3 of Dy-1 and Laterals No. 1 to 5 of Dy-2 of ALBC Main Canal for the Year 2026-27 (Except Modernization Reaches)
MAN POWER SERVICE TO KAMALAPUR
Removal of Silt and Jungle in selected reaches of the Dy-1 Ch 2.00Km to 3.00Km and 3.50Km to 4.00Km, Dy-8 Ch 500m to 1000m, 3500m to 4000m and Dy-19 Ch 300m to 600m of tank filling scheme under Managuli Branch Canal for the year 2026-27
CONSTRUCTION OF DRIANE
Removal of Silt and Jungle
TANK BUND REPAIRS
Hiring of machinery and labours for removal of silt from Ch 0.200 km to 2.500 km of D-4 & Ch 0.300 TO 1.600 km of D-5 & Ch 0.00 km to 0.50 km of D-5A & Ch 0.15 km to 0.900 km of D-6 of Kabini left bank canal.
Construction of culvert in Dy.39 of HRBC and improvements to road from Mardur Gate to Dy.39, Improvements to road from Meluru Gate to Dy.36 and Improvements to canal service road from Ch 74.629 to 75.645 km of HRBC (Connecting road to Singrigowdanakoppalu village, Kalegowdanakoppalu village and Galaganakere Village).
Providing sowdies for canal management in 13th & 14th distry, Kirugavlu, Mikkere, Markalu, Sujjaluru, kalkuni chikkere, kalkuni doddakere, Hoovinakoppalu and Ramanduru Tanks under TBC & Providing Pump operator and Watchmen for maintenance of Marehalli LIS, Supply of computer operator & watchman for the Kirugavalu sub division office from April -2025 to March-2026
CONSTRUCTION OF CC. DRAIN AND CC. ROADS AND ASPHALTING WORK IN VILLAGES BETWEEN HUNASANALU VILLAGE TO HARTHALE-MASSGE ROAD - HUNASANALU, KURUHATTI, KALIHUNDI, GOLURU, DEBURU, ROAD FROM KARALAPURA VILLAGE TOWARDS HANDIJOGI COLONY, ROAD FROM HANDIJOGI ... K.R.B.C. CANAL AND ...
Construction of Canal Service Road from M.M Halli to Dy No-40 and Improvemnts to Minor No-2 of Dy No.40 of HRBHLC and Improvements to Service road from Hiritalalu road to Rangenahalli coming under 91.00km of HRBHLC and Improvements Minor No-1 of Dy No-41 of HRBHLC
Removal of Silt and Jungle in Main Canal from CH 0 - 20 Km, N/B, S/B and Dy No.1, 2, 4, 5, 6, 7, 8(a), 8(b), 9, 9 L/S, 10 11, 12, 13, 14, 15 to 20 Coming under HMLIS for the year 2026-27.
Removal of silt and Jungle for smooth flowing water in canal for tank filling schemes
Construction Of 8km Double Circuit 11kv Link Lines From Shidhargadda 110kv Muss, Kptcl To Canal Of Havambhavi Area Near Classic Function Hall For Linking To F-13, F-33, F-2 And F-6 Feeders In O&m Unit-6, Csd-ii, Gescom, Ballari On Partial Turnkey And Unit Rate Contract Basis
Hiring of machineries for Removal of Jungle and removal of silt from Ch 0.45km to 1.20 km of L/s branch and 0.00km to 0.75km of R/s branch in D-8 and 0.00km to 0.5km L/s branch,0.0km to 1.2km R/s branch in D-9 of Kabini Right Bank Canal.
Package 13 1 Construction of RCC Drain on both sides from Sri Krishna Nilaya to Basava Canal and laying of Covering Slab and Construction of CD in ward no 15 in Hosapete City. 2 Construction of Compound Wall to Eshwar nagar Park in ward no 24 in Hosapete City. (Reserved for ST)
Restoration of CTC at Ch 3.300 Km of Dy-10 of SBC, Breached Bonga portion on IP side at Ch 0.560 Km in Extension canal of Sub Lat -2 of Lat-1 of Dy-10 of SBC & CC lining from Ch 0.900 to Ch 1.010km in Lat-3 of Dy-10A of SBC.
Desilting work of the Rajakaluve from the railway bridge behind Koppa Sri Ravi Shankar Vidya Mandir in Ward No. 01, Somina, through Surya Layout to Bommana Katte Bridge, Rajakaluve in Bommana Katte B Block Ashraya Layout and the left bank canal passing near Hosamane Layout in Ward No. 20.(Reserved for SC)
Hiring of machineries for Removal of Jungle and removal of silt from Ch 1.50km to 3.80 km of L/s branch and 0.5km to 1.9km of R/s branch in D-6 and 0.00km to 0.5km R/s branch,0.0km to 0.6km L/s branch in D-7 of Kabini Right Bank Canal.
Special Repairs to CD at SL-3 of R-9, C.C Lining, embankment formation at Ch.5.50Km, Ch 8.10Km, Ch.14.40Km of Dy.22 and IBC Main Canal at Ch.105.00Km and Special repairs C.C.Lining and damaged CTC Head wall of Lateral No.3 at Ch.1.50Km of Dy.23 under IBC.
Replacing damaged DI pipe and laying 300mm dia MS pipe near PWD quarters at Parvathi nagar ward no.01, 1067mm MS raw water rising main pipe leakage rectification at Talur canal air valve and 450mm MS pipeline interlinking from Shivpur WTP line to Sangankal WTP at KRS function hall in Ballari city.
Improvements to roads in Laxmipura village in Anughatta G.P, Aladahalli village in Aduguru G.P, Yamasandi Chokanahalli main road to Kudluru village in Yamasandi G.P and Construction of Retaining wall at 2.40 km and Cut and cover from 4.20 km to 4.80 ... Keetur canal under ...
Removal of jungle & silt from Ch. 0.00 to 2.00 km of Dy-15, ch.0.00 to 1.00 km of Dy-16 ,Ch. 0.00 to 3.00 km of Dy-17, ch.0.00 to 2.70 km of Dy-18, ch.0.00 to 1.80 km of Dy-21 and silt in vulnerable reaches of D.D.Urs Canal
MODULAR BIPOLAR HIP PROSTHESIS SET CONSISTING OF FEMORAL STEM-01, TITANIUM ALLOY MAKE, PROXIMAL STEM H A COATED , MORPHOMETRIC WEDGE DESIGN WHICH FITS FOR A WIDE RANGE OF FEMORAL CANAL AND TO HAVE TWO NECK ANGLES, 02- FEMORAL HEAD COBALT CHROMIUM-1NO. 03-BIPOLAR COMPONENT COBALT WITH HIGHLY CROSS LINED POLY LINING
Repirs to Tank
Desilting of canal in dry conditions by excavating and disposing the same(Category-II(A)Reserved)
Creation of electrical network by creating infrastructure by extending 11kV HT lines, erection of 25KVA, enhancement of 25KVA by 63KVA 1-Star Rated Distribution Transformers and extension of 3 phase 4 wire LT line for energisation of 2099 nos. of ... of Irrigation Pump ...
Providing and Laying of Drinking water pipeline at ward no 12 and ward no 13 at TMC Kurugodu
Construction of FD in sy no 250/1 Vishwa S/O Krishannappa land of RBC of Madaga-masur Reservoir in Hirekerur taluk and sy no 42 of Siddamma Hallappa patil land of LBC of Madaga-masur Reservoir in Hirekerur taluk and sy no 33 of distributory of main ... main canal Nadiharalalli ...
Water management, watch and ward of gates, removal of debris, floating materials and any other obstructions to CDs, Super Passages during water period at Ch 90 to 102 of Main canal and at Ch 0 to Ch 14.270 of 49C Block and sub distributaries coming under 49C Block of MRBC for the year 2025-26.
Removal of jungle Ch. 0.00 to 2.00 km of Dy-13, ch.0.00 to 1.00 km of Dy-14 ,Ch. 0.00 to 3.00 km of Dy-15, ch.0.00 to 2.70 km of Dy-16, ch.0.00 to 1.80 km of Dy-17 and silt in vulnerable reaches of D.D.Urs Canal (Reserved for SC).
Package work for (1) Removal of jungle along the raising main in selected reaches from Ch.0.000km to 1.10km and around pump house & sub-station area of 2nd head work of RLIS at Anehosur and (2) Removal of silt & debris in the intake canal and sump of 2nd head work of RLIS at Anehosur.
Hiring of machineries for Removal of Jungle and removal of silt from Ch 0.35km to 1.5 km,2.00km to 3.5km ,3.70km to 5.60km and k belthuru sub distributory 0.30km to 1.3km in D-013 and removal of silt from Ch 0.40km to 1.70km, km,2.00km to 3.5km in ... Bank Canal .
Special repairs to damaged cc lining in selected reaches of ilc main canal from ch 9.80Km to 11.50Km Dy-5 construction of ctc n lateral 3 of dy-5. Restoration of chute wall n lateral 6 of dy-5 and construction of chute wall in dy-5 from ch 9.80Km to 10.00Km of ilc.
Package Estimate for the work of Removal of silt and Jungle Clerance of Lat-03 From Ch 0.00km to 1.705km,Lat-04 From Ch 0.00km to 2.00km, Lat-05 from Ch 0.00km to 2.815km ,Lat-06 From Ch 0.00km to 4.080km & Lat-07 from Ch 0.00km to 2.00km of Sonthi ... Branch Canal of