Loading…
Loading…
9,651 results • Best match
Replacement of Radial gate Steel Wire rope 40mm dia and Panel board Electric power contractor and MCCB of Maski nala dam spillway radial gate of MNP.
Reconstruction of Road bridge at Km 0.92 of Distry16 under RBHLC connecting Ibrahimpura to Y Budihal villages of Ballari.
Consultancy services for detailed investigation, survey, preparation of designs, drawings, Package estimates, Draft Tender Papers (DTP) for Diversion of Flood water of Maskinala to Kanakanala valley by constructing Bridge cum Barrage across Maskinala near Aryabhogapur village, in Kushtagi village , Koppal District.
Removal of Silt & Jungle from Ch. 0.00 to Ch. TEWC (selected reaches) of SD 10L/2 and Providing and Fixing Sluice Gates to POs at Ch. 8.50 R/S, 32.00 R/S,39.00 R/S, 47.50 R/S, 61.00 L/S, 67.50 L/S, 78.00 R/S, 84.00 L/S, 105.50 R/S & 133.00 R/S of SD 10L D/54 II nd reach of TLBC.
Maintenance work
Maintenance work
Removal of Slipped earth in Deepcut reaches between ch 22.40 km to 22.80 km of DDUrs Canal.(Reserved for Category II A)
Construction of Foot bridge across 16th sub-canal infront of chaitrammas house in hale koodligere of koodligere grama panchayath in bhadravathi taluk
REMOVAL OF SILT
Removal of Silt & Jungle
Metaling Work, CC Road, CC Drain, Culvert, Protective Wall, Bridge, Trough Work & Crash Barrier.
Repairs to Neginhal village Pattihal road Canal CD , Construction of CD at entrance of Bairanatti village, Providing 4 feet pipe and motor in Virapur, Maradinagalapur and Gaddikaravinkoppa Village, Construction of box culvert near Karemma temple of Mastamardi village, Construction of CD near Laxmi temple of Mastamardi village and Construction of Cement concrete road from grave yard of Bavihal village to join Jakanaykankoppa road in Channamman Kittur constituency.
Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning Jackwell cum pump house, M S pipe Rising Main from Yetinahole Gravity canal to MS Gravity pipe near KWIN City including Pumping Machineries and allied works inside the pump houses, SCADA, Land Acquisition & 5 years of O&M for Providing & supplying fresh water to the industrial areas in districts around Bengaluru on EPC Basis. (Package-6)
Supplying of Diploma in Engineering Employee, Driver for Division Jeep KA-45 M-4648 and Sub Division Jeep KA-45M-4563 for regular duties, like Attending inspection of Officers, attend Meeting and Court Duties, Water management, Computer operators for working in Computer section, Sweepers, Night Watchmens, Peons & Mazdoor for working in Sub Division Office Colony and its Premises of sub Division office for the year 2025-26 as directed by the Engineer incharge of work
Supply of Manpower (drivers) to vehicle for Deputy chief engineer, Irrigation (south), Mysuru office, Superintending engineer, Kabini and varuna circle, mysore (Retd) & Nodal Officer (WUCS), Assistant Executive Engineer No.3, No.4, & No.7 vcc sub division ,& Electrical Sub Division,Mysuru, Executive Engineer, Quality Control Division ,Mysuru, Assistant Executive Engineer No.1,QC Subdivision,Ramanagar, No.2,QC Subdivision,Mysuru, No.3,QC Subdivision, Hulagunda & No.4 QC Subdivision, Nanjanagudu for the year 2026-27
Drilling a borewell and providing water supply system in the Christian community cemetery next to Chintamani Layout in Harihar Municipality limits, installing a mini high mast and other development work. Installing a high mast in Indira Nagar Park. ... the Irrigation Department ...
REMOVAL OF SILT
Repairs of wing wall
Removal of Silt and Jungle
Restoration to Breached portion
Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm
Improvements to Minors Pickups of 5th dys
Fixed Computer Workstation (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6930332 Dated : 25-11-2025 Bid Document 1/10, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Construction of Pavers road in ward 18. From Dhanalaxmi tower side to Manju House , In Ward No.22 From Canal to shekappa House ,Infront of Masjid to Yardona road & Abdual Nazir sab Colony Kalve Right side Nayak Suddi House to BT Road & Ward No.03 Fakirappa Billar House to Hanamanth Yaligar house to Ambamma House to Girijamma House Pavers Road in Karatagi TMC Limit. (As per Action plan)
Improvements to roads from kotnayakanahalli village behind kollapuradamma temple to thimmaraju house, improvements to roads beside government high school of kotnayakanahalli village to Bommalapura village sy no 84 pankaja w/o late jayanna farm land ... yettinahole canal , ...
Construction of public Drain behind GEC Haroon s house In Ward No. 07 Ganapathi Street, Providing slab for drain in front of Abraham Arshad s house and development of drain behind Kalam Layout Khalid s house and Construction of Retaining Wall near ... Raja Canal in ...
Removal of Jungle from ch 0.00 to 2.00km and from ch 2.00 to 4.00km of MBC main canal(Selected reaches) and Removal of Jungle and silt clearance from ch 0.00 to 1.75km (Selected reaches) of DY-11, from ch 0.00 to 1.75km (Selected reaches) of DY-12, from ch 0.00 to 3.00km (Selected reaches) of DY-14 and from ch 3.00 to 6.00km (Selected reaches) of DY-14 of MBC.
CONSTRUCTION OF FIC NETWORK OF OR-1, OL-1, OL-2, OR-2, OL-3, OR-3, OL-4 , OR-4 OF DY-1 , OL-1 OF DY-2 , OR-1, OL-1 & OR-2, OL-2 OF MINOR-1 OF DY-2 & OL-1, OR-1 & OL-2, OR-2 OF MINOR-2 OF DY-2 OF KAJIBILGI WEST CANAL UNDER DC-01A OF TUBACHI -BABLESHWAR LIS(PACKAGE-1)
Removal of Silt and jungle
Removal of silt & jungle
Construction of cc road and drain
Removal of Silt and jungle
Construction of approach Slab
Removal of Silt & Jungle clearance in CLIS from Ch. 70.00 to 110.00 Km (Selected Reaches) of CLIS East Main Canal for the year 2026-27
Construction of various industrial buildings for new Helicopter manufacturing facility for Hindustan Aeronautics Limited at Bidrehalla kaval, Gubbi Taluk, Tumakuru District under Phase-I, Stage-III. SH: Design and Execution of Automated irrigation System, Design and construction of RCC UG sewage collection sump i/c piping network, steel staircase, chain link fencing works, supply and installation of eye wash units, automatic high speed industrial fabric doors, internal and external power distribution system and other miscellaneous works.
Development work of Jagaluru Tank in Jagaluru Town(continued work)
Renovation of Navilehalu Pickup under DBC (Reserved for SC)
Re-Construction of Head Sluice gate and Structure of Basavanal under SS Tank (Reserved for Cat-IIA)
Removal of silt and jungle in Basavanala under SS Tank (Reserved for SC)
REMOVAL OF WEEDS, SILT AND JUNGLE CLEARANCE IN UPSTREAM AND DOWN STEARM AREA OF DB KERE PICKUP DAM FOR THE YEAR 2025-26 Reserved for Category-I
Repairs to Escape Sluice Gate and its walls at Ch5.10KM under DBC (Reserved for CAT-I)
Removal of silt and jungle in Tyavanigi nala under SS Tank (Reserved for CAT-IIA)
Removal of silt and jungle in Siddanala under SS Tank (Reserved for SC)
Annual Maintenance of Repairs and Maintenance & Installation of UPS and Computer accessories to Sub division Office in Basavapatna for the year 2025-26(Reserved for SC)
Re-construction of CTC at Ch. 4.60km (Shingrihalli-Nagalapura Connecting road) in 9th C Distributory Under DBC (Reserved for SC)
Repairs to pipe CTC of Bullapura Minor at Ch 2.00 km under 9th C distributory (Reserved for SC)
AME of Repairs and maintainance to subdivision office Sasvehalli for the year 2025-26(RESERVED FOR ST)
Repairs to Gate arrangements of 8thA & 8thB and its DPOs under HBC
Removal of silt and jungle in Belalagere and Kathalagere Nala under SS Tank
Repairs and Improvements of Gates of Pamenahalli minor, Shiramagondanahalli minor and its POs under HBC