Loading…
Loading…
215 live199 closing this weekmost from Irrigation Department and Local Self Government Department
215 results • Best match
Action plan 2026-27-PIP Main canal- Annual maintenance of main canal from ch. 0m to 10708m
Action plan 2026-27-PIP Main canal- Annual maintenance of main canal from ch.10708m to Ch.14966m
GENERAL-KyIP ACP PLAN 2026-27-Recification works near Ch.0/200 and ch.1/000km of Naderi Distributary-General Civil Work
GENERAL Budget Rectification work Urgent leak Rectification work of Adichanallooor distributary between ch1130mand1180m ch2000 mto2250m in Pooyapally grama panchayath general civil work
Action plan 2026-27-PIP Main canal- Annual maintenance of main canal from ch.14966m to 19168m and up to bifurcation
Action plan 2026-27-PIP- PLP-4668/2025 of the Karthikappally Taluk Legal Services Committee- Rejuvenation of Karthikappally distributary No. 2 and 3
GENERAL KIP LB Urgent Rectification to Melila west distributary Urgent Rectification between ch 20500m to 23500m at Pandithitta of Thalavoor Grama Panchayath General Civil Work
KELAKAM GRAMAPANCHAYAT VALAYAMCHAL PURCHASE AND INSTALLATION OF MOTOR PUMPSET AT VALAYAMCHAL IRRIGATION PROJECT
GENERAL Kattiyanadu Canal Maintenance Rectification of breached Portion in Kanthalloor grama panchayath Devikulam constituency Kattiyanadu Canal Maintenance Rectification of breached Portion in Kanthalloor grama panchayath Devikulam
Rectification Works To The Damaged Side Wall of Kallimenonchalla Branch canal
GENERAL 2025 26 KIP O and M Urgent rectification works of Edakkadu I distributary between ch 0 m to 135 m in Kadampanadu Panchayath General Civil Work
GENERAL PSM Imp 2026 27 Improvement works to Uthramkulangara branch canal between Ch. 0 400 0 600 Km for the year 2026 27 General Civil Work
EZHAMKULAM GRAMA PANCHAYAT 20226-27- 72 KOTTAMUGAL JUNCTION TO CANAL ROAD MAINTENANCE
G E N E R A L K y I P C A D A 2 0 2 6 2 7 Rectification of Avala sub distributary canal in b e t w e e n c h 0 1 8 0 0 t o 0 1 9 5 0 k m i n Cheruvannur Grama panchayath and shutter maintenance of avala and Vilayattur-General Civil Wo
PIP-RBC Annual Maintenance - RB canal from Ch. 4000m to 8000m-
PIP-RBC Annual Maintenance - RB canal from Ch. 8000m to 13500m
GENERAL KIP O and M Action plan 2026 27 Annual Maintanence RBMC ch 43000 m to 44015 m Kodumon Distributary from ch 0 m to 5315 m General Civil Work
Custom Bid for Services - REPAIR OF IRRIGATION SYSTEM AT VEPTA Similar Category Repair and Overhauling Service
DEPOSIT-Puthenpadam Padasekharam Construction of Link thodus of Ramavarma canal and Vembalai canal - and infrastructure works for installation of Submersible pump in Puthenapadam in Kuzhuppilly panchayath Supply and installation of Submersible pump
Refer tender document
GENERAL 2025 26 KIP O and M Urgent rectification works of Edakkadu II distributary between ch 1600 m to 2000 m in order to prevent overflow and seepage General Civil Work
Puthucode GP 2026-27 Renovation of Kottarasserry canal road -(Proj No-215/26-27)
PIPLBC-Annual Maintenance of L B Main canal from 10000m to 16140m
Annual Plan-VNGR/363/2025-26/Choorathodu Kavala Canal Bund Link Road Renovation Ward 11
GENERAL-KyIP CADA 2026-27-Renovation and modernization works to Velom distributary inbetween Ch. 0/350km and 0/450 km and inbetween Ch.3/500km and 3/700 km-General Civil Work
Rectification works to Mangalam branch canal from ch1815 to 2450m
Annual Maintenance to LB Main canal from 25022m to 31200m
GENERAL-Project no 73/2026-27-Pattomcolony krishy canal construction in Marayoor GP-General Civil Work
Annual Plan-Wadakkanchery Municipality (974/2025-26) Anganwadi Canal Road Div -02-.-General Civil Work
Annual Maintenance to RBC main canal from ch 13500m to 20230m
GENERAL ACTION PLAN 2026 2027 KIP O and M Urgent rectification work Edakkadu I distributary between ch 3350 m to 3450 m in Poruvazhi Panchayth in order to prevent seepage General Civil Work
GENERAL ACTION PLAN 2026 2027 Annual maintenance KIP O and M silt removal from 8 field boothies Ch 0 m to 2039 m of Iverkala II distributary during Water Distribution General Civil Work
Annual maintenance of LB Main Canal from Ch 22000m to 25022m
Annual maintenance of Pandanad branch Canal from Ch 0m to 13070m
Annual Maintenance to Mangalam branch canal from ch 0m to 3015m
Annual Plan-2026-27 Thenkurissi (proj.no.30)-Pandiyode Padinjaremuri Canal bund road improvements at ward 3
GENERAL-Project no 75/2026-27-puthukkad krishy canal construction in Marayoor GP-General Civil Work
Action Plan 2026-27-PIP-LBCAnnual Maintenance of L B Main canal from 5000 to 10000m
GENERAL ACTION PLAN 2026 27 KIP RB Annual maintenance of canals RBMC from ch 34320m to 43000m Enadimangalam distributory from Ch 0m to 6285m Elamannoor maroor distributory from Ch 0m to ch 1485m during water distribution General Civil Work
Annual Maintenance to Vallamkulam branch canal from ch 0 m to 4700m
Action Plan 2026-27-AM-PIPLBC-Annual Maintenance of L B Main canal from 0m to 5000m
GENERAL-PVIP- ACTION PLAN 2026-27 Annual Maintenance of Kodanad West Branch canal from Ch. 0/00Km to 3/850Km , Thuruthi MD, Thuruthikara FC, Puzhukkad FC, Vadoopadam MD, Pralayakad FC, Mudakuzha West MD and Pandikad FC canal
Annual Maintenance to Othara branch canal from ch 0 m to 3680 m
Annual Plan Malayattoor GP Proj No 24 26 27 Puramthodu canal road improvements ward 8 General Civil Work
Annual Plan- VELLINEZHI GP. 2026-27, P. NO 89-MAIN CANAL SIVA KSETHRAM ROAD RENOVATION-General Civil Work
2026-27-Annual maintenance of Edappally branch canal
Annual Plan-Karakurussi gp 2026-27 pro-no- 235/26-27-Mathampetty pallipadi canal road retaring-General Civil Work
Annual Plan-VELOM G P - RENNOVATION OF CHEMBENKOD MUKKU CANAL ROAD IN WARD 4-Proj No 99/2026-27