Loading…
Loading…
13,589 results • Best match
G E N E R A L K y I P C A D A 2 0 2 6 2 7 Rectification of Avala sub distributary canal in b e t w e e n c h 0 1 8 0 0 t o 0 1 9 5 0 k m i n Cheruvannur Grama panchayath and shutter maintenance of avala and Vilayattur-General Civil Wo
Rectification of canal
Rectification work of canal
Rectification work of canal
GENERAL-KIP O and M SECTION 7 KALANJOOR -Annual Maintenance of canals action plan sanctioned works 2024-2025-Vazhappara trashrack in connection with water distribution for the year 2024-2025-General Civil Work
The work is for engaging labours for canal watching during water distribution and other allied works along LB canal and its branches.
This project is intended for improving the agricultural yield of Kuravilangad panchayath in through community Micro irrigation . The total area of the land to be surveyed is 21.47 Ha and the road distance from source to the tank is 1500 m .
CADA canal
Clearing and Desilting of Atholi sub dty canal-
Clearing jungle and desilting of Velom Branch Canal
KGP 2021-22-----203/22------Kanakode- Cherumamkode- Canal Side Wall and Bridge Construction- Anavoor Ward
KGP 2021-22-----204/22---Kandanchira- Kallara Canal Sidewall and Bridge Construction in Kottukonam Ward
ring bund EW CC124 RCC DR CC136
Public work
DRINKING WATER SUPPLY
Construction of protection wall
VENTED CROSS BAR
NC 2019-20 Protection work
Const of protection wall , concrete lining for Vent way and Abutments , Replacement of damaged shutters with FRP shutters etc
VCB Construction
Road concrete
MAINTANANCE
Construction of Karalippalam-Cheruvanthala Kuttichattan Kshetram canal bund road
Annual Plan-PROJECT 225/26 TLB Canal Pathuveedu road concrete related works- MARAYOOR G P-PROJECT 225/26 TLB Canal Pathuveedu road concrete related works- MARAYOOR G P-General Civil Work
Urgent Works for Jungle Clearance and silt removal of-Thiruvallur dty canal from ch 0/000 to tail end and All fbs from this canal-
Improvements of canal inspection road
GENERAL-MP-Annual Maintenance-2024- 2025-Urgent Rectification works to LB Main canal and its branches for maintaining canal, Engaging Pump operators for Maintaining the water Distribution-General Civil Work
GENERAL LB01 25 Action plan 2025 26 NIP Protection works at breached portion of Ch 1000m at Vadakara branch canal and Ch 750m at Veeyannoor branch canal General Civil Work
GENERAL-Canal bund protection-Urgent revamping of Thenkara branch canal of Anamooli head Divertion Scheme between Ch 4-550 to 4-750 km in Thenkara Grama Panchayath-General Civil Work
PRO NO 412/25 -RE TARRING AND SIDE CONCRETE WORKS AT KACHERI CANAL BUND ROAD GREEN LAND AVILISSERY KULAM ROAD SASTRI NAGAR CANAL BUND ROAD FRIENDS NAGAR RAJEEV NAGAR ROA
DEPOSIT-KyIP Deposit work-(Velom GP) Construction of Kannivayal Koyyalakandam canal Culvert across Cherapuram Field Bothie canal near ch 1/400 km in Velom GP ,Kuttiady LA-General Civil Work
GENERAL-CPP-TMS-CADA-2025-26- Modernization Of Tail End Portion Of Field Channel Offtaking From Ch 0/830km (RHS) of Bazar Distributory Canal of Vakkode Branch Canal In Vadakathara
PTZ-99/2021-22- Fixing of Mothayikkarapadasekharam canal (Periyar Valley Canal) Bridge Hand rail in Ward no.5 of Vadavucodu Puthencruz .GP.under Annual Plan 2021-22 (Estimate asper DSR 2018)
GENERAL PIP LBC Rectification works to Malakkara branch canal between ch 3000m to 3500m and Kavalaplakkal aqueduct of Malakkara branch canal PIP S5 BW 11 2023 24 General Civil Work
PVIP-2025-26-Rectification of canal lining between Ch.9.200km and Ch.9.356km of Edappally branch canal including Civil works for cross shutter at Ch.1.250 km of Thengod MD
DEPOSIT KIP LB Concreting of canal bund road right bund MKLMHSS KIP road between Ch11245 m and 11355 m of Kottiyam Branch Canal in Thrikkovilvattom Grama Panchayath General Civil Work
GENERAL KIP LB Rectification Arresting leakage of Kulakkada Branch Canal flume from Ch 19400 19500m and Rectification of canal from ch 19600 to 20000m in Kottarakkara Constituency General Civil Work
GENERAL Action Plan 2024 25 Annual maintenance of canal 2024 25 Jungle clearance and silt removal in Karunagappally Branch Canal from Ch 0 m to 6580 m General Civil Work
GENERAL-Chavara Priority 2023-24-CSIND Removal of blockage at the mouth of feeder Canal to TS canal near Chavara Bridge in Chavara Panchayath in Chavara LAC-General Civil Work
GENERAL Infrastructure Facilities Reconstruction of boat jetty along TS canal at Veli in Thiruvananthapuram District Reconstruction of boat jetty along TS canal at Veli in Thiruvananthapuram District. General Civil Work
GENERAL Infrastructure Facilities Reconstruction of boat jetty along TS canal at Veli in Thiruvananthapuram District - Reconstruction of boat jetty along TS canal at Veli in Thiruvananthapuram District - General Civil Work
Rectification works in Keezhmad sub branch canal.
Kanjoor edanad canal bund road side protection
Improvement work for Kirachi Anganwadi Canal Road
Construction of Kumaraswamy Kaduthalapurath thazham canal road
GENERAL-MODERNISATION OF FIELD CHANNELS -2025-2026-GPS- I - RBCRectification Works To Karippode Thara Field Canal (offtakes from Ch. 2/056 km LHS of Karippode branch canal) Between Ch. 0/645 km and 0/780 km ( of the Straight canal portion)
Reconstruction of damaged canal culvert at km.2/400
GENERAL-KYIP-Rectification of Azhiyur Branch Canal nearCh13/800km-
66/2023-24 - CANAL PALAM - THANNICKAL PADY ROAD SIDE DRAIN - RETENDER IN EZHAMKULAM GP
PROJECT NO-79 ARUKALIKKAL CANAL PALAM-KULANJIYIL PADI ROAD DRAIN MAINTENANCE IN WARD-20