Loading…
Loading…
13,605 results • Best match
GENERAL-Punnakkad Ela Thodu Improvement of Irrigation facilities to Punnakkad Ela in Mallappuzhasserry Panchayath of Aranmula Constituency-General Civil Work
GENERAL- -Improving irrigation facilities and other allied works in Pirappamankad padasekharam in Mudakkal Panchayath in Chirayinkeezhu Constituency.-General Civil Work
GENERAL-Civil work-Improving irrigation facilities to Changad padasekharam in Karavaram Panchayath of Attingal Assembly Constituency-General Civil Work-1
GENERAL MI PTA Iyrar padassekharam Providing Irrigation facilities to Iyrar padassekharam in Kaviyoor Panchayath In Thiruvalla constituency General Civil Work
GENERAL Harithakeralam MI PTA Providing irrigation facilities to Paruthipalam Padashekharam at Mallappally Panchayath in Thiruvalla Assembly Constituency General Civil Work
Annual Plan NDY GP 24 25 Kuruppunayam Irrigation Pipe Lane Extension Ward 18 Project No 430 25 General Civil Work
GENERA MI Class II HKM Improving Irrigation facilities Kallumpurathu Ela thodu in ward 8 of Vettikkavala Panchayath General Civil Work
rectification works branch canal and maintenance to spout
Desiltation
Kandathippalam bhagom V C B is located near Kandathippalam padasekharam in ward No .10 of Rajakumary Panchayath
Pre-monsoon preparedness works
CIVIL WORKS
Desiltation
Earth work desiltation
Maintenance and rectification of canal
Rectification works
Rectification of Maniyur branch canal between ch 6/600km to ch 7/400km
Reconstruction of damaged portion of UT ,Construction of protection wall, canal lining etc.
Rectification of Maniyur branch canal between ch 1/600km to ch 2/000km
Supply and installation of Irrigation materials to the State Vegetable Farm Vandiperiyar Idukki dst Project 3 Supply and Installation of dismantling type impact sprinklers (50ft radius 50 lph discharge) with HDPE 63mm Permanent line
Rectification works to Paramon distributary of Malakkara branch c a n a l b e t w e e n c h 0 m t o 1 4 8 0 m
GENERAL-GPS II-Modernization of Canals- 2025-26-Nemmara LAC-Rectification of Drop near Ch 0/190 km of kizhakkethara branch and Drop near Ch 2/200 km of Kollengode branch and LBMC bw Ch 17/100-17/110 km-General Civil Work
GENERAL- Concreting of road- 2025-Deposit Work- Balance Concreting of Thattathu junction Canal road in Ward 11 of Kottarakkara Muncipality-General Civil Work
WP-2022-2023 -Urgent works for clearing weeds and Obstructions , during the water distribution , Emergenycey Tree cutting , Emergencey bund Strengthening using earth bags etc for various Canals under Walayar canal section,Para
WP 2023 24 Urgent works for clearing weeds and obstruction, during the water distribution, Emergency tree cutting , emergency bund strengthening using earth bags etc for various canals under Walayar Canal Section, Para.
GENERAL-MP-ES- CMO-Construction of canal bund road between ch 0/350km and 0/450km of field channel off taking from 1/017km of Manjallur branch canal and construction of slab culvert at ch 0/350km- General Civil Work
GENERAL CANAL CLEANING WORKS UNDER PANCHAYATH AREA MP LBC ANNUAL MAINTENANCE OF TASRAK BRANCH CANAL CH 0 000 KM TO CH 3 400 KM IN KODUMBU AND PERUVEMBU PANCHAYATH FOR 2 ND AND 1 ST CROP WATER DISTRIBUTION General Civil work
GENERAL-MP-LBC -Monsoon Preparedness- Removal of waste debris,tree logs and other wastes from Chulannur canal from Ch.0.000km to 38.916km its branches and field bothies before and during the south west monsoon 2024-25 under Malampuzha canal section
Main canal water distribution during 2023-24 engaging labour for watching canal and for clearing obstructions including removal of slipped earth during water distribution and clearing light jungle in the forest area from Ch.16360 m to 28800 m of main
GENERAL WP CSP NP Annual maintenance for 2026 27 Clearing and Removing grass jungle and silt for Tattan canal between ch 0 00 km to 3 500 km and Kovilakam canal in between ch0 00 km to 0 800 km
Emergency works Cutting of dangerous branches of trees along the canal bunds
GENERAL-KPIP-AM-2024-25-Urgent rectification works to Pallikkurup distributary at breached portion near vaniyampara between Ch 0/700 to Ch 0/900 in Kanhirapuzha Grama Panchayath for the year 2024-25- General Civil Work
GENERAL KPIP Clearing grass jungle and silt removal for Valikode Ummanazhi distributories Minor rectification works between ch 1 200 km and ch 1 300 km of Valikode distributary for the year 2023 24 General Civil Work
KPIP-AM-2025-26-Reconstruction of side wall at breached section at Ch 0/030 km of Chooriyod distributary and urgent minor rectification works in RBMC, Chooriyod and Pallikurup distributaries - General civil work.- General Civil Work
RCC 1 1.5 3 for the slab and parapet RCC1 2 4 for the abutment and wing wall PCC 1 4 8 for the foundation and bed PCC 1 3 6 for the canal side wall PCC 1 2 4 for the wearing coat and necessary reinforcements demolishing stone masonry
Earth work DR Packing CC 136 CC148 centering and shuttering
Tree cutting
Rectification works to RBMC by raising the height of canal
GENERALRESTORATION OF CANAL202324Restoration of main canal from ch30m in Kizhayur LIS in Pattambi municipality of Palakkad districtGeneral Civil Work
Annual Plan-Piravanthoor GP Project No 113/2023-24 Kumpnattupadi canal road re concrete in ward21 General Civil Work
LAC ADS 2021-22 PUDUKKAD LAC POONISSERY CAPELA CANAL ROAD CONSTRUCTION, WARD-08 THRIKKUR GP
KKPS Rectification works to Nerchal Parakkal branch canal from ch 1 340 to 1 640km
DESIGN AND BUILD CONTRACT FOR THE RE-CONSTRUCTION OF BRIDGE IN SUBASH CHANDRA BOSE ROAD ACROSS CHILAVANOOR CANAL
DESIGN AND BUILD CONTRACT FOR THE RE-CONSTRUCTION OF BRIDGE IN SUBASH CHANDRA BOSE ROAD ACROSS CHILAVANOOR CANAL
PRONO 98/2025-26 KEEZHALLUR PADUVANATHU CANAL MOOLAYIL PALAM ROAD RETARRING B/N CH(0/00-0/417KM)
S0028/25 Installation of Crash Barrier at MVIP South Kakkad Distributory Canal Road Ward 13 Piravom Municipality(Retender)
The estimate is prepared for engaging labours for canal watching during water distribution of LBC and its branches.
Re tender Providing Drainage facilities and allied works near ch 0 400 km of Kaithakkal Canal Kallara Road
The work is for engaging labour for spillway operation and canal sluice operation for the year 2025-26.
Annual Plan-S0171/23-KAVANAD KIZHAKKE CANAL BUND GRAMAMANDIRAM ROAD RETARRING IN WARD 18 OF MATTATHUR G P-General Civil Work