Loading…
Loading…
13,605 results • Best match
Refer tender documents
Construction of bund road -and culvert at Ch 3.600km of Erumathala sub branch canal
Rectification of Perumudassery dty canal in between 1/200 km and 1/300 km
Renovation of Panchalikulam, Construction of pathway, check dam, parking, boat jetty, supply, installation and ancillary works for Solar Street lighting, landscaping, construction of Burma Bridge, Rope cycling etc
GENERAL-Investigation work of proposed check dam across Manali river at Alpara Chorakadavu in ward no 21 of Pananchery Grama Panchayath-OL-IA/6019/2022-General Civil Work
Protection work with 2m high DRM wall for a length of 75m and desiltation for a length of 126m and depth avg 60cm and repair check dam shutter
1. Dry Laterite Retaining wall up to 1.5M Height (95 Rm) 2. Dry Laterite Retaining wall up to 1M Height (35 Rm) 3. Concrete Check Dam 2.10m wide
Formation of Bund.
GENERAL Annual Maintenance 2025 26 KIP O and M Annual maintanence of canals 2025 2026 Jungle clearence and removal of floating bodies during water distribution from Enathu III distributory between ch 0 m to 2824 m and its 9 field boothies General C
GENERAL-Annual maintenance of canals 2024-25-KIP-RB- RBMC from ch 34320m to 43000m and Enadimangalam distributory from Ch 0m to 6480m Elamannoor -maroor distributory from Ch 0m to 1435m during water distribution for the year 2024-25-General Civil Wor
GENERAL KIP O andp M SECTION 7 2 KALANJOOR Annual maintanance of canals action plan sanctioned works 2024 2025 Konni Distributory from ch 0m to 22125m Vazhamuttom distributory from ch 0m to 4274m and Mallassery distributory from 0m to 984m in connect
GENERAL-Annual maintenance of canals 2025-26-KIP-RB-RBMC from ch 34320m to 43000m Enadimangalam distributory from Ch 0m to 6485m Elamannoor -maroor distributory from Ch 0m to ch 1485m during water distribution for the year 2025-26-General Civil Work
GENERAL Annual Maintenance 2025 26 KIP O and M Annual maintanence of canals 2025 2026 Jungle clearence and removal of floating bodies during water distribution from Edakkadu I distributory between ch 0m to 5100 m and its 8 minor 2 field boothies an
Felling trees cutting branches of tree of girth 90cm to 120cm and girth beyond 120cm,engaging labour for removing slipped earth in canal and chiras and Hire charges of Hitachi other hydraulic machineries for removing fallen tree
In Palappuram branch canal b/w 8/650 km to 8/750 km the Side Wall is fall down to the canal bed and the earth on the sides of bund is sliding in to the canal this make the water flow difficult during recent years
ANNUAL PLAN-Malayattor Neeleswaram GP-PROJECT NO 232/22-23 PURANTHODU CANAL-ROAD SIDE CONCRETING IN WARD 8-General Civil Work
Development of Statue Road, Rameswaram canal Road, Nazrath and Minor Roads in West Kochi (Package 2) Under Smart Cities Mission, Kochi
GENERAL-NABARD - RIDF -XXI.(IWTSector) -Construction of Lock cum Bridge across Badagara -Mahe canal at Moozhikkal, Kozhikode -Electrification-General Electrical Work
Mangalam Project Improvement of canal between ch 16 500km to ch 16 650km of Manjapra LBMC and Removal of floating materials waste and blockages fors mooth water distribution during water distribution period in RB main Canal between ch 10 500 km to
GENERAL CPP MLBC Annual maintanance for the year 2023 24 Engaging man mazdoor labour for removing weeds, waste , debries and flow disturbing materials etc for main canal between ch 12/640 km to ch 21/700 km canal, its branches and distributories
MP LBC PS ANNUAL MAINTENANCE 2022 23 MP LBC Annual Maintenance of Edathara Branch Canal from Ch 0.000Km to 3.850Km and Urgent removal of water borne plants and weeds and maintaining Edathara branch canal from Ch.0.000Km to TD for 2022 23
KIP LB Annual maintenance of canal -Municipal area Jungle clearance and removal of silt from the bed of canal of poovathoor distributory from ch 0m to 3000m Poovathoor Minor from ch 0m to 500m and Removal of floating bodies and accumulated waste from
S-343/26-PROVIDING RUBBLE WORK TO SIDE WALL OF CANAL AND PROVIDING INTRLOCK TILES TO REAR SIDE OF BOT MARKET ,REPLACING DAMAGED SLAB OVER CANAL BEHIND XAVIER HALL NEAR PATTEL MARKET ,REPLACING DAMAGED SLAB TO GEO BAR OPPOSITE DRAIN-DIV 11
MP LBC PS ANNUAL MAINTENANCE 2022 23 MP LBC Annual Maintenance of Kodunthirapully Branch canal from Ch.0.000Km to Ch.7.000 Km and urgent removal of water born plants and weeds and maintaining Kodunthirapully branch canal from Ch.0.000Km to TD for 202
GENERAL-MP-ES-Monsoon Preparedness- 2025-26-Removal of waste ,debris,tree logs and other wastes from Chulannur canal from Ch 0/000km to 38/916km,its branches and field bothies before and during the south west monsoon 2025-26 under Malampuzha Canal
MPLADS 25 26 KIP LB Kottiyam Branch Canal Construction of retaining wall and Handrail on right side in between Ch 11614 m and Ch 11640 m of Kottiyam Branch Canal Along the side of Maithanam KIP road in Kundara Constituency General Civil Work
Rectification work of Olassery branch canal between Ch. 0 150 km to 0 550 km
UrgentWorks for Jungle Clearance and silt removal of Right Bank Main Canal from Ch27.000km to34.270km
MLA-SDF-2023-24 -RENOVATION TO KODANAD WEST BRANCH CANAL BUND ROAD ( AM ROAD TO KURUPPADY KOOTTIKKAL ROAD) SECOND PHASE-OF KOOVAPPADY BLOCK PANCHAYATHGeneral Civil Work
Strengthening the bund of Chelithodu to improve the irrigation facilities of Kaipuzha puncha in Thevelakkara Panchayath-General Civil Work
removal of floating bodies
This estimate is proposed for the maintenance and upkeep of pump and motor and maintenance of damaged canal in Punnathara pump house of Punnathara L I Scheme and removal of silt accumulated in the canal ,
OBT 2019 20 Renovation and removal of Obstructions in link canal from Thevara -Perandoor to Kayal between Manorama and Atlantis
E-575/2020-NCFRW-2019-20- Renovation work of Panayathkulam-Pothanakkad PIP canal Road in ward 13 of Puliyoor GP
Thuravoor GP 2020 Thuravoor GP 2020 21 Pro No 125 2021 Vathakkad Kokkunnu Canal Bund Road in Ward No 1
Annual Plan-Project No 380-2024-25 -Mele Pathichira Canal road Concrete in ward No XVIII Muthalamada GP-Rs- 555000
OBT 2019 20 Renovation and removal of obstruction in thodu starting from T.P canal to Chilavannoor kayal near Kathrikadavu(Punchathodu)
Reconstruction of dilapidated and abandoned LI Scheme.
taring
Annual Plan-PROJ NO 304/25-26-VAIDYASALA CANAL ROAD MAINTENANCE WARD-17 IN VILAKKUDY GP-General Civil Work
Sreekrishnapuram Block Panchayath2020-21 ET-23/20-21 Ummanezhi Urban Bank Tipu Sulthan KPIP Canal Road in Kadampazhipuram GP
SDRF Urgent restoration works for main canal of Karalmanna LIS from Ch 2175m to 3025m Cherpulassery Municipality-2nd phase
GENERAL KIP LB Rectification works Urgent rectification work of LB Main Canal between Ch 44600m to 44850mGeneral Civil Work
GENERAL PSM 2024 25 Improvement works to Pattikkad branch canal between Ch 4100 to 4200 km General Civil Work
Repairs to MI structures 2018- Reconstruction of Unnikutty Branch canal of Thrithala LIS in Thrithala Gramapanchayath in Palakkad District.
-KyIP-ACP PLAN-2024-25-Reconstruction of Culvert near Ch.0/500KM in Atholi Sub distributory canal
Improvements of canal bund road between ch.1/100 to 1/600 at Palakuzha distributory before lift
Pro No 23 PERIYARVALI PUTHIYA PALAM ROAD SRA NEW CANAL BRIDGE ROADTILE PAVING WARD 15 DIVISION 1 retender
Protection works to damaged FC -at ch. 1km starting from Ch. 9km of Aluva branch canal-2025-26