Loading…
Loading…
13,586 results • Best match
GENERAL KIP RB Rectification work of distributaries 2024 KIP O ampM Rectification work of Nediyapadam south distributary between CH 150m and 350m General Civil Work
GENERAL 2024 25 PLAN WORK KIP LB Rectification of Poovattoor distributary in between ch 0 m to 3500 m in Kottarakkara Municipality General Civil Work
GENERAL Urgent Rectification work KIP LB Urgent leak rectification works of Padinjattinkara distributary between ch 0m and 2950m in Veliyam GP General Civil Work 1
canal works
canal work
Canal Bridge
PM Construction of BD canal bund road and renovation of BD canal from ch 0m of L I Scheme Tirunavaya in Tirunavaya pt Balance Work
LAC-ADS-LAC-ADS NENMARA CONSTITUENCY 2019-20 CHIRAKKODE CANAL BUND ROAD IN PALLASSENA G.P-CHIRAKKODE CANAL BUND ROAD IN PALLASSENA G.P-General Civil Work
GENERAL Construction of Lock cum Bridge across Newcut canal at ch 352.709 of west coast canal in Parappanangadi municipality in Malappuram district Investigation Work 1
GENERAL-MP-Annual maintenance-2024-25- Rectification works to the canal between ch. 4.050km and 4.350km of Kuthanur no.1 branch canal.-General Civil Work
PyIP_Desilting of UT near main canal Ch.21_500km, Desilting of Vesala FB near ch.2_300Km, desilting of UT in Azheekkal branch canal near Ch. 11_800Km
MIRPA Providing canal lining to the main canal of LI Scheme Moothikayam from Ch 0 600 m to 0 780m in Moorkanad Panchayath Malappuram Dt
PMI- Construction of canal at 0/450m of Kunnakkavu branch canal of LI Scheme Ramanchadi from ch 0m to 300m in Elamkulam Panchayath, Malappuram District
DEPOSIT-KyIP Deposit 2024-25-(Koyilandi muncipality) Kuruvangadu central Nambrathukutti canal roadbetween ch 0/660 to 0/760 of Kanayancodu dty canal-General Civil Work
GENERAL KIP LB Rectification Urgent Rectification of damaged canal from Ch 4710 to 5210m of Cherumanadu Distributory in Kottarakkara Constituency General Civil Work Canal maintenanace
Annual Plan KVPDY BLOCK 200/2024 25 Interlock tile paving of canal shutter nellimolam pulluvazhi road PVIP canal bund road in ward 17 Rayamangalam GP
NABARD-RIDF XXX-Badagara - Mahe Canal- Vth reach-Construction of a Road Bridge across Badagara Mahe Canal at Thayyilpalam in Kozhikode district-General Civil Work
Project Maintenance-Urgent repairs to Sub canal of Palathole branch canal from ch 1360m to 1560m of LI Scheme, Ramanchadi in Elamkulam Panchayath, Malappuram District
Pro No 217/24-Thrissur corporation -Ollukkara Zonal-Retarring works of vettikkal canal road canal by lanes muslim palli road premium road in Division 18
111/2024-25Maintenance of Kadappillil Aquadate Canal Link Road Manathoor LPS Aquadate Road Chettepeedika Kudukkupara Road Koottathinal Kurishupalli Canal bund road ward 3 Thirumarady GP
Annual Plan-Annual Plan (2025-26) -Thirunnavaya G P- Pro no- 60 - THIRUNNAVAYA CANAL NEDIYARAMKULAM ROAD CONCRETE-THIRUNNAVAYA CANAL NEDIYARAMKULAM ROAD CONCRETE-General Civil Work
GENERAL Rectification Works KIP LB Kottiyam Branch Canal Urgent rectification of Kottiyam Branch Canal from Ch 4200 m to Ch 4350 m General Civil Work
GENERAL CSIND BM CANAL 2ND REACH WORKS Construction of Culvert across Badagara Mahe Canal Bund Road on left bank at Palollathil thazhe General Civil Work
GENERAL Rectification Works KIP LB Kottiyam Branch Canal Urgent rectification of Kottiyam Branch Canal from Ch 17900 m to Ch 18100 m General Civil Work
Annual Plan-Chalakudy Municipality 2025-26 Ward 3 Canal Bund Road Maintanance-Chalakudy Municipality 2025-26 Ward 3 Canal Bund Road Maintanance-General Civil Work
GENERAL CSIND BM CANAL 2ND REACH WORKS Construction of Culvert across Badagara Mahe Canal Bund Road on right bank at Chadayampalam Kottapally General Civil Work
GENERAL ACTION PLAN 2026 27 01 Canal cleaning work of Cheramangalam Main canal for the year 2026 27 Ch 0 000 to 8 400 Km
GENERAL Rectification Works KIP LB Kottiyam Branch Canal Urgent rectification of Kottiyam Branch Canal from Ch 10260 m to Ch 10490 m General Civil Work
Engaging Labour for water distribution through Ramamangalam Branch Canal and its Distributories
Malampuzha Damis the second largest dam and reservoirs in Kerala,located near Palakkad,built post independence by the then Madras state. Situated in the scenic hills of the Western Ghats in the background
Malampuzha Dam is the second largest dam and reservoirs in Kerala,located near Palakkad, built post independence by the then Madras state. Situated in the scenic hills of the Western Ghats in the background it is a combination of a masonry dam
LPGP 2023-24 Canal Ideal School Road Rennovation- Ward 5 (OWN -Rs 2,00,000)-Pro.No. 33/24-General Civil
SDRF- KIP -Sasthamcotta Branch Canal-Urgent Rectification work of under tunnel at Ch.4205m and rectification of leading drains from Ch.4200m to 4245m
Ice company Moonnambalam canal bund road w 6 Mala GP RETENDER
Improving Irrigation facilities to Elappuram padasekharam in Kadakkavoor Panchayath.
GENERAL-AP-2025-26-MP-Annual maintenance-2025-26 - Silt Removal , Jungle Clearance for Kunissery 1, Kunissery 2, Kunissery 3 and Pallavur no.2 sub canals. - General Civil Work
GENERAL Action Plan 2024 25 KIPLB Annual MaintenanceEstimate for removal of floating materials from canals under the section 29 19 Kottiyam during the year 2024 25 General Civil Work
GENERAL-CSIND - Development of Waterways and Canals-Improvements to Boat Channel From Parassinikkadavu boat terminal towards Munambukadavu Boat Jetty in Valapattanam River in Thalipparamba LA Kannur-General Civil Work
Pr no. 155/22- CLEANING VARIOUS CANALS OF ALAPPUZHA MUNICIPALITY-thodu in north east of Thottathodu, Elangumadam north east thodu, SC vibhagam thodu near Thulasi house in Punnamada ward
GENERAL-KIP Annual Maintenance 2023-2024-KIP Annual Maintenance of canals-LBMC from ch 13500m to 26129m,Melila East distributory and jungle clearance of Nellippally campus-General Civil Work
GENERALKIP Oand M SECTION 7 2 KALANJOOR Annual Maintenance of canals action plan sanctioned works 2024-2025Kalanjoor trashrack in connection with water distribution for the year 20242025General Civil Work
GENERAL-PSM 2025-26 - Maintenance works-Emergency clearance, repairs and tree cutting in KERI campus, RBMC and LBMC canals during summer rains under headworks section Peechi-General Civil Work
KyIP 2024-25 Construction of Canal bund road between ch 0/300 km and 0/400 km of pallikkara field bothie canal (Pallikkara central L.P canal mukku-vattakuni thazha road ) in Tikkodi grama panchayath-Phase 1-General Civil Work
Urgent rectification works to Chilambilly branch canal
ALAPPUZHA MUNCIPALITY ZONE I- PROVIDING DRAINAGE FACILITIES BY CONSTRUCTING CUT AND COVER IN KOCHIMGGANAMPARAMBU ROAD IN CANAL WARD - PROVIDING NEW PIPE LINE INSTEAD OF EXISTING PIPE LINE
Construction of DRM retaining wall,Conrete work,GSB,WMM,BM,BC works
Rectify the damaged canal lining
Lining of RB Main Canal
Rectify the damaged canal lining
Rectification of canal