Loading…
Loading…
13,586 results • Best match
GENERAL-MP-LBC-KS-2023-24-Annual maintenance of Kuthanur 1, Kuthanur 2, Puthucode and Kuzhalmannam sub canals for 2023-24 second crop and 2024 first crop.- General Civil Work
CPP-TMS-ACTION PLAN-2026- 27- Engaging Labour For Removing Obstructions And Blockages During Water Distribution And During Monsoon Seasons For Main, Branches And Distributory Canals Under Section 2/1
Urgent Rectification work to Pandanad branch canal near ch 5000m PIPLBC
GENERAL BSP Main Canal Surplus BSP Providing a screw driven mechanical shutter for the surplus escape of the Main canal at ch 2730 General Mechanical Work Retender
MBP 116/2021-22 (Re-Tender) Construction of VCB/Check dam at Ichilangodu -Hulisinadi in mangalpady Grama Panchayath
Rectification of canal
Rectification of canal
Canal maintenance works
Annual maintenance of canal
Annual maintenance of canal
PIP-RBC-Annual Maintenance- Kaviyoor Branch Canal from Ch. 0m to 3605 m and Puramattom distributary for the year 2022- 23
GENERAL-KIP(LB)-Additional rectification of Paravur distributary relining of canal between ch7350-7500,9500-10000 and 11500- 11590m.-General Civil Work
Canal cleaning
Canal rectification
Rectification works in Aluva branch canal.
Rectification work in Edappally branch canal.
-Rectification works to the CADA canal
Rectification work to canal
Rectification works of canal
Canal and checkdam repair
canal lining , plastering etc
Rectification works Maniyur Branch canal
MANKUTTIPADAM AYYAPPASAMAJAM CANAL BUND ROAD
Prevention leakage
Rectification of field channel
Rectification of canal
Annual maintenance
Construction of Drainage Canal in Poopara Colony under Karimala Range during 2019-20
2022-23 Kollayil GP - 23/23, Protection of Panayammoole Canal Bund (Ward-13)
GENERAL PSM Improvement works to Velappaya Branch canal between Ch 0 150 to 0 300 Km for the year 2025 26 General Civil Work
GENERAL PSM Rectification works of Amballur Branch Canal from Ch 9/300 to 9/500 km for the year 2024 25 General Civil Work
GENERAL PSM Improvement works to Thanikudam distributory canal between Ch 01 250 to 01 400 Km for the year 2025 26 General Civil Work
GENERAL PSM Improvement works to Thanikudam distributory canal between Ch 01 100 to 01 250 Km for the year 2025 26 General Civil Work
Rectification of EK Canal Cyclonic Monsoon 2021 Protecting the damaged side wall Ch 407.930km of EK Canal near Karaparamba Road bridge on the west side in Kozhikode corporation
SDRF LBC Sub Division Malampuzha Project, Palakkad Urgent rectification and maintenance works of field channel sluice No.5 Ch.1.030km of Pulinelli branch canal at Perigottukurissi canal
MP LBC Urgent canal cleaning works of Erimayur branch canal from ch 0 000km to 15 035km for the year 2022 23.2nd and 1st crop water distribution.
DEPOSIT-Ayyappankkavu Thachankkad Canal Bund Road- between ch 2-250km and ch 2-350 km of Odannur Branch Canal in Mathur Grama Panchayath in Kuzhalmannam Block Panchayath
MP LBC Urgent Rectification works to the weak and vulnerable portion of the canal bund in between Ch. 12.900 km to 13.000 km of Erimayur branch canal
GENERAL Badagara Mahe Canal Vth reach Construction of a steel foot bridge across Badagara Mahe canal at Kelothkandi thazhe at Ch. 466.600 km General Civil Work 1
LRRP-2024-25 Thrithala LAC, Sl.No. 3038 Ummathur Thonikadavu Canal Koni varambu Road, Anakkara GP, Palakkad District.-LRRP -Ummathur Thonikadavu Canal Koni varambu Road-General Civil Work
GENERAL-ANNUAL PROJECTS-2022 23- PROJECT NO 198/23 LIBRARYPPADI CANAL BUND ROAD KARINGAZHA MANEKKAV MINIPPADI-RAMALLOOR PVIP CANAL ROAD MAINTENANCE IN WARD 4-General Civil Work
Annual Plan-Irinjalakuda municipality Pro.340/23 Ettumury Canal Bund road,Akshaya to Canal base road,Kombara west end road improvements-in ward 21-General Civil Work
GENERAL03 2023 24 Clearing the cut and cover Kolliyil Branch canal Clearing the cut and cover including silt removal upto Ch 1536 m in Kolliyil Branch canal
PyIP _Clearing jungle and desiltation of Edakkad Branch Canal between Ch 0_000km and Ch 4_700km and rectification work to canal near Ch 4_700km for the year 2022_23
GENERAL-ANNUAL PROJECTS 2024-25- PROJECT NO 7/25 VAYANASHALA CANAL ROAD WATER TANK ROAD VALIYAKAVU VENGOLI ROAD CANAL BUND HANDRAIL IN WARD 15-General Civil Work
SDRF LBC Sub Division Malampuzha Project, Palakkad Urgent rectification and maintenance works of field channel sluice No. 4, Ch. 2.590km of kottyi branch canal at Perigottukurissi canal.
GENERAL KIP RB Canal road maintenance Renovation and Reconstruction of KIP Canal bank road from ch 590m to 1830 m in Thenmala Grama Panchayath General Civil Work
DEPOSIT-DEPOSIT 2025-26-Kolathur North Canal Road Re-tarring(Canal Inspection road b/w Ch 15/600Km and Ch 17/600Km of KBC) General Civil Work
DEPOSIT-DEPOSIT 2024-25-Olayimmal Angadi -Kolathur Canal road Renovation ( Canal Inspection road b/w Ch 19/215Km to Ch 19/415Km of KBC)-General Civil Work
SDRF LBC Sub Division Malampuzha Project, Palakkad Urgent rectification and maintenance works of field channel sluice No.5 Ch.1.600km of Odannur branch canal at Perigottukurissi canal.