Loading…
Loading…
3,686 results • Best match
FOR THE WORK OF REPAIR OF HEAD, CROSS REGULATOR AND ESCAPE GATE OF HARERI BRANCH CANAL R.D 31.00 KM. TO R.D 52.830 KM. AND TIDNI SUB MINOR R.D. 0.463 KM. TO R.D. 4.15 KM. OF LEFT BANK CANAL OF R.A.B.L.S. PROJECT
Construction of Road from Gram Borghati to Kalwana Canal Babri Road Length 4.00 Km
Repair and maintenance of 12 nos Sluice/Canal Gates situated in Maihar, Amarpatan and Nagod block in Satna district.
Oiling greasing and minor maintenance work of canal gate of CRMC S.D.O.L/M.E/M sub Division BHIND
earthwork (silt removal) from CD U/S and D/S Nallah At chain 2141,2161,2223,2265,2203,2386,2283 and 2107 of Tawa Left Bank Main canal.
CONSTRUCTION OF CC ROAD AND DRAIN AT WARD NO. 08 HOUSE OF BANTI TO CANAL. UNDER MUNICIPAL COUNCIL BHIATRWAR DISTT. GWALIOR
Construction of Road from Roojankhedi Mandi Canal to Muslim Mohalla Road Length 2.80 Km.
Construction of AQUADUCT at R.D. 450 m to R.D. 690 m of Main Canal including construction of abutment, wings returns , piers and pipe laying of AQUADUCT of Main Canal with all required arrangement of Ghughara Nalla Tank Project on Turnkey basis
PROVIDING OF WORKERS FOR DAM SAFETY AND PATROLLING WORK AT KAKA SAHAB GADGIL SAGAR MAIN, EARTHEN DAM AND CANAL SYSTEM
Repair work of CR Gates and Escape Gates at CH No 555 of Bariyarpur Left Canal Project District Chhatarpur (M.P.)
Increasing Height of Dam and waste weir extension of canal with structure of Manirampura Tank Project Tehsil Ashta, Distt. Sehore.
Pipe laying in heavy cutting to increase irrigation in tall potion of Richhannalla Tank Block Amarwara in Distict Chhindwara Madhya Pradesh Including GST
Estimate for P.S. to 1 No. 5HP Irrigation Pump Connection at village Itawakhurd under Gopalpur D/c of (OandM) Dn. Bhairunda
Construction of I Type Quarter Hand Pump and Hume Pipe Culvert at Parkul Medium Irrigation Project in Teshil Jaisinagar Distt Sagar
Civil work for Construction of 33 KV feeder bay (for Jamunia Micro Pressurized Irrigation System) at 132 KV S/S Chourai
Shifting of 11 KV Line at village Rakhsi affected by construction of approach Road of Banda Irrigation Project District Sagar (M.P.).
Shifting of 11 KV Line (AG) near Village VIRORA PAHAD affected by Submergence of Duriyan Ghat Irrigation Project District Niwari (M.P.)
On turnkey basis- Construction of B.T. diversion road between village Madiyagond to Padwar including in live structure under Banda Irrigation Project.
Shifting of 11 KV Line at Village Silera to Hafsili Affected by Submergence of Kadhan Medium Irrigation Project District Sagar (MP)
Environment clearance of Pawa and Sonpura Irrigation Project district Shivpuri from Ministry of Environment Forest an Climate Change Govt. of India
Construction of Rampur Manasa Pressurized Micro Lift Major Irrigation scheme, as per detailed scope of work but not limited to that.
Construction of CC Lining in main canal RD 0 M to 1000M of Raiguwan Tank, District-Panna (M.P.)
Regarding Laying the Pipe in the Canal dug to fill the Pond in the Regional Park at Indore
Patch Repair and Maintenance of Datia carrier Canal, Latesra and Orchha Dy, and its minor and Sub minor.
iConstruction of Weir wall at RD 1.20 Km and R.D. 11.45 of Sihawal Main canal under special repair
Construction of Balance work of Dam and Canal with lining and earthwork including structures for Pati Tank scheme.
Supply and errection of different size of new gates for minor and sub minor under mahana distributory canal.
Hiring of inspection vehicles at Shivpuri, Narwar, Karera places for circle, division offices under Sindh Project Canal Circle
Construction of balance work of main canal including minor structure and lining in selected reaches under Jaswantpura tank.
Repair and maintenance work of C.R., H.R. and escape gate situated at different R.D. in sihawal Main canal.
Annual Repair For Canal Work of Upla, Unchi, Narawala, Lotandev, Kismari, Khadkal, Kansel, Hathikhoh and Chouki Tank Project
Repair work of structures and lining of Shamsherpura canal Tank due to heavy rainfall. Tehsil Biaora Distt. Rajgarh.
Annual Repair work of pipe aquaduct at RD 435m of Canal of Nayakheda Tank Tehsil Chanderi Distt. Ashoknagar
Construction of Protection wall from RD 1500 M To 1700 M. of Kalmukhi Distributory of ISP Main Canal.
Construction of concrete chanel at Damaged protion RD 360 to 510 Mtr. of main Canal of Manirampura tank.
REPAIR AND MAINTENANCE WORKS OF MAIN CANAL RD 1800 M. TO 5500 M. OF KAKA SAHAB GADGIL SAGAR
Repair work of damaged canal structure of Gurgaon Minor Tank, Themgaon Minor Tank and spill of Junawani Tank.
Jungle clearance and silt Removal at Ch. 1542 to 1698 of Bagh RBC Main Canal System Distt. Balaghat
FOR THE WORK OF REPAIR OF HEAD AND CROSSREGULATORGATE OF LEFT BANK MAIN CANAL RD. 66.995 KM.OF R.A.B.L.SPROJECT.
Repair of head sluice gates of thanwar dam and CR ESC at chain 41 of Thanwar main canal
Repair work of L.B.C. and R.B.C. Canal and Structure of Lasudiya Kanger Tank under W.R. Sub Division Ichhawar.
Construction of Ingui (Chourai Seonda road) to Lahar Amayan road via Baraha Road (Canal Portion) length 14.20 Km.
Repair and Maintenance of minor gates at different minors of right bank canal system of bansagar main dam.
Repair of Canal Escape Sluice Gates of Dhooty RBC Chain 0 at Dhooty LBC SubDivision No 06 Balaghat
FOR THE WORK OF REPAIR OF WALK WAY ENTRANCE STAIRS NEAR LBC CANAL SLUICE GATE OF R.A.B.L.S. PROJECT.
Repair and maintenance of Minor, Subminor gates of Chachai Distributory of Bansagar Purwa Canal Situated at Different Places.
Exevation side drain and Exevation of Nalla near RD 1500 M of Exit Channel of I.S.P. Main Canal.
REPAIR AND MAINTANANCE WORK FOR KUMHARNALA TANK, CANAL and AQUEDUCT WORK UNDER WRSUB DIVISION NO1 BURHANPUR Distt BURHANPUR
Construction Work Of Rampahadi Nahar To Digwar Via 33 Cell Nahar Canal Road Length 9.00 Km. (Second Call)
Construction of Escape and Repair work of V.R.B. Canal of Jamuniya Tank under Ghoghra Project Sub Division Sehore.