Loading…
Loading…
40 live12 closing this weekmost from PWD- Roads and Bridges and West Central Railway
40 results • Best match
Boring work for Major Bridges, Minor Bridges under PWD Bridge Sub Division No-2 Bhopal
Piplod Yard :- Providing out foot over bridge at (KM 501/21-23).
Painting and metalizing of steel girder bridge & ROBs on Bhopal division.
Survey, Investigation, Preparation of D.P.R. and Boring Work for New Bridge Works in Bridge Construction (MPPWD) Betul Sub Division.
Construction of High Level Bridge Including Approach Road Across Johila River on Beldongri to Ufrikhurd road District Anooppur
Annual and Repair Work Including Survey and investigetion in Bridges Under P W D Bridge Construction Sub Division BalaGhat Part 2
Annual and Repair Work Including Survey and investigetion in Bridges Under P W D Bridge Construction Sub Division BalaGhat Part-1
Construction of 2 nos. high-level bridge on Pohri-Piparghar road and Pohri - Mandi road in the submergence area of Sarkula Dam
Construction of Submersible Bridge Including Approach Road Across Chambal River From Harnawada to Jahangeerpur Road District Ujjain
Construction of Submersible Bridge Including Approach Road Across Chamla River on Sarola to Lohariya Road District Ujjain
Construction of Submersible Bridge Including Approach Road Across Chamla River Near Karadwas Village Including Electrical Pole Shifting District Ujjain
Construction of bridges at Tilawad Govind approach road km 1/4 1/8, Kalapipal kurawar raod km 14/10, 14/4, Akodiya Sundarsi Road km 2/4, 3/10, 22/6, 23/6, Polaykala ranayal road km 21/8, 25/4, Agar sarangpur road to mandoda karju raod km 3/10, Jadmi
Part A) Bhopal Division:- Ruthiyai-Maksi: Improvement to Bridge health condition by repairing exposed slab reinforcement, parapet wall, wing and return wall, inspection steps, flooring, and other miscellaneous works at 28 Minor Bridges (Br No.1128/1, ... 12 Major Bridges (Br ...
Maintenance work of Bridges at Distt. Barwani Group A
Construction of 4 lane Road Over Bridge of 1 x 42.00m Clear span Composite Girder at km: 370/33-35 in lieu of L-Xing no. 190 at Dhoswas Yard between Chanderiya-Ratlam section and Re-building of ROB no. 289 (existing 2-lane to new 4-lane of 54.50m span Composite Girder) at Km 654/54-55 at Ratlam Yard, between Godhra-Nagda section - Ratlam Division of Western Railway.
Jabalpur division:- Proposed Ramp on Existing FOB at Salhana station under Assistant Divisional Engineer (Maintenance) Katni.
Construction of Remaining Part of Ankiya-Barkheda- Dogargaon- Bahraval Road including Bridges.
Kota Division:- Maintenance of bridges by replacement of bearings, providing protection plate on open web through girders, replacement of loose HFSG bolt/rivets found in detail inspection, changing of damage floor system of pathway, oiling ... of bridges , ... various bridges .
Jabalpur division:- Proposed Ramp on Existing FOB at Bikrampur (BMR) and Ghatpindrai (GPC) stations under Assitant Divisional Engineer Narsinghpur.
REHABILITATION, SPECIAL STRENGTHENING AND REPAIR OF BRIDGES IN BHIND DATIA AND MORENA DISTRICT
Jabalpur division:- Proposed Ramp on Existing FOB at Gurra (GRO), Guramkhedi (GMD), Bagratawa (BGTA) stations under Assistant Divisional Engineer Pipariya.
Repairing of Bridges and Culverts of Road Under PWD Sub Division Beohari Division Shahdol.
Epoxy Painting on 24 nos. radial gates with trunnion/motor/hydraulic pump/hydraulic tank/hoist bridge/foot bridge/control panels of 25 nos railing and its auxiliary fitting of Retam Barrage Project Malhargarh Mandsaur under DRIP-II
B.T. AND WMM PATCH REPAIR AND REPAIR OF BRIDGE/CULVERT APPROACH IN DIFFERENT WORK IN DIFFERENT ROAD UNDER PWD SUB DIVISION SEHORE (ZONAL TENDER)
Ratlam Division: Providing Subway(RUB) (RCC Box 02 Nos.) at Km: 53/23-25 bet SPBG- UJN at Hariphatak Ujjain.
REHABILITATION, SPECIAL STRENGTHENING AND REPAIR OF BRIDGES IN GWALIOR, SHIVPURI, SHEOPUR, GUNA, ASHOKNAGAR AND MORENA DISTRICT
Bhopal Division:- Rehabilitation of ROB No. 584/1 retaining wall of Down side at Khandwa - Itarsi section under ADEN/M/Harda.
DESIGN AND CONSTRUCTION OF PROPOSED RAIL OVER BRIDGE (ROB) BETWEEN RAILWAY KM 67/10-11 BETWEEN INDORE STATION AND DEWAS RAILWAY STATIONS ALONG MR-12 ROAD IN TPS 08 INDORE
GUNA-GWL: Part A)- Provisional of Additional Openings at LHS-81 (5.00 X 2.70 m) and LHS-56 (5.00 X 2.70 m) as RUB by pushing method (Using RH Girder), LHS- 116 (5.00 x 2.70 m) and LHS-03 (5.00 X 2.70 m) as RUB by Cut Cover method. Part B) Provision of Additional opening as water-way Bridge at km 1263/21-23 by Pushing Technique (Using RH Girder).
Construction of Village Chaplasar to High School road, Length 1.40 Km. 1st Call, PAC Rs. 153.84 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 150 days i/c rainy season.
Part A)-Guna-Gwalior section- Rehabilitation and improvement of bridges condition by repairing of RCC Slabs Pier/Abutments/Toe wall/wing wall/Return wall, inspection steps, flooring and bank pitching (Total 18 bridges) Bridges no 1098/2, 1101/1, 1116/1, 1118/1, 1143/1, 1152/1,1157/1, 1163/1, 1170/2, 1173/2, 1177/2, 1187/1, 1187/2, 1189/1, 1189/2, 1194/1, 1281/1, 1304/1. Part B)- Improvement to Approach road, Provision of sump well & Pump Room shed, Provision of Cross drain, Fixed barricading at various LHS in Guna-Gwalior section under ADEN/M/Shivpuri Section.
Strengthening work of Raisalpur Ridhodakheda Bamhangaon road, Length 4.33 Km under P.W.D. Sub Dn. Narmadapuram. 5th Call, PAC Rs. 200.62 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
PROJECT MANAGEMENT CONSULTANCY SERVICES FOR DESIGN AND CONSTRUCTION OF PROPOSED RAIL OVER BRIDGE (ROB) BETWEEN RAILWAY KM 67/10-11 BETWEEN INDORE STATION AND DEWAS RAILWAY STATIONS ALONG MR-12 ROAD IN TPS-08 INDORE
Excavation, loading and transportation of pond ash from 111 ha ash pond of STPS Sarni to WCR ROB sites at LC Nos. 225, 227, 228 and 230 for use as backfill material in RE wall approaches.
B.T. Renewal of Umardha to Pasighat and other roads Total length 15.90 Km. under PWD. Sub Dn. Pipariya. 11th Call, PAC Rs. 224.29 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days ex/c rainy season.
Consultancy Services for DPR Preparation for OTI of Jirapur-Khilchipur and Biaora-Sironj Sections of NH-752B and Upgradation of 06 Existing Bridges/Culverts on NH-347C in the State of Madhya Pradesh.
Work contract for checking, calibration, stamping and certification, legal metrology etc as per prevailing rules/norms from Weights and Measurement deptt. Govt. of MP weigh bridges at Ash silo of Ash Handling Plant, Stage-I and II, SSTPP, Dongalia.
Survey for Proposed Bridge Under PWD Bridge Construction Sub Division Khargone Distt. Alirajpur
Survey for Proposed Bridge Under PWD Bridge Construction Sub Division Khargone Distt. Barwani
Survey for Proposed Bridge Under PWD Bridge Construction Sub Division Khargone Distt. Khargone