Loading…
Loading…
36 live8 closing this weekmost from North Western Railway and CE Public Works Department
36 results • Best match
"Comprehensive Bridge Maintenance of all Important, Major and Minor Bridges in jurisdiction of CGM Ajmer Unit"
JP- Preparation & Submission GAD of minor bridges .Preparing Building lay outs plans & drawing of level crossing & land plans etc.
Construction of twelve Mega/Major Bridges between Ambamahuda and Kui in C/W Taranga Hill Abu Road via Ambaji New BG Line Project in Ajmer Division.
S&T work inconnection with "Provision of 2-lane road over bridge (ROB) in lieu of LC No: 116 at km: 933/08-10 between Gurla-Keshorai Patan stations".[2026]
Preparation of Detailed Project Report (DPRs) for various ROB and RUB works ( 81 nos LC) over North western Railway
S&T Works in connection with: Construction of 12 Mtr Foot Over Bridge at CMU, VMA,SGZ & GOH and BWM Station.
Construction work of a high-level bridge over the Parvan River near Khejda village, between Manoharthana Road and Dewri Jagir in Jhalawar district (Manoharthana), Jhalawar
Additional work for completion of Devgarh Madariya - Nathdwara GC section including Protection Works, ROB/RUB Approaches, Platforms, Platform Shelters,RUB Covering Shed, Circulating Area, Drain, Retaining wall, Quarter works and other Ancillary Works connection with Devgarh Madariya - Nathdwara Gauge Conversion Project under Ajmer Division of North Western Railway.
Additional RUB Boxes Casting Work at RUB 321/03-04 and 321/09-10 on Lalgarh Bikaner Railway Section
KRLS- Provision of FOB with ramp at Kurlasi station to eliminate deficiency in MEA
DKRA- Provision of FOB with ramp at Dhuankheri station to eliminate deficiency in MEA
Restoration and Rehabilitation work in ROB on Manglana-Makrana-Borawad SH-2B
Replacement of 0.61 mt. multiple span bridges (06 nos bridges) by RCC box bridge in DNA-MTD section in the Jurisdiction of DEN/North
Replacement of existing pipe bridges below of size 0.90m Dia in to RCC Box bridges in the jurisdiction of Sr. DEN/South of Jodhpur Division.
Construction of Bridge at Orai River on Bhungariya Fusriya Road Dist Chittorgarh
Construction of approach road for RUB No. 127A on HSR-BTI section under ADEN/Sirsa.
Construction of Bridge at Orai River on Bhungariya – Fusriya road – Distt. Chittorgarh
NIT No. 15/2026-27 for Restoration and Rehabilitation work in ROB on Manglana-Makrana-Borawad SH-2B
CD 8430-000541 SLPRS MEN S RUB BLACK S 10, CE 8415- 000013 GOWN OPERATING, CE 8405-000068 TR SLEP FLANNEL SIZE 4, K3 7210-000008 BLNKT HOSP BROWN, CE 8405-000066 TR SLEP FLANNEL SIZE 2
Construction of ROB at LC-60 in Bikaner Merta Section at 575/3-4 Km., District Nagaur. (BA 2026-27).
Construction of ROB at LC-113 in Merta Road Jodhpur Section at 540/2-3 Km., District Nagaur. (BA 2026-27).
Reconstruction of Damaged Pipe Culverts - 2 Nos. (Ch.108/000 and 127/500), Slab Culverts - 4 Nos. (Ch.113/800, 114/900, 118/600 and 127/000), and Minor Bridge at Ch. 15/900 on NH-927A
Strengthening of Substructure and Replacement of existing Fish bellied plate girders upto 12.20m Span of Major bridges Br. No 736UP (4x12.2m) at KM:554/0-2,Balance work of Br No.750UP (10x12.2m) at KM:564/8-9, Br No.792UP (9x12.2m) at KM:597/0-1, Br No.823UP (2x12.2m) at KM:621/9-622/0, Br.No.848UP (2x12.2m) atKM:639/5-6 by Post tensioned PSC Slabs, Lifting/Linking of Track, Supply of Ballast, Earthwork, Blanketing work and other ancillary work as per 25T loading standard in the jurisdiction of Dy.CE/Bridge Line - 1/JP on MD-PNU Section of Ajmer division.
Providing Project General Management Services for various constructionsites/sections for New Line, Doubling, Bypass Line, ROB/RUBs Projectsbeing executed by Construction Organization in the jurisdiction of NorthWestern Railway.
Construction of 2 Lane ROB in Lieu of LC-09 at IR Km 340/9-341/0 Ratangarh-Degana Section on Ratangarh- Chhapar Road (SH-07C) in District Churu EPC Mode
Construction of ROB at LC 99 in Merta road Degana Section at Km. 519/9-8 and Merta road Mertacity Section at C1 IR Km. 1/0-1, District Nagaur. (BA 2026-27).
SR (Special Repair) work Providing safety railing on 2-lane ROB and its approaches in lieu of existing level crossing (LC No. C-61) at Km 165.550 on NH-89 in Nagaur City
LNR - Provision of FOB with ramp at Lunirichha to eliminate deficiency in MEA and Thuria - Provision of FOB with ramp at Thuria to eliminate deficiency in MEA and KRLS - Provision of FOB with ramp at Kurlasi to eliminate deficiency in MEA and DKRA - ... of FOB with ...
Improvement to various bridges by repairing of pitching, steps, protecting of piers, abutments, by scouring and other Misc. works in the jurisdiction of Sr. DEN/South of Jodhpur Division
Provision of RUB of size 2x4.00m x2.50m at LC no. 140 (Kote Gate Phatak) and pedestrian Subway of size 4m x 2.5m at LC No. 141 (Sankhla Phatak) with covering and other ancillary Work in Bikaner-Lalgarh section over Bikaner division.
Electric Work in connection with (i)Provision of additional new platform no. 4 & 5, Extension of existing FOB & Second entry at Jaisalmer station.(ii) Provision of two running line cover shed & cat walk on both pit line at Jaisalmer Station. (iii) Construction of 01 no. pit line with associated facilities at JSM.
HEX. BUSH 50X25 BORE, as per IS:1239(PT.2)92TAB 27AISI 304 THREADS TO ISO7/1, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQUATE STRENGTH. TRANSIT DAMAGE , IF ANY , SHALL BE AT THE COST OF SUPPLIER.
JP- Electrical work in connection with [1] Raising the level of PF to high level at BWL & HSI and extension of length of PF at BWL,HSI & GLNA stations .Provision of FOB at KVGM halt station, [2] Raising the level of PF to high level at PSL, MJNL , GAL & KNAR halt and extension of length of PF to 600 meters at BU ,KNAR & SRRG stations.
JP Div-Electrical work in c/w Raising the level of PF No. 1 & 2 from Medium Level to High Level at Jhir (JHIR), Jatwara (JW), Kanauta (KUT), Bhankri (BAK) stations, Raising the level of PF No. 1 from Medium level to High level & PF No 2 from Rail ... of FOB at ...
Work for Construction of Intake well inside Chambal River including Approach Bridge construction of RWR including all works required for inlet inside RWR outlet system from RWR to outlet chamber WTP CWR RWPH and allied works Package 1 under JJM