16 live3 closing this weekmost from North East Frontier Railway and Ministry of Road Transport and Highways
16 results • Best match
Maintenance of Intelligent Water Level Monitoring Instruments (WLMI) for two years for identified Important/Major bridges under Bridge-Line Unit of N.F. Railway (Remote site annual maintenance & technical supports and hardware AMC for two years at ... various Bridges over
At TTB : Extension of two nos minor bridge and Provision of additional line in connection with goods loading/unloading facility.(Phase I)
Provision of High-Level Platform No.2, PP Shed, Water Vat, FOB with Lift and other ancillary works at Nilambazar.
Provision of High-level Platform No.2, PP shed, water Vat, FOB with Lift and other ancillary works at Panisagar.
Painting of 13 nos. and floor painting of 34 nos. steel bridges on various sections having approximate surface area 85554 Sqm and lubrication of 31 nos. bridges under the jurisdiction of SSE/BR/LMG.
Electrical Works for 1) At TSK Division: Provision of 01 no RUB by elimination of L- Xing (RM-267) AT Km 307/5-6 at TSK Division. 2) Proposed construction of RUB/LHS in lieu of LC Gate No. RM-282 at km 329/6-7 between section BGND-GOM under the ... of RUB /LHS ... no RUB by ... no RUB at ... no RUB at ... no RUB at ...
Electrical Works for (i)At TSK Division:- Provision of 01 no RUB at MD-2 at (KM13/9- 14/0) in KOWN-LPK section at TSK Division. (ii)Provision of 01 no RUB by elimination of L-Xing No ST-89 at Km 360/3-4 in TTB-MXN section at TSK Division. ... no RUB at ... nos. RUB at ... nos. RUB at ...
Dewatering of water logged RUB No-[NN-171, NN-173, NN-184, NN-187, NN- 188,NN-192, NN-194, NN-209, NN-211,NN-219,NN-223, NN-236, NN-237, NN-239, NN-241, NN-246, NN-258, NN-259, NN-260, NN-261 , NN-266 NN-153, NN-155, NN- 157, NN-159, NN-166 (In BG/II ... [Total RUB 29 ... each RUB in ...
Shifting of existing LC gate No. ST-34 SPL at CH:104/736 for 45 m towards CPK end due to construction of ROB. (Electric Portion)
Re-development and renovation of Agartala station - provision of 12 m FOB with Lift, Escalator, station building and improvement to circulating area in connection with development of Agartala Station (phase-1) (Electric portion).
Request for Proposal (RFP) for providing Project consultant (PC) for providing "Comprehensive Consultancy services from the stage of Feasibility Study & DPR preparation for elimination of Level Crossing gates in NF Railway by constructing ROB and/ ... and/ RUB /LHS/Other ...
Request for Proposal (RFP) for providing Project consultant (PC) for providing "Comprehensive Consultancy services from the stage of Feasibility Study & DPR preparation for elimination of Level Crossing gates in NF Railway by constructing ROB and/ ... and/ RUB /LHS/Other ...
(A) Through painting of 05 nos. steel bridge and floor painting of 33 nos. steel bridge on various sections having approximate surface area 1054362 sqm and Lubrication of bearing of 47 nos. of steel bridges under the jurisdiction of SSE/BR/SCL. (B) ... steel bridges on ...
Construction of ROB at LC No.NN-1(Manned) at Km 2/2-3 in between NJP-ABFC, LC No-BR-11 at Km 22/1-2 between station Raiganj to Bamangram connecting road Dalkhola to Bakkhali, Raiganj.
Consultancy Services for preparation of DPR for upgradation from 2L PS to 4L of NH-127D from km 0.00 to km 48.6 and construction of ROB with approaches on NH-715A at km 85.840 under Rangia NH Division in the State of Assam.
ZERO TOE LOAD FASTENING SYSTEM (ZTLF) : INSULATED ZTLF FOR 60 KG RAIL OVER H-BEAM SLEEPERS ON GIRDER BRIDGES (B.G.) WITH COMPLETE FITTINGS EXCLUDING ERC (FOR TRACK CIRCUITED AREA) (SPECIFICATION, DRAWING AND ITEM DETAILS AS MENTIONED IN SET DOCUMENTS ARE APPLICABLE) DRG: (RDSO) RDSO/T-9779 To RDSO/T-9789 ALT NIL SPEC: (RDSO) Specs for ZTLF system, (RDSO) T- 55-2025 Revision-01 SET DOC: SET Document FOR RT-9779 To RT-9789.