33 live10 closing this weekmost from East Coast Railway and CE RW I
33 results • Best match
Reconstruction of Bridges Major Bridge at Takera at Ch 184.200 and four Minor Bridge at Ch189.400, 190.600,191.400 and 193.200 on NH-57 in the state of Odisha on EPC mode
Proposed standardization of Height Gauges as per RDSO standard at the locations of LHS, RUB & major bridges of steel girders in HDS-PRDP Section under the jurisdiction of ADEN/II/CTC of Khurda Road division
Provision of side pathway to 14 Nos. PSC Girder Bridges (49 Spans) in between LPG-DFR & HATB-HNPA sections under the jurisdiction of SSE/Bridge/Sambalpur of Sambalpur Division.
Execution of Earthwork in formation, Minor bridges, Major Bridges, Station Buildings, Service Buildings, P-way linking work, Ballast supply, Platform work , PF shelter, drain work, camping facilities, protection works, Tunnel between Ch: 116.205 km to Ch: 116.415 km, and other allied works between Barkote(Ex) (Ch: 98.325 km) - Mahuldiha(Ex) (Ch: 117.525 km) including Ambagaon yard in connection with Talcher - Bimalagarh New BG Rail Link Project.
Construction of HL Bridge over the river Kathajodi to connect from Mukameswar to Purighat(Devi Gada).
Construction of H.L. Major Bridge across River Songarh at Km. 97.958 and Minor Bridge at Singkhaman Km. 87.790 on Balangir-Bhawanipatana Road (NH-26) in the State of Odisha on EPC mode
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from Km 69.60 to Km 125.18 involving Earthwork in Formation , Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Under Bridge ... (RUBs), Road Over Bridge (ROB's), ...
Gunupur-Theruvali New BG line project : Design and Construction of New BG Railway line from Km 122.750 to Km 141.940 (Excluding RCC BOX, ROB Br. No 388 from km 137.725 to 137.925 but including P Way & OHE works) involving 08 Nos of Tunnels (T-2 to ... Drains, Minor Bridges , ... Bridges, Major Bridge , ... Bridge, Road Over Bridge (ROBs), ... (ROBs), Road Under Bridge (RUBs), ... Girder Bridges , ... Buildings, FOB , ...
Repair and Renovation of Foot Bridge over NBC near Giriga Bhoisahi.
Repair and Renovation of Foot Bridge over NBC at RD 16.70Km. near Athantar Nayaksahi.
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from KM 41.50 to Km 69.60 (including Nunkhari Station) involving Earthwork in formation, Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, ... Bridges, Major Bridge , ... Bridge, Road Under Bridge (RUBs), ...
Jeypore - Nabarangpur New BG Railway Line project: Design & Construction of New BG Railway Line between Ambaguda(excluding) (13.60 Km) to Nabarangpur(including) (43.996Km) involving Earthwork in Formation in Embankment/Cutting, Blanketing, Side ... Drains, Minor Bridges , ... Bridges, Major Bridges (excluding ... Over Bridges (ROBs), ... Under Bridges (RUBs), ... Girder Bridges , ...
Provision of RDSO Standard Height Gauges (5 Sets) at RUB locations and provision of additional Sacrificial Height Gauges (32 Sets) at LHS/RUB locations over Khurda Road Division.
Construction of bridge over Baitarani river at 1.150Km on Erendei to Mirigikhoji Road
Construction of bridge over river Ong on Loharakote to Khaliamal via Sareikela Road
Construction of bridge over river Budhabalanga (Bhendia Ghat) on Kudiapal Chhaka to Kalabadia road
Construction of bridge over Luna river at 5th Km on Ranipada to Tentalpur Road connecting Sahadevpur village
Testing of Bridges of TSTPS MGR Circuit for structural adequacies for plying 25 T axle load.
Provision of Ramp to the existing FOB and additional Platform Shelters with water Booths and benches at AMB & JNRD stations in Sambalpur Division.
Shifting of lines and Sub-Station between ROB (LC-125) at KM 308.200 Vishakhapatnam Howarh main line in the District of Bhadrak.
Construction of FOB at Munda Sahi, Jarapada, Katada, Luhamunda , handpa and katibari on Angul Sambalpur of NH 55 in the state of Odisha on EPC Mode
Earthwork in formation, Construction of Major Minor Bridges, retaining wall, Drains, Supply of ballast, P. Way Materials Track linking works, Construction of building and allied works from Ch 9/190 Km TakeOff to Ch 15/342 Km DE in connection
Construction of bridge over Birupa at 6.00Km on Itua to Athamania road in the District of Cuttack under SBY for the year 2024-25
Annual Maintenance for a period of 3 years of Automatic Water Level Gauge installed at 10 different bridges of Khurda Road Division.
Provision of Additional Platform Shelters and Water Booths near GS Coaches at BGBR & LSX stations and Provision of Ramp to the existing FOB and Additional Platform Shelters with Water Booths and Benches at BGBR & NPD stations in Sambalpur Division.
Supply, installation and commissioning of CCTV system at electronics in- motion weigh bridges, railway entry point and exit point and supply and installation of display units at Gate no.-2.
Through Painting of various steel girder bridges between KTV - MVG - KRDL stations for the year 2026 -27 on KK Line under SSE/Bridge/ARK & JDB in the jurisdiction of Assistant Divisional Engineer(Bridge)/Rayagada.
Provision of side pathway on underslung Girder Bridges of 30.5 metre span of Bridge No. 343 UP (Span 1 to 20) between LAE-THV sections under the jurisdiction of SSE/Bridge/Titilagarh of Sambalpur Division.
Construction of ROB 2 lane with carriage width of 7.5mtr with Railway portion span 1x60m BSG 1x18mtr CG at km 425 33.5 in lieu of LC No. 215 and including LHS 1x5.0mx3.6m between Panposh Kalunga station at Kalunga yard Excl. Railway Portion work
Construction of road from Taramakanta Chhaka to Rugudi Sahi with construction of bridge over Ranima at 3rd Km. on Taramakanta Chhaka to Rugudi Sahi road (Span 6x10.77 mtr.) in the District of Keonjhar under DMF for the year 2025-26.
Improvement to Sudanga-Hatapada Chhaka Balamulia Sahi from 0/00 Km. to 3/600 Km. with Construction of Bridge over Malda Nallah on Sudanga-Hatapada Chhak Balamulia Sahi (Span 6x10.77 mtr.) in the District of Keonjhar under DMF for the year 2025-26.
Supply & testing of infrared Thermal imaging camera IP65 rated for dust and water proof, 2m drop test, suitable for harsh industrial environments 2Hr charging time, 5Hr battery life, infrared resolution - 120X90, frame rate -9Hz , thermal sensitivity ... visible FOB (HXV)-320X240, ...
Construction of H.L. Bridge over Sorei Nallah at 1st Km on Marutikar to Daniabara Road