Loading…
Loading…
43 live34 closing this weekmost from PWD and Rural Development and Panchayati Raj
43 results • Best match
Special Repair and Maintenance work on Piers And Abutments of Important and Major Bridges from PMPE To BAHL in the section Of SSE/W/BAHL under ADEN/BDGM. (Revenue Work 2026-27)
Special work for repair of damaged flooring, protection in approaches of minor / Major bridges in section under SSE/works/MCTM from km 2.00 to 54.00 in MCTM- SVDK Station. (Revenue Work 2026-27)
Construction of Wooden Foot Bridge at Ditch Renai
Restoration of Partially Damaged Foot Bridge and Gazebo PartII
Construction of Protection Bund Both Sides foot Bridge at Brail
C/O FOOT BRIDGE NEAR ARPAT NALLAH NLO MUSHTAQ GAFFAR AND OTHERS
construction foot bridge at naav khul near shop of sajad najar at sholipora A
CONSTRUCTION OF FOOT BRIDGE AT SHAHTTAL AT WANIGAM PAYEEN A BLOCK PATTAN SCHEME ADP PRI
Construction of 1x25M Span with CWW 2M Foot Bridge at Downstream of Darish Kadal Bridge.
Macadamization of road from Bonamsar to Foot Bridge main road at Sonawar approx. 1/2kms.
Construction of Iron Foot Bridge near H O Syed Shabir Moosvi and Others at Mahwara Budgam
Construction of Wooden Foot Bridge at Burzalgoth Kibbar Wildlife Chenab Division Kishtwar for the Year 2026 27
Construction of Wooden Foot Bridge at Maithwan Renai Wildlife Chenab Division Kishtwar for the Year 2026 27
Construction of Wooden Foot Bridge at Kiddar Nanth Wildlife Chenab Division Kishtwar for the Year 2026 27
Construction of Foot Bridge at Harh ward no 1. Under PRI Distt REASl for the year 2026-27
Construction of Wooden Foot Bridge at Jabbal Dudharhang Renai Wildlife Chenab Division Kishtwar for the Year 2026 27
C/O FOOT BRIDGE NLO BASHIR NADAF, MAQBAOOL NADAF, ALI NADAF, MUSHTAQ NADAF, AND OTHERS AT SRIGUWARA BLOCK DPORA
Hakhran Nallah-Const. Of FP Work on R/S at village Ard poolia U/S Foot Bridge RD 5520 m
Construction of Wooden Foot Bridge at upper chugnu Nanth span 90 ft Wildlife Chenab Division Kishtwar for the Year 2026 27
FP Bund at left side of Sandran River from Yarbal to foot bridge at Herpora Muniwar Anantnag RD km 43 300 mtrs
Construction of 50 Mtr. Span Steel Foot Bridge Over Neeru Nallah at New Basti Bharudu Tehsil Bhaderwah District Doda (Actual Span 38 Mtr)
C/O FOOT BRIDGE AT ZAINGEER CANAL NHO AB HAMEED RESHI AT MUNDJI, PYT MUNDJI UNDER ADP(PRI) YEAR 2026-27 BLOCK -ZAINGEER
Const. of Balance work of Wooden foot Bridge at Mandihar nalla ward no 04 05 Pyt Sarsote Block Chassana under PRI Distt Reasi for the year 2026-27
Construction of 5 Meter span Foot Bridges at Nigli Tourist Resort
Construction of 5 Meter span Foot Bridges at Ningli Tourist Resort
Engagement Of Consultant for Providing Consultancy Services Including Preparation of DPR for Construction of 04 Nos of Bridges
Preparation of DPR for Construction of 04 Nos of Bridges of Spans as shown in BOQ in PMGSY Division Kupwara
Preparation of DPR for Construction of 04 No of Bridges of Span 50m 30m 20m 20 m in District Baramulla PIU Uri
Stage Contract for maintenance of Roads Bridges (P/L of RCC pipes/clearance of drains, repair/renovation of drains, R/walls slip clearance (Part II) (Sub Division Bagtore
Stage Contract for maintenance of Roads Bridges (P/L of RCC pipes/clearance of drains, repair/renovation of drains, R/walls slip clearance (Part II) (Sub Division Gurez
Engagement of Consultant for Providing Consultancy Services Including Survey, Detailed Investigations, Study, Soil Testing, Structural Design, Estimation, Preparation of Detailed Project Report for 10 no. bridges in Ramban Division
Providing Consultancy Services Including Survey, Detailed Investigations, Study, Soil Testing, Structural Design, Estimation, Preparation of Detailed Project Report, Getting it vetted from DIQCvorvNITvorIIT for 10 No. of missing bridges under PMGSY
Providing Consultancy Services Including Survey, Detailed Investigations, Study, Soil Testing, Structural Design, Estimation, Preparation of Detailed Project Report Getting it vetted from DIQC NIT IIT for 16 No of missing bridges PIU Doda
Stage Contractor for maintenance of Roads and Bridges (P/L of RCC Pipes/clearance of drains repair/renovation of drains, R/walls Slip clearance (Part-II) pertaining to RandB Sub Division Sangrama for the year 2026-27
Repair and maintenance of Bridges and Tunnels including repair to flooring, protection works, waterway cleaning, raising of drains etc. in the section of SSE/W/BAHL on BAHL-BRML section under ADEN/BDGM (Revenue work 2026-27)