Loading…
Loading…
31 live8 closing this weekmost from East Central Railway and Bihar Rajya Pul Nirman Nigam Limited
31 results • Best match
Shifting of OHE Mast and LT crossing in connection with Construction of New Major bridge no.- 47 (18x18.3m composite girder) over river DHADHAR at km 33.087 between Sarsu & ORO statlon , Minor bridges, RUB, Retaining wall, Earthwork, Blanketing and ... of Major bridge to ...
Engineering procurement and Construction (EPC) of Construction of Viaducts, ROR/RFO, Major Bridges, Minor Bridges, Animal Underpass, RUB/LHS, Tunnel/Cut- Cover, Earthwork, Blanketing, trolley refuge, turfing, Buildings, retaining wall, toe wall etc. and other associated worksfor construction of new Double Line track for DFCC loading from Ch.158.00 to Ch.184 in Koderma Detour section in Sonnagar- Andal 3rd and 4th line project on EPC Mode in Dhanbad Division of East Central Railway.
Engineering, Procurement and Construction (EPC) Agreement for Construction of New BG Rail line including earth work, blanketing, minor bridges, major bridges, Track works, Station building, buildings and other miscellaneous works for 25T Indian Railway Standard Loading from Sitamarhi (excluding) to Rewasi (including) (i.e.Ch. 0.700 to 12.400) (Total length = 11.70km) in connection with Sitamarhi-Sheohar New BG Rail line project in East Central Railway in the state of Bihar
Engineering, Procurement and Construction (EPC) Tender for"Construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, LC work and other miscellaneous works for 25T Indian Railway Standard Loading from Raxaul (excl.) to Narkatiaganj (excl.) (i.e. Ch.189.400 to 227.200) (total- 37.80 Km) in connection with doubling of Raxaul - Narkatiaganj section in Samastipur Division of East Central Railway"
Periodical painting of steel girder Bridge of Bridge no.- 33UP(1X12.20), 33DN(1X12.20), 44UP(2X12.20), 44DN(2X12.20), 62DN(5X12.20) in BJU-SPJ-MFP Section ,14DN(1X12.20), 15 DN(4X12.20), 21 UP(5X12.20), 22 UP(4X12.20), 23 UP(2X12.20) in HJP-MFP ... 78BDN RUB (9X18.30), ... 78CDN RUB (3X18.30), ... , ROB NO-21ROB ... 25 ROB (1X12.20+2X7.925) ... 1B ROB (1X12.80+2X7.925) ... Section, ROB 3SPL ... (1X50), ROB 7SPL ... 47SPL(2x35.76+1x33.96), ROB 19C ...
Engineering Procurement and Construction (EPC) for "Construction of doubling work including earthwork, blanketing, minor bridges, major bridges, LHS/RUBs, track works, platform work, station building, FOBs, other buildings, associated S&T and Electrical Utility Shifting works and associated miscellaneous works for 25T Indian Railway Standard Loading from KARNAUTI station(including-Ch. 2.844 KM) to BIHAR SHARIF station(excluding-Ch 29.350 KM), from Ch. 1.900 KM to 28.192 KM (Total- 26.292 km) in connection with the Doubling of the Bakhtiyarpur-Rajgir - Tilaiya section"
Strengthening of FOB by replacement of steel girder, corroded steel member, RCC slab etc at FOB between Patna Saheeb and Gulzarbagh stations on main line of Danapur Division
Provision of Top Chord inspection pathway on 40 nos OWG bridges and Side pathway on 02 nos bridges under SSE/BR/SPJ in SPJ Division.
Inspection of Br. No.-10 UP (15X61.00M OWG) & ROB-23A (1X60.0 M BSG) in KIR- BJU section under SSE/Bridge/MGR and Br.no.-78UP(2X18.3+8x76.2+4x18.3m OWG) & ROB Govindchak (2X60.0M BSG) in HJP-CI Section, ROB-47A (1X56.60 M BSG) in KIR-BJU section & ... & ROB 3 ...
(I) Drainage system rectification measures at RUB No. 130 & 132 with CCTV, W.L. indicator, road signages board & speed breaker between GWH-DEIA section. (II) Drainage system rectification measures at RUB No. 140 & 144 with CCTV, W.L. Indicator, road ... at RUB No. ... at RUB No. ...
CS for FS and Prep. of DPR for improvement to 2 lane with PS from Mishraulia to Bhengari of NH 727B and CS for Prep. of DPR for construction of 4 lane ROB parallel to existing old ROB over Samastipur_Darbhanga railway line at KM 67.000 of NH 322.
Provision of Bearing inspection platforms on 140 nos. of bridges/ROBs under SSE/BR/SPJ in SPJ Division.
Construction of HL RCC Bridge (9X29.85M) in place of Existing old damaged bridge over Suknar River at 80th Km of NH 333A Khaira-Sono Road, Mangobandar Bridge, in the District of Jamui.
Construction of High Level RCC Bridge (16 x 29.85m) in place of old damaged Bridge Over Kiul river at Nariyana Ghat on NH-333A in 72nd Km of Khaira-Sono road in District of Jamui.
(i) S&T Work: Utility shifting of LC Gate No. 01 between DBG-MHP and LC No. 28 between DBG-KKHT in connection with the work " Construction of ROB at LC No.- 01 between Darbhanga-Muhamadpur and LC No. 28 between Darbhanga- Kakarghati, (ii) S&T Work: ... of ROB at ... of ROB at ...
Associate Signaling work for provision of RUB/LHS in Lieu of Level Crossing No. EB- 12 at KM 13/9-10 in between EKI-BLGT under the jurisdiction of SSE/Works/OMLF
Modification of OHE due launching scheme for proposed ROB at Rly Km 317/29 - 318/01 in between station Goldenganj - Chhapra Gramin Junction and at Road Km 157+880 of NH - 19.
A.OHE modification work in connection with "TEMPORARY SHIFTING OF L-XING IN CONNECTION WITH CONSTRUCTION OF ROB IN LIEU OF L.C. NO.-2'SPL' CLASS AT KM- 39/9-40/0 (FROM SPJ), KM-2.260 (FROM DBG) BETWEEN DARBHANGA - SHISHO STATION IN DBG - SMI ... OF ROB IN ...
Rockfall protection, slope stabilization and Debris Flow Protection alongwith other associated miscellaneous works for vulnerable locations from Kheraund (Excluding) to Major Bridge 108 (Excluding ) and Km. 41.500 to 42.220 (on Left Side in increasing chainage direction) & Km. 41.710 to 41.900 (on Right Side in increasing chainage direction) in connection with new BG Line between Tilaiya to Koderma under the jurisdiction of Dy.CE/Construction/ Dhanbad
Telecom work in connection with provision of RUB/LHS in Lieu of Level Crossing No. EB-18 at KM 26/4-5 & EB-34 at KM 50/3-4 in between EKI-BLGT under the jurisdiction of SSE/WORKS/OMLF.
Annual maintenance charges for already installed Scour monitoring System at two (02) bridges of Br. No.-16 DN in KIR-BJUsection Under SSE/Br./MGR & 78 UP in HJP- CI Section Under SSE/Br./SEE for 3 years under Dy. CE/BRL/HJP.
SEE Division - Provision of associate S&T work in connection with provision of LHS in lieu of LC no. 1 (BCA-VPDA) , LC no. 2 (BCA-VPDA), LC no. 44 (CSR-AYRN) and provision of RUB in lieu of LC no. 7'B' (VPDA-BCA), 13'C'(MOG-VPDA) & LC no. 14'A'(MOG-VPDA).
Construction of Station Building, EI Building, others Building, Platform, FOB, PP shelter, Dismantling of existing building & Others structures and other ancillary civil works such as drain work, retaining walls, road works etc. from Gomoh CH 300.15 to Koderma CH 393.55 in connection with 3rd & 4th multitrack project between PKA-MPO section of Dhanbad Division of ECR under Dy.CE/HZME-I
Provision of RCC box in lieu of RCC pipe/EWP pipe of 5 bridges (Br. No. 07, 08, 12, 13 & 17) in connection with "Provision of RCC box in lieu of RCC pipe/EWP pipe of 7 bridges (Br. No. 03 KM-51/14 b/w MFP-RD, Br. No. 03A KM-51/10-11 b/w MFP-RD, Br. No. 07 KM - 47/6-7 b/w MFP-RD, Br. No. 08 KM - 46/12-13 b/w RD-TUR, Br. No. 12 KM - 44/4-5 b/w RD-TUR, Br. No. 13 KM- 43/9-10 b/w RD-TUR, Br. No. 17 KM- 41/3-4 b/w RD-TUR) in MFP-TUR section."
Telecom work in connection with provision of RUB/LHS in Lieu of Level Crossing No. NC-60 at KM 152/1-2 in between BOE-KDPR under the jurisdiction of SSE/WORKS/BOE, Level Crossing No. EB-13 at KM 19/6-7 & Level Crossing No. EB- 16 at KM 23/3-4 in between EKI-BLGT under the jurisdiction of SSE/WORKS/OMLF.
Construction of a drain in Ward No. 03 of Bettiah Municipal Corporation?extending from the house of Vijay Patel, passing by the house of Santosh Patel, and reaching the main drain near the house of Krishna Patel?along with the construction and ... of bridges at ...
Construction of substructure of Br. No. 382(1x61.0 M OWG) & 383(1x61.0 M OWG) for two lines and transportation, assembling and launching of superstructure of Br. No. 382(1x61.0 M OWG),383(1x61.0 M OWG) ,Br. No. 383(B)(1x61.0 M OWG) & 383(C)(1x61.0 M ... on bridges , ...
Request for Proposal for Selection of Acquiring Bank for State Funded Toll Fee Plazas on Roads and Bridges of Road Construction Department in the state of Bihar
1. Provision of Limited height sub-way in lieu of LC No. 27/C b/w MSK - MNE at Km 109/2-4. 2. Provision of RUB in lieu of LC No. 16-C/E-2 b/w NNA - THB at Km 67.84. 3. Provision of Limited height sub-way in lieu of LC No. 21 B b/w BRKB - PSR at Km 86/10-12. 4. Provision of Limited height sub-way in lieu of LC No. 7/C b/w KUE - BKHR at Km 37/19-21 5. Provision of Limited height sub-way in lieu of LC No. 10 at km 53/1-3 between NNA-KTRH Section of SEE Division.
Periodical painting of steel bridge girder of Br. No. 29. (3x18.3+3x12.2+26x9.14+1x4.58), 66 (2x12.2+15x9.14), 146 (16x18.30), 179 (14x18.30), 213 (8 x18.30), 240 (9x18.30), 321(2x12.2+3x24.4), 29 New (12 x 30.5), 66 New(6x30.5), 100 New (5 x 30.5), ... 92 RUB (1x45.72), ...
Custom Bid for Services - Cleaning of Railway Platforms including Garbage Removal of way side minor stations, Custom Bid for Services - Cleaning of Passenger area including Garbage Removalof way side minor stations, Custom Bid for Services - Cleaning ... of FOB , ...