Loading…
Loading…
808 live343 closing this weekmost from Public Works Department and East Central Railway
808 results • Best match
Boring work for Major Bridges, Minor Bridges under PWD Bridge Sub Division No-2 Bhopal
Construction of Major Bridges, Minor Bridges, Service Buildings, allied and associated works in connection with Construction of Champa-Korba 3rd Line of South East Central Railway, Bilaspur.
Execution of Chakulia Yard Modification including Foot Over Bridge, Minor Bridges, Service Building etc. and other miscellaneous works under jurisdiction of Dy CE/Con/II/Kharagpur, S. E. Railway.
Provision of 3.0 meter wide Foot over Bridge (FOB) at Sariabanjara (SBJ) Railway station.
Shifting of OHE Mast and LT crossing in connection with Construction of New Major bridge no.- 47 (18x18.3m composite girder) over river DHADHAR at km 33.087 between Sarsu & ORO statlon , Minor bridges, RUB, Retaining wall, Earthwork, Blanketing and ... of Major bridge to ...
Reconstruction of Bridges Major Bridge at Takera at Ch 184.200 and four Minor Bridge at Ch189.400, 190.600,191.400 and 193.200 on NH-57 in the state of Odisha on EPC mode
DESIGN, ENGINEERING, PROCUREMENT, MANUFACTURE, FABRICATION, SUPPLY, TRANSPORTATION, CONSTRUCTION, ERECTION, TESTING COMMISSIONING, OPERATIONS MANAGEMENT FOR 3 YEARS OF FOOT OVER BRIDGE (FOB) AT ADA OFFICE, ALIGARH
"Comprehensive Bridge Maintenance of all Important, Major and Minor Bridges in jurisdiction of CGM Ajmer Unit"
Construction of Major Bridge over Shedhi River on Mahemdabad Nadiad Road (SH-03) at Chainage 40/350 to 41/450 (District Kheda)
Proposed standardization of Height Gauges as per RDSO standard at the locations of LHS, RUB & major bridges of steel girders in HDS-PRDP Section under the jurisdiction of ADEN/II/CTC of Khurda Road division
Engineering procurement and Construction (EPC) of Construction of Viaducts, ROR/RFO, Major Bridges, Minor Bridges, Animal Underpass, RUB/LHS, Tunnel/Cut- Cover, Earthwork, Blanketing, trolley refuge, turfing, Buildings, retaining wall, toe wall etc. and other associated worksfor construction of new Double Line track for DFCC loading from Ch.158.00 to Ch.184 in Koderma Detour section in Sonnagar- Andal 3rd and 4th line project on EPC Mode in Dhanbad Division of East Central Railway.
Construction of New Railway BG line in Km 28/970 to 42/040 in between Kulthana Station (including) and Rajpura Station (including) Earthwork, Minor bridges (03 Nos) and Major bridges (07 Nos), station buildings, Tunnels (7 Nos) and MEGA Bridge (03 Nos) including Electrification in connection with Ratlam Mhow Khandwa Gauge Conversion in the State of Madhya Pradesh.
Architectural and Engineering Consultancy services for construction of Foot Over Bridge (FOB) at Boulevard Road near Kashmere Gate Metro Station Gate No. 3 and 4, 5 and 6 Delhi.
OHE modification in connection with Rebuilding / strengthening of Major bridges no. 1020, 1022, 1051, 1038 & 1008 in Khodiyar - Mahesana section
CHENNAI BEACH-VILLUPURAM Section - In addition to ROB (A) Proposed construction of 6.0m wide Foot Over Bridges in lieu of LC 47 between Kattangulathur and Singaperumal Koil stations (B) Proposed construction of 3.0m wide Foot Over Bridge in lieu of ... wide Foot Over Bridge in ...
JP- Preparation & Submission GAD of minor bridges .Preparing Building lay outs plans & drawing of level crossing & land plans etc.
Construction of New BG Double Line from Balodabazar (Km 110.500) to Parmalkasa (Km 280.840) and Y-connectivities from Lakholi station and Marauda Y Cabin including earthwork, Bridges, Rail over Rail (ROR) Bridge , Road over Bridge (ROB), Road under Bridge ... ( RUB ), ...
Provision of 6m wide foot Over Bridge with lifts at Chandannagar station.
Piplod Yard :- Providing out foot over bridge at (KM 501/21-23).
Foot Over Bridge ke paas divider par railing lagane ka karye.
Mathura-Palwal- Replacement of Arch Bridge no. 1433/1 UP & 1459/2 UP of minor bridges with RCC Box culvert.
Construction of Road Over Bridge (ROB) including Roads and allied facilities at Tuna – Tekra on Engineering, Procurement and Construction (EPC) Mode
Name of work:SW-I-Guntakal Division-Gooty - Wadi Section: Proposal for Construction of Two-lane ROB in lieu of L.C. No. 213 at km. 547/5-7 at Matmari Station yard.Bridge Proper: Span as 2X36.0m Composite Girder. Approaches: Span 6 X 30.0m PSC Girder ... X18.46m PSC Girder (on ... 30.0m PSC Girder (on ... lane ROB in ... 30.0m PSC Girder +1 ... X18.46m PSC Girder (on ... 30.0m PSC Girder (on ... two-lane ROB in ... 5x30.0m PSC girder approach ...
Provision of side pathway to 14 Nos. PSC Girder Bridges (49 Spans) in between LPG-DFR & HATB-HNPA sections under the jurisdiction of SSE/Bridge/Sambalpur of Sambalpur Division.
Execution of Earthwork in formation, Minor bridges, Major Bridges, Station Buildings, Service Buildings, P-way linking work, Ballast supply, Platform work , PF shelter, drain work, camping facilities, protection works, Tunnel between Ch: 116.205 km to Ch: 116.415 km, and other allied works between Barkote(Ex) (Ch: 98.325 km) - Mahuldiha(Ex) (Ch: 117.525 km) including Ambagaon yard in connection with Talcher - Bimalagarh New BG Rail Link Project.
Engineering, Procurement and Construction (EPC) Agreement for Construction of New BG Rail line including earth work, blanketing, minor bridges, major bridges, Track works, Station building, buildings and other miscellaneous works for 25T Indian Railway Standard Loading from Sitamarhi (excluding) to Rewasi (including) (i.e.Ch. 0.700 to 12.400) (Total length = 11.70km) in connection with Sitamarhi-Sheohar New BG Rail line project in East Central Railway in the state of Bihar
Engineering, Procurement and Construction (EPC) Tender for"Construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, LC work and other miscellaneous works for 25T Indian Railway Standard Loading from Raxaul (excl.) to Narkatiaganj (excl.) (i.e. Ch.189.400 to 227.200) (total- 37.80 Km) in connection with doubling of Raxaul - Narkatiaganj section in Samastipur Division of East Central Railway"
Construction of twelve Mega/Major Bridges between Ambamahuda and Kui in C/W Taranga Hill Abu Road via Ambaji New BG Line Project in Ajmer Division.
Repair and Replacement of Worn-out RCC Slab of Foot Over bridge (FOB) at BHD, KHKN, HUK, RDDE, HNN, SLKN, GNU, SNP (Hindu College) and allied Works in the section of SSE/W/SNP under ADEN/PNP.
S&T work for Construction of Bridges and other associated works for Drainage improvement of TATA East Yard.
Construction of HL Bridge over the river Kathajodi to connect from Mukameswar to Purighat(Devi Gada).
Construction of New BG Double Line from Kharsia (Km 0.00) to Balodabazar (Km 110.500) and Y-connectivity from Jharadih including earthwork in formation, bridges, ROR (Rail Over Rail), ROB (Road Over Bridge), RUB (Road Under Bridge), service buildings, staff quarters, P-Way works (including supply of Ballast, P-way material exept Rail), Electrification (2x25 KV OHE, PSI, PLC & Electrical General work), and Signalling & Telecommunication works, along with allied and associated miscellaneous works in connection with Kharsia- Parmalkasa 5th & 6th New BG Line Project under South East Central Railway in the State of Chhattisgarh.
Construction of 2 lane ROB in lieu of LC no.1 as 1X30.00m Composite Girder (Railway Span) + 3x18.71m PSC Girder+1x10.5m RCC Slab (Towards Amaravathy Nagar) + 2x18.71m PSC Girder+1x10.5m RCC Slab (Towards Desihalli)(Approach Span)+ RE Blocks and Retaining Wall (Approach Portion)) at km 1/800-900 along with LHS between BWT-COL stations of BWT-MKM section of SBC division. (Composite work)
Construction of 2 lane ROB in lieu of LC no.162 as 1x36.00m Composite Girder (Railway Span) + 3x18.71m PSC Girder+1x10.5m RCC Slab (Towards Kolar) + 2x18.71m PSC Girder+1x10.5m RCC Slab (Towards Bangarpet) (Approach Span) + RE Blocks and Retaining Wall (Approach Portion)at km 144/900-145/000 and construction of pedestrian subway between BWT-KQZ stations of YNK-BWT section of SBC division. (Composite work)
Construction of H.L. Major Bridge across River Songarh at Km. 97.958 and Minor Bridge at Singkhaman Km. 87.790 on Balangir-Bhawanipatana Road (NH-26) in the State of Odisha on EPC mode
Maintenance of Intelligent Water Level Monitoring Instruments (WLMI) for two years for identified Important/Major bridges under Bridge-Line Unit of N.F. Railway (Remote site annual maintenance & technical supports and hardware AMC for two years at ... various Bridges over
0935/2026/E1Additional strengtheing of steel foot over bridge at karaiyar to chinnamaylar kanikudiyiruppu thamirabarani river in vickramasingapuram municipality
Construction of 3rd line work including earthwork, blanketing, minor bridges, major bridges, LC work and other miscellaneous works for 25.0T and DFC feeder route of Indian Railway Standard Loading, execution of indoor & outdoor S&T works, execution of general electrical works, installation and commissioning of 2x25 kV overhead equipment (OHE) for traction and power supply in connection with the 3rd Line work of Chandil- Madhukunda section in Adra Division of South Eastern Railway on Engineering, Procurement & Construction (EPC) Mode.
Detailed Design Consultancy (DDC) Services for C2 Package 1 , ROB/RUB works of Corridor 4 and other works.
Preparation and submission of DPR for different ROB/RUB sites in lieu of LC under Sr.DEN-I/FZR.
Painting and metalizing of steel girder bridge & ROBs on Bhopal division.
Periodical painting of steel girder Bridge of Bridge no.- 33UP(1X12.20), 33DN(1X12.20), 44UP(2X12.20), 44DN(2X12.20), 62DN(5X12.20) in BJU-SPJ-MFP Section ,14DN(1X12.20), 15 DN(4X12.20), 21 UP(5X12.20), 22 UP(4X12.20), 23 UP(2X12.20) in HJP-MFP ... 78BDN RUB (9X18.30), ... 78CDN RUB (3X18.30), ... , ROB NO-21ROB ... 25 ROB (1X12.20+2X7.925) ... 1B ROB (1X12.80+2X7.925) ... Section, ROB 3SPL ... (1X50), ROB 7SPL ... 47SPL(2x35.76+1x33.96), ROB 19C ...
Additions and alterations to OHE in connection with Proposed construction of new Road over Bridge and Road under Bridge in lieu of LC No. 319 between GALA and MBD stations of BZA Division.
S&T work inconnection with "Provision of 2-lane road over bridge (ROB) in lieu of LC No: 116 at km: 933/08-10 between Gurla-Keshorai Patan stations".[2026]
Preparation of Detailed Project Report (DPRs) for various ROB and RUB works ( 81 nos LC) over North western Railway
Request for Proposal for Engineering, Procurement & Construction (EPC) Mode for Construction Of Major Bridges (34 Nos) between Hosapete (Excl.) And Ballari (Excl.) Stations, as part of Ballari- Hosapete 3rd & 4th line project.