9 live1 closing this weekmost from Northern Railway and Haryana Board Corporation
9 results • Best match
Provision of 3.0 meter wide Foot over Bridge (FOB) at Sariabanjara (SBJ) Railway station.
(i)Repairs to Sump Well, Recharge Pit, Retaining wall, Pointing, Painting, Desilting/Cleaning and other miscellaneous works at LHS on RPJ-DUI, LDH-DUI, DUI-HSR section under ADEN/PTA. (ii) Repair and Painting of FOB'S at various station , Damaged ... of ROB on ... and Minor Bridges on ...
Construction of 2-lane ROB in lieu of LC No. 20-C at Railway Km. 32/12-14 on DLI-UMB section near Narela Railway Station crossing Akbarpur Barota to Kheri Manajat Road (Balance Work)
Emergent work of lighting arrangement over and under the ROB constructed in lieu of LC No 28 at Railway Km 31 8 9 Delhi Shamli Section Tatiri ROB on NH334B Meerut to Haryana border via Baghpat
Providing, Installation And Commissioning Of Electronic Weigh Bridges ( 100mt Capacity, Pit Less Type) In Various Market Yards Of Distt. Kaithal
Reconstruction of Existing ROB No. 108-A at Km 43/11-12 between Malerkotla and Kup Railway Stations on Ludhiana-Dhuri- Jakhal Section for Movement of Double Stack Containers
Rail Structure Interaction (RSI) Analysis and Submission of Report using MIDAS Rail Track Module as per the latest UIC 774-3R and RDSO Guidelines, including Recommendation of Remedial Measures for Continuation of LWR Track on Unballasted Bridges over Ambala Division of Northern Railway.
shifting of Sewerage Line for construction of ROB at LC 146 spl at km 226/1-2 Rewari Bathinda Section at Mini By Pass of Sirsa Junction with NH 09
Electrical work in connection with Provsion of Ramps to existing FOB at NSG-5 class stations on Nabha and Sunam Udham Singh Wala,Extension and raising of existing Platforms to High Level at Sunam udham singh wala and Nabha,Raising of existing Platform no. 2 to High level at Shambhu and provision of lifts 2 nos. at Shambhu and 3 nos at Sarai Banjara station and provision of Tactile Guiding and Warning tiles at Platforms on Fatehgarh Sahib, Bassi Pathanam, Noganwan, New Morinda, Morinda, Kurali, Mianpur, Rupnagar, Ghanauli, Bharatgarh, Kiratpur Sahib, Nangal Dam, Raimehatpur, Una Himachal, Panoh, Churaru Takrala, Amb Andaura, Chintpurni Marg, Daulatpur Chowk, Ambala City, Rajpura, Sarai Banjara, Sirhind, Raising of Passenger Platform no. 1 from Rail Level to High level along with extension upto 600 Meter at Sadhugarh station on UMB LDH section,Raising of Passenger Platform no. 1 from Medium Level to High level along with extension upto 600 Meter at Chawapail station on UMB - LDH section and Provision of Lifts at Una Himachal Railway Station over Ambala Division.