Loading…
Loading…
20 live10 closing this weekmost from South Coast Railway and PRED
20 results • Best match
Name of work:SW-I-Guntakal Division-Gooty - Wadi Section: Proposal for Construction of Two-lane ROB in lieu of L.C. No. 213 at km. 547/5-7 at Matmari Station yard.Bridge Proper: Span as 2X36.0m Composite Girder. Approaches: Span 6 X 30.0m PSC Girder ... X18.46m PSC Girder (on ... 30.0m PSC Girder (on ... lane ROB in ... 30.0m PSC Girder +1 ... X18.46m PSC Girder (on ... 30.0m PSC Girder (on ... two-lane ROB in ... 5x30.0m PSC girder approach ...
Additions and alterations to OHE in connection with Proposed construction of new Road over Bridge and Road under Bridge in lieu of LC No. 319 between GALA and MBD stations of BZA Division.
Reconstruction of Minor Bridge in Km 0/10 of Chevitikallu - VatsavaiRoad (SH-030) in Krishna District
Guntakal Division - Modification works to OHE in connection with (i) Proposed Construction Of 6 lane RUB with (2x15m) at Bharathi cements siding executed by NHAI in connection with expansion of NH 544 G (HX-SBC) (Km: Ch:122.131) (ii) Proposed ... lane ROB at ... two-lane ROB in ... Lane Road Over Bridge (Rob) ... ( Rob ) ... lane ROB in ... two-lane ROB at ...
Urgent Repairs to Minor Bridge at Km 2/10 of Pedapalem to Revendrapadu Bridge (via) Srungarapuram road in Guntur District.(2nd Call)
S&T portion of work in connection with proposed ROB/LHS at various LC Gates ML- 456, ML-453, ML-460, ML-466, ML-469, RV-278, RV-274, ML-442, RV-290, RV-291, RV-292, RV-317, VM-4, ML-446 & ML-447 and RUB/LHS at Km 862/29A-31A.
Supply of Gym Equipment to Foot over bridge center in Manoji Cheruvu 5th ward, Peddapuram Municipality (General Fund) 2nd call
Guntakal Division- Electrical arrangements- Marichetal- Raising of Platforms to High level and Provision of New 3M FOB at Marichetal station.
Guntakal Division: Repairs and Painting Works of Foot Over Bridges in Sr.DEN/South/GTL jurisdiction.
Package No 29 /APRRSP/Bridges /2026-27 Consists of 02 Bridge works in Kakinada district. Est Cost Rs. 21.00 Crs
Closure of LC No.59 at km 66/21-22 duly diverting traffic to RUB No 58B (LC No 58) between BMKD -PGRL stations
Construction of ROB at Alluru Road at Km 1341.950 (RHS) on Chilakaluripet-Nellore section of NH-16 (Km 1182.802 to Km 1366.547) in the State of Andhra Pradesh.
Formation of approaches and balance bridge work to the HLB across Sarada river at Km 0/10 near Kaligotla village of Vechalam - Khandivaram road in Visakhapatnam District
GTL Div: Electrical Arrangements- 1.Raising of Platforms to High Level and Provision of New 3m FOB at LMD,TGL and JKO stations.2. Raising of Platforms to High Level at PDL, JUR and RLO Stations.
GTL Div: Electrical Arrangements- 1. Raising of Platforms to High Level and Provision of New 3m FOB at CCI,TKU,TAT,DCU and KBA stations.2.Raising of Platforms to High Level at MPT,NCE East and PCL stations.
Package No.AP02PIVLSB10 L022-Rayadurg road to MM Halli Construction of Bridge on pulavanka in road from Rayadurg to MM Halli of Kudair Mandal Est. cost Rs.660 Lakhs
Package No.AP02PIVLSB10 L021-Anantapur Bellary road to Ramachandra puram Construction of bridge across maruva vanka in Anantapur - Bellary road to Ramachandrapuram of Kudair Mandal Est. cost Rs.321.5 Lakhs
S&T portion of work in connection with proposed ROB/LHS at various LC Gates ML- 341, ML-343, ML-345, ML-349, ML-357, ML-360, ML-362, ML-365, ML-390 & ML-440 under ASTE/PSA.
Site Investigation, Soil Investigation, Finalization of Designs and Drawings, Proof Checking, preparation of DPR and consulting services. Est. Rs.15.00 lakhs in 1st call for the work Construction of Bridge across Atreyapaya in Korangi Village of Tallarevu Mandal. Est.Rs.1300.00 lakhs.
Site Investigation, Soil Investigation, Finalization of Designs and Drawings, Proof Checking, preparation of DPR and consulting services. Est. Rs.12.00 lakhs in 1st call for the work Construction of Bridge across Gollaprolu to Tatiparthi Puntha Road in Gollaprolu Mandal. Est.Rs.800.00 lakhs.