Loading…
Loading…
10,105 results • Best match
Renovation of Shri Vindyasini Lift Irrigation Scheme, Dhamane Tal.Shindkheda Dist. Dhule
Proposed Audumbareshwar Lift Irrigation Scheme At Umbervihire (Keli Kotul). Tal. Akole.
Preparation of Forest Proposal under Dhapewada lift Irrigation Scheme Stage II
Krishna Koyna Lift Irrigation Scheme - Removing leakages on Bhose Gravity Main
Repair Work Of Electrical Components At Sina Madha Lift Irrigation Scheme
Construction of Pipe Distribution Network along with CADWM work of Distributory, Minors and Subminors on Main Canal Between RD 16 to 43 km under Nerla Lift Irrigation Scheme.
Providing manpower for operation and maintenance of Switchyard area and transmission line of Wangana Lift Irrigation Scheme stage 1 2 and 3 for one year
Supply of Simens make 220 KV Differential Protection Relay for Control panel of MKVDC portion of Tembhu Lift Irrigation Scheme stage 1A ,1B and 3
Replacement of 33 Kv SF6 circuit breaker with VCB of first bay and allied work at Mhaisal Lift Irrigation Scheme Stage 3 and 4 switchyard
Providing staff for operation maintenance of 33 KV switchyard equipments and transmission lines of Punadi Lift Irrigation Scheme Stage I II III for one year
Providing manpower for operation and maintenance of switchyard area and transmission line of Wangana Lift Irrigation Scheme Stage 1 2 and 3 for one year
Dendonwadi Minor Irrigation Project, Tal. Kankavli, Dist. Sindhudurg. Construction of Dam Approch Road
Providing skilled man power services for operation and routine maintenance of 33KV 6.6 KV 2 x 4 MVA Transformer and Switchyard Equipments for Gurukunj Lift Irrigation Scheme Talegaon Thakur Tal Tiwasa Dist Amravati for the year 2024 2026.
Tembhu Lift Irrigation project providing services for irrigation management of irrigation for crop area measurement, water rotation and water bill recovery under Arphal main canal, Palus branch canal.For Year 2024-25
Carrying out building repairs and construction of a protective wall for the Minor Irrigation Subdivision, Atpadi under the Minor Irrigation Division Sangli Taluka Atpadi District Sangli
Krishna Koyna Lift Irrigation Scheme Construction Of Head Regulator of Lingnoor Branch Canal and Construction of Valve Cabin at Minor Nos 1 1A 2 3 4 5 and 6 of Lingnoor Branch Canal Tal Miraj Dist Sangli
Krishna Koyna Lift Irrigation Scheme- Construction of Canal HPC at 3/300 m of Chinchani Feeder Canal and Lining Work at Ch. 3/200 to 3/300
Renovation of control and relay panel for Mhaisal Lift Irrigation Scheme Stage 3 and 5 and laying of rubber matting around the control and proction panel.
Providing Emergency Repair and Maintenance work at switchyard and related transmission line for Pundi Lift Irrigation Scheme Stage 1 to 3 upto commissioning of complete work
Emergency repair maintenance work consumable material and allied works for Mhaisal Stage 5 6A 6B Agalgaon Jakhapur Dongarwadi Banewadi Gavhan Nagewadi and Vajrachaunde Lift Irrigation Scheme
Providing Emergency Repair and Maintenance work at switchyard and related transmission line for Visapur Lift Irrigation Scheme Stage 1 and 2 upto commissioning of complete work
Supplying of filtered transformer oil for Power transformers installed at 220/33 KV Switchyards at various stages (St I to V) of Tembhu Lift Irrigation scheme
Providing manpower services for operation and maintenance of 33 KV switchyard and 11 KV transmission line at Dutalwadi under Tarali Lift Irrigation Scheme for one year
Providing manpower services for operation and maintenance of switchyard and 33 KV transmission line at Visapur Lift Irrigation Scheme Stage 1 and 2 for one year
Providing manpower for operation and maintenance of switchyard and transmission line at Urmodi Lift Irrigation Scheme Stage 1 and 2 for the period of one year
Design manufacture supply erection testing and commissioning of 220_33KV 100 MVA Power Transformer of Narwad Sub Station of Mhaisal Lift Irrigation Scheme on buy back basis
Tembhu Lift Irrigation Project Tal Karad Dist Satara Construction of SWF at Ch. 0850 m on Sangola Canal Tal Sangola Dist Solapur
Construction of Direct outlet on Part-II, Canal No.1, 11 to 37 km Bramhagavhan Lift Irrigation Scheme, Tq. Paithan, Dist.Chhatrapti Sambhajinagar.
Krishna Koyna Lift Irrigation Project Mhaisal LIS (Jath Part)- Construction of Balance work between Km 1 to 20 of Jath Main Canal
Krishna Koyna Lift Irrigation Scheme Jath Part Construction of Valve type chamber for outlets 24 Nos on Billur Canal II Tal.Jath Dist.Sangli
KRISHNA KOYNA LIFT IRRIGATION SCHEME -CONSTRUCTION OF DIRECT OUTLET AT CH.17010 M (16660 M) I.P. SIDE OF SONSAL LEFT BANK CANAL
Construction of Balance Work and tailing work of R-4 and R-5 on Nakshi Branch Canal of Mokhabardi Lift Irrigation Scheme.
Construction of Pipe line Distribution Network and Intake Chamber for left Bank Canal KM 7 Under Shirapur Lift Irrigation Scheme Dist Solapur
Maintenance of Mhaisal Lift Irrigation Project Jat Main Canal Km.1 to 52 and AgalgoanJakhapur LIS Rotation period for Year 2020-21
Construction of Structures On Main Canal No. 2 of Bramhagavan Lift Irrigation Scheme Part-2 Tq. Paithan Dist. Chhatrapati Sambhajinagar (Second Call)
Modernization of Kodelohara Distributory on Left Bank Canal of Chorkhamara Tank under Dhapewada Lift Irrigation Scheme Stage II Tah Tirora Dist Gondia
Krishna Koyna Lift Irrigation Project--Mhaisal Part- Repair work of S W F structure for Salgare Main Canal, Tal. Miraj, Dist. Sangli
Krishna Koyna Lift Irrigation Project Mhaisal LIS(Jath Part) Construction Balance Earthwork AND iningbetween Km 20 to 52 of Jath Main Canal
Tembhu Lift Irrigation Project Tal Karad Dist Satara Construction of SWF at Ch 18500 m on Sangola Canal Tal Sangola Dist Solapur
Krishna Koyna Lift Irrigation Scheme - (Takari Part) - Construction of balance Earthwork and lining of km 101 to 144 of Takari main canal
Construction of various DHPCs and drain crossings on Kinhala Distributory offtaking at R.D. 7260m on main canal of Mokhabardi Lift Irrigation Scheme
Krishna Koyana Lift Irrigation Project Providing Services for Irrigation Managment under Bhose Gravity Main Km. 11 to 20 for the year 2020-21 Taluka- Miraj, Dist Sangli
Construction of Approach Road to Pump House 1 under Guruvarya Late Laxmanraoji Inamdar Lift Irrigation Scheme (Jihe Kathapur Lift Irrigation Scheme) at Village Kathapur, Tal - Koregaon, Dist- Satara.
Carrying out geological Investigation by Trial Bore for proposed Western Man Lift Irrigation Scheme, Tal-Man under Guruvarya late Laxmanraoji Inamdar Lift Irrigation Scheme (Jihe Kathapur), Dist-Satara
Carrying out geological Investigation by Trial Bore for proposed Northern Man Lift Irrigation Scheme, Tal-Man under Guruvarya late Laxmanraoji Inamdar Lift Irrigation Scheme (Jihe Kathapur), Dist-Satara
Carrying out Geological Investigation by trial bore for proposed Bhadale Lift Irrigation Scheme, Tal.Koregaon, Dist Satara under Guruvarya Late Laxmanraoji Inamdar Lift Irrigation Scheme (Jihe Kathapur) Dist. Satara.
Installation of CCTV and other ancillary systems at Pump House No 1 to 3 of Janai lift irrigation scheme Pump House No 1 of Shirsai lift irrigation scheme.
Development Drip Irrigation System For 16 Open Spaces in P.No.1,2,4,5,6,7,8 at Washim. (Under 14th Finance Commision)
Providing manpower for Operation and Maintenance of 33/ 6.6 Kv switch yard Equipments at Ambhora Lift Irrigation Scheme Stage 1 and Stage 2 Tal Kuhi Dist Nagpur for two years
Providing staff for operation maintenance of switchyard including power transformer and transmission lines of Takari Lift Irrigation Scheme Stage I II III and IV for one year