Loading…
Loading…
10,118 results • Best match
Providing and Fixing of gauge plate at Tillari saddle dam, Tillari main dam and Information board at government land for Tillari Interstate Irrigation Project, Tal Dodamarg, Dist Sindhudurg.
Operation and Maintenance of plantation work for three years (Trees, Shrubs, Lawn and Irrigation) in the premises of Shree Mahalaxmi Jagdamba Sansthan at Koradi, Taluka Kamptee, District Nagpur.
Construction Of RCC Trough Between Ch. 0/115 M To Ch. 0/400 M of Nira-Bhima Link Tunnel, Taluka - Indapur, District -Pune, Under Krishna Marathwada Irrigation Project.
Repairs to Water Lubrication System and Manufacturing and Errection of End Drive Canopy, Extension Platform, Entry gate, Ladder at Adan project Under Executive Engineer, Arunavati Irrigation Division, Digras.
Roofing sheets and other repairs of accommodation no. II/17, II/18, II/15, III/7, III/8, III/10, III/11 at Irrigation Government Colony Kalwa Thane.
Providing and Laying of 110 mm HDPE pipeline for irrigation to farmers of village Borgaon through discharge water of Mine no. 1 under Saoner Sub Area. (2nd Call)
Metalling and S.T.B.T. at Rehabilitated Villages Khedle Kajali to MDR-78 Road And Usthal Dumala to Handi Nimgaon Road, Tal - Newasa, Dist-Ahmednagar for Jayakwadi Major Irrigation Project.
TH/MES/DVN/21/D6-27-4071-381 LINING UP THE CONTRACT FOR SLUDGE REMOVAL FROM IRRIGATION POND AND PH ADJUSTMENT TANK IN ETP AT RCF THAL UNIT
Providing and fixing welded wire mesh for over flow section Non over flow section LHS and RHS Irrigation outlets for Shortcrete of Wadiwale Dam for the Year 20202021
PROVIDING MAN POWER RESOURSES FOR EXCAVATED STACK MATERIALS SECURITY AND RECORD KEEPING FOR NIRA-BHIMA LINK TUNNEL WORK UNDER KRISHNA MARATHWADA IRRIGATION PROJECT (LINK-5) TQ. INDAPUR DIST.PUNE
Fabrication of Ladder Extention Platform to VL Gate 15 X 12 m 8 Nos and 15X 5 m Nos at Kaotha project Under Engineer Akola irrigation Division Akola
Mapping of dams, colonies, constructions and all other immovable assets, digitization, collection of information and documents and making asset wise files under the Satara Irrigation Project circle, Satara
Labour for patrolling during Hot weather Irrigation for year 2020 21 of Umarzari M I Tank and Kalimati Sonegaon M I Tank and Chirchadbandh Tedha Ex Mal Tank
Supplying Steel Needles for K.T.weir at Mangale Savarde, Shigaon,Kadavi, Panore, Beed, Dattwad and FRP Needle at kode under Kolhapur Irrigation Division North Kolhapur for year 21-22
Supply of Manpower for Irrigation Management of Kharif Season in area of Rd 6920 to 26500 m Under Asolamendha Project Renovation Subdivision no. 8 for Year 2026-27
Repairs to CC lining in Km 107,117 of IRBC including Carrying out irrigation management work in Rabbi and Hot weather season 2025-26 under U.P.I.Section No.24, Umari
23 G COMBINED PACK WITH AFI. CONSISTS OF CASSETTE, IRRIGATION AND ASPIRATION TUBINGS, LIGHT GUIDE PIPE, POSTERIOR VITRECTOMY CUTTER AND 1 SET TROCAR CANNULA - BI5523. MAKE : Baush+ Lomb
Construction of internal Roads and Buildings Metalling, Bituminious, Grampanchayat Office and Smashanbhumi) at 7 Number of Rehabilitated Villages under Jayakwadi Major Irrigation Project in Newasa Taluka, Dist. Ahilyanagar.
Construction of H.R. at RD -119 to -49 m and Aqueduct RD -49 To 780 m, on Khindsi Feeder Canal. Tal. Ramtek, Dist. Nagpur.
Construction of Cart Track Road Bridge and approach road on Escape Nalla At. Ch.19-742 of Ujani Left Bank Canal near Shevare-Malegaon road Tal. Madha-22
Dummy load for Sonar Beacon Specification: - Dummy Load (for SBE1 P54(2 canal) 9kHz/37.5 kHz) P/N:, Complete Equipment - Portable UWT consisting of: a) Transmit- Receiver unit SEE 31-13, Part No. - 56 5
Construction of C.C. lining at RD 7800 to 8000m on main canal and construction of head regulator of minors of Chargaon medium project Dist. Chandrapur
Repairs to Syphone at RD 4300 m on RBC and Repairs to HPDC at RD 400m 700m on Left bank canal of Khurshipar M.I Tank
STRUCTURE REPAIRS AND WIDENING OF MINOR BRIDGE (CANAL CROSSING STRUCTURE) AT KM 1/600 ON KANHAN GAHUHIWARA CHACHER ROAD TAHSIL PARSEONI DISTRICT NAGPUR (THIRD CALL)
Providing Choukidar for Government Machinery working under Deputy Engineer Mechanical Subdivision No.4 Amravati working at various Canal Cleaning site as per Movement of Machinery
Repairs to fall and structures and HR and repairs to Aqueduct at RD 310m, 660m and 992m on canal of Antargaon M.I. tank, Tah. Saoli
Carrying survey and ascertaining the quantities of earthwork, lining and allied items of Right Bank Main Canal and Its Distribution System of Arunavati River Project
Repairs Structures ( Syphon , HPD and Aquduct) and Lining at Embankment Portion of Dy 3, 3A and 6 on Panjhan Left Bank Canal at Kalwadi Section
Construction of Mechanised C.C. Lining for Km. No. 1 and Km 5 to 10 of Urmodi Right Bank Canal (Flow) of Urmodi Project Tal.Dist satara
Construction of kadva Mhalungi pade to Canal Waghad to valkhed pada shiv road km 0/00 to 3/00 (VR-68) Tal Dindori dist Nashik
Punad Project Tal. kalwan Dist Nashik Constructing Inlets at Ch 4590m Ch 6260m Ch7520m Ch11450m Ch.23750m and Ch 32850m of Sule Left Bank Canal
Construction of Approach Road from Gundegaon HR to Kivla Storage Tank Nalla Resectioning from SCVP right bank canal Escape to submergence of kivala Storage Tank
Repairs, Manufacturing, Fabrication, Erection, Testing, Commissioning and Painting of Sliding Type canal outlet Gates Embedment, Gate Leaf at Dudhganga Bidri Branch Km 1 to 44
Construction of cement concrete road at Nandanvan colony from Hasanbag main road to canal road at Laxmi Narayan Mandir in p. no. 27 IInd Call
2801 Power 01 Hydel Generation 9th T H E P P-maintenance M and R of service road of Tillari Power canal in KM 6.
Construction of W B M Road at Mhaswad road Dattu Fitter Home to yeliv maynar canal to mahadeo adat home in Prabhag No 14 Malshiras
Reconstruction of frop box culvert at RD 2260m and repairing of VRB at RD 2280m on main canal of Shegaon bk. M.I. tank, Tah. Warora
Construction of fall at RD 3760m VRB at 3930m and cross regulator cum escape on Subbai, Chincholi branch canal of Dongargaon medium project, Dist. Chandrapur
Const. of Part I and III LD Works in Chak OR-1 OL-1 R-Tail and L Tail RM-1 Dharmabad Branch Canal IRBC
Estimate For repair works of canal system for handing over area of Sainath WUA, Inzala (480Ha), Gangajal WUA, Vijaygopal (403.71Ha) and wamiswarupanand WUA, Inzala (481.33Ha)
Construction of WBM Road CH 220 to 1560 m on Service Road Of Right Bank Canal of Pimpalwadi M. I. Project Tal Khed Dist Ratnagiri
ESTIMATE FOR CONSTRUCTION R.C.C DRAIN FROM H/O CANAL (NAHAR) TO KHAREDI VIKRI IN PRABHAG NO. 5 AND 7 AT AT N.P ARJUNI DISTT. GONDIA
Repairing Of Damaged HPD and Constructing 80 m RCC Lining at damaged portion of HPD at ch 7.140 of km 8 Tilari Left Bank Canal.
Carrying out Periodical Observations in the Command area of Jaikwadi Project Paithan Left Bank Canal Dy. No. 47 to 70 for the Year 2021-22
CONSTRUCTION OF UNDREGROUND RCC NP3 PIPE SYSTEM IN KM NO1 TO 6 OF RAHUD RIGHT BANK CANALAND FEEDER CANAL FROMUSWAD PTTO KOKANKHEDE UKHALBHAVANI TALCHANDWAD DISTNASHIK
Construction of CC trough and section repair of main canal RD 300 m to 1200 m ,Guide wall and Waste Weir of Bobdo M.I tank
Carrying survey and ascertaining the quantities of earthwork, lining and allied items of Left Bank Main Canal and Its Distribution System of Arunavati River Project
Clearing of area surrounding pump house Removing tree and Grass also removing of silt from approach channel and canal repairs work of Rajegaon Kati LIS
Filing and dry rubble stone pitching for Mahisdara river (Kundalika Right Bank Canal) at Ch.0/650 to 0/750 near village Gove, Tal.Roha, Dist.Raigad.
Estimate for Jacketing to Protection Wall (Ch.680-1084) And Bed Lining CH (573-1175) of Arsoli M.I. of Right Bank Canal Tq.Bhoom Dist-Dharashiv.