Loading…
Loading…
10,120 results • Best match
Construction of Crossregulator at CH 19160m Escape at CH 19145m SWF at CH 18560m Balance lining and 5 Inlets on Ghanand Hivtad Canal Km 1 to 32 Taluka Atpadi District Sangli
Repairing of Main Canal Head Regulators Cross Regulators Escape Gate Minor Sub Minor Gate of Nimn Wardha Project RD 0 to 24 km under Executive Engineer Nimn Wardha Project Division Wardha
Repair of DO at RD 860 m and 2350 m and lining from RD 0 m to 260 m at main canal of Wena Medium Project Taluka Nagpur Gramin District Nagpur
Carrying out Survey, Preparation of detailed drawings, Estimates for the balance earthwork, lining and Renovation of existing structures of Dhom Right Bank Canal Km. 0 to 18 and 48 to 66
Conducting crop pattern and demonstration, training, field visit, adaptive trials,water management, handling over, strengthening and empowerment of WUA under N.M.I. section 5,6,and 7. of N.M branch canal (9184.3745 Ha.)
JOBWORK MANUFACTURING TRANSPORTATION AND ERECTION OF 20M LONG FOOT BRIDGE ON NEERA DEODHER RIGHT BANK CANAL CH NO 42/050 IT INCLUDES ALL MATERIAL LABOUR TRANSPORTION LOADING AND UNLODING CHARGES ETC
Jobwork of Manufacturing Erection of Intake Gate 1.2 x1.2 mtr - 2 nos and Trash Rack with embedment leaf and stem hoist etc for Hanbarwadi LIS Ch 72/500 of Arphal Canal
Manufacturing, transportation and Erection of 18m long over bridge for aquaduct at Ch 1880 to 2400 on Giravi Dy no. 1 of Dhom Right bank canal of Ch. No. 113/470
Laying of 1000 mm Dia PCCP Pipes from RD 6620 m to 8240 m and Construction of Remaining structures on Right Bank Canal of Tedhwa Shivni LIS. Ta. Gondia Dist. Gondia.
Laying of 1200 mm Dia PCCP Pipes from RD 590 m to 1450 m and Construction of Remaining structures on Right Bank Canal of Tedhwa Shivni LIS. Ta. Gondia Dist. Gondia.
Proposed Work of WBM and B.T.Road at Patil Wasti Canal From Balu Ghongade House to North Side Tanaji Kaka Patil to Shankar Phule to Arun Patil House For sangola municipal council.
Cleaning of the soil dam of the Takli Borkhedi Project as well as 100 m lining and other works from chain number 3210 m to 3310m on the Borkhedi main canal
Construction of Bridge with Approaches on Takli Shirajgaon Malshevage Rohini Pimpalgaon Odhare Patane Lonje Hatle Road, SH-383 Km.4/800 ( sectionPimpri chaufuli To Mhalshevage on canal) Tal. Chalisgaon, Dist. Jalgaon.
Repairing of Bank Work and Construction of Stone Pitching For Aqueduct In Km No.109 to 144 and Installation of Gauge Strip In Km 109 to 144 of TakarI Main Canal
To carry out Job work of Transporting New Needle Gate of Size 2.15 x 0.5 MTR. From Dapodi, Pune to various K.T. weir sites of Nira Left Bank Canal Irrigation Sub-Division, Nimgaon, Tal. Indapur. Dist. Pune.
Repairs of Left Bank Canal and Right Bank Canal Cross Regulator Structure and Construction of Protection Wall in Selected Portion on Left Bank Canal and Right Bank Canal at M.I.Tank Harangaon Tal-Peth Dist- Nashik.
Providing Paver Block Flooring to Sub Division Office at Tillari Irrigation Colony charathe Sawantwadi of Tilari Interstate Irrigation Project.
PROVIDING LABOUR FOR PATROLLING DURING RABI HOT WEATHER IRRIGATION YEAR 2021 22 FOR PROJECTS UNDER IRRIGATION SUB DIVISION TUMSAR
Repairs to the Natuwadi Right Canal km at Ch 14 750 Repairs to Left bank canal canal service road at km 9 800 and construction of a protection wall Repairing the damaged parts of Natuwadi Left Canal and Right Canal occured due to heavy rains Taking m
Construction of Command Area Development works in PDN on the distribution system of Dhalgaon DY Pachegaon Minor No.1 and 4 Kidbisari Minor No of Kavathemahankal Canal Km.1 to 19
Proposed Work for survey and preparation of Detailed Project Report DPR for restoration work of canal of Uma Medium Project and Pimpalgaon Chambhare M.I.Project under MIIP Scheme
Maintenance and Repair of three CR cum Escape structures located at chainage No. 3-430 chainage No. 8-100 and chainage No. 13-300 on the Arjuna Left Canal under Arjuna Medium Irrigation Project. Tal. Rajapur, Dist. Ratnagiri.
Tilari Left Canal Km. 11, km. 18th and right canal km. 26. Construction of accident protective wall and related works at the site of canal excavation
Design, manufacturing, supply, transportation, erection and commissioning of Hydraulic hoisting arrangement for Downstream normal closing Service Gate of size 2.15 x 2.25 meter Sill RL 585.98 at RL 590.439 with test an trial of Dhamni Irrigation Proj
Repairs and Renovation of 1 Executive Engineer Cabin 2 Deputy Engineer Cabin 3 Correspondence and Project Branch of Accelerated Irrigation Benefit Programe Cell AIBP Cell Office at 3rd floor of Sinchan Bhavan Pune PartI Civil Portation
Repairs and Reconditioning and Maintenance to sliding type outlet Service gate of Size 0.9 x 0.9 1 No. at Bijgaon MI Tank Tal. Navapur Dist. Nandurbar under Ex. Enginner Small Scale Irrigation Water Conservation Division Dhule
Mfg. and Providing and Supply of Straight Type Needle Gate of size 2.15 x 0.5 MTR. 74 Nos and Fitting of 286 Needle Gates to various Sites under executive Engineer, Monor Irrigation water Conservation Division Ahmednagar
Supply of labours for Inspection and Taking Levels, keeping watch, etc. during monsoon/ annualy for 19 NOS of projects under Irrigation Sub-Division, Arvi.Supply of labours for Inspection andTaking Levels, keeping watch, etc. during monsoon/ an
Under Irrigation Sub-Division Kankavli, shirgaon, Ozram, Dabhachiwadi, Oros, Chorgewadi, Hatteri and Poip L.P. scheme, the broken stone discharge well of the dam will be strengthened from inside and outside by jacking it into the conduct
Fabrication and fitting of sheet metal cabin for Irrigation Outlet gates 3.9 x 2.40 mtr. - Gate No. 1 to 3 - 3 nos. with extended platform to hoist bridge each end drive at Majalgaon Project, Dist. Beed
A) CONSTRUCTION OF CC ROAD TOWARDS SMASHANBHUMI AT WARD NO.1 IRRIGATION COLONY GOKUNDA TQ. KINWAT, DIST. NANDED B) CONSTRUCTION OF C.C. ROAD IN VIJAY PATIL NAGAR AT WARD NO. 4 GOKUNDA TQ. KINWAT, DIST. NANDED
Supplying Man-Power for operation of Vertical Lift Gates of size 15m x 9 m.-27 Nos. during monsoon period (120 days) Prakasha Barrage under Executive Engineer,Dhule Irrigation Division Dhule For the year 2019/20
CONSTRUCTION OF PIPE LINE DISTRIBUTION NETWORK ALONG WITH FORMATION OF WUA, HANDING OVER THE COMMAND TO WUA AND MAINTAINANCE FOR 60 MONTH FOR IRRIGATION PURPOSE IN COMMAND AREA OF LINGA M.I. TANK TQ. WARUD DIST. AMRAVATI
Providing labour and diamond drilling material for 6 diamond core drilling work at Bhandardara, Ahmednagar under executive engineer, Ahmednagar Irrigation Division,Ahmednagar by the office of Deputy Engr, boring and transport sub div, dapodi,Pune-12
Repairing And providing furniture to Office of the Sub Division- Talamba Major Irrigation Project Sub Division No.3, Ambadpal, Nardave Project Sub Division, Ambadpal and Water Resource Survey and Investigation Sub Division, Aambadpal, under Minor Irr
Fabrication and Erection work of platforms inside EDU Cabine, Irrigation Outlet gate cabin, River Sluice gate Cabin and Chain-link fencing on downstream side of Hoist Bridge and allied work at Varkhede Londhe Project Tal.Chalisgaon Dist.Jalgaon.
Construction Of balance Work of Minor 75 at Ch 186 obliq 170 of KLBC and Construction of Drainage work for protection to farmers land in Km 188 of Kukadi Left Bank Canal
(A) Construction of Sakav on Old Canal at Fursungi, Tal-Haveli,(B) Construction of Sakav on Kalubai Odha, Tal-Haveli, (C) Construction of Sakav on Undri Pisoli Road, Tal-Haveli, Dist-Pune.
Shifting and Height raising of 33 KV, 11 KV, LT Line and DTC crossing over branch canal no.2 under Gosikhurd LBC near village Khairi-Diwan and Bhendala,Th. Pavni, Dist. Bhandara.
Construction of Canal Crossing structure on Nagpur Umred Bhiwapur Nagbhid Bramhapuri Armori Road NH 353D in Km 64.200 Jawarabodi Minor R1 offtake at RD910M of Jawarabodi distributory in the state of Maharashtra.
Construction of Surface Drainage work at Pump House No 2 Plantation Pump House No 1 and 2 Construction Pitching to Escape Tail Channel of Express Canal at ch 8820 of Ekrukh LIS
Repairs and maintence to C.R Gate of size , 2800x3500 mm -03 nos at Of Purna Main Canal Dist Hingoli . Complete job including cost of material, labour, sundry and labour welfare cess etc.
Repairs to 0.3m x 0.3m 0.6 x 0.6m 1.0 x 1.2 m and 2.0 x 2.0 m canal gates at various RDs and 1.2 x 1.2m HR 2 Nos of Kalpathri Project
2702 M and R to Khokasa, Nawali, Khadaki, Haldani, Sonkhadaki, Rayangan Minor Project Tal Navapur Dist Nandurbar Repairs to pitching at dam, cutting down trees and wet silt from canal of MI
Construction of Earthwork and C. C. Lining of Minor No.39, 40, 41, 42, 43, 44, 45 at RD 30725, 31345, 31950, 32515, 33150, 34140, 36425 M respectively on Kayadhu Branch Canal
Construction of Box cell on R-1 Minor of Mandhal Distributory on Opara Mandhal Road MDR-42 (at Ch. 2/900) in Taluka Lakhandur, District Bhandara (Km of Canal R.D. 1660 M)
2701 M and R to Repairs structures on Panzara Extension Canal at H.P.D. at Ch 24855, VRB at Ch 27055, Syphon at Ch 27670 of Panzara Medium Project Tal Sakri Dist Dhule
Maintenance and Repairs to Phaltan Culvert No 21 Aquaduct 8 and Kambleshwar Drainage Scheme in the command area of Nira Right Bank Canal Tal Phaltan Dist Satara for the year 2024-25
Repairs to Lining and H.R.Gate at Ch.0/000 to 0/100, 1/200 to 1/500 , H.R.Gate 54/455 and Ch.65/000 to 65/100 of Dimbhe Right Bank Canal.
RECONSTRUCTION OF VRB ON KALAMANA MR RD 1850 M, REPAIRING OF VRB ON FEEDER CANAL RD 950 M, REPAIRING OF VRB ON SINGORI MR 1 RD 100 M OF LOWER WUNNA PROJECT