Loading…
Loading…
10,120 results • Best match
Repairs To Escape Gate of various sizes
Construction of Earthwork and Lining of RM-6,RM-10,RM-12, RSM-1 of RM- 12, RSM-2 of RM-12, LM-12, LM-13, LM-15, LSM-1 of LM-15, RM-16, RM- 17, LM-18, RSM-1 of LM-18, LSM of RSM of LM-18, RM-19, RM-20,RM-22, RM-2, RM-24 and Tail Minor on Nimgaon Br
Construction of Escape, Escape Channel, DHPC at RD 1100 on KM 7 OF Karkheli Branch Cancal.
Repair To Escape Sliding Type Gate 1 25 1 25 Mtr 6 Nos Its 8T Screw Stem Hoist Its Alignments At Kundlika Left Canal Ch No 0 089 And Extended Platform And Side Railing For Escape Sliding Gate One Complete Job
Carrying out Irrigation Management work including, measurement of area Preparing Akarnitakte, khatawni register, maintaining field book/gauge register records in Rabbi and Hot weather season for N.M.I.Section 1 to 4, sub div no. 1 Gangapur (2024-25)
Carrying out Irrigation Management work including, measurement of area Preparing Akarni takte, khatawni register, maintaining field book/gauge register records in Rabbi and Hot weather season for N.M.I.Section 5,6 and7 sub div no. 2 Vaijapur (2024-25
Design of Ashti LIS-III (Stage 3-A, Stage 3-B and Stage 4) under Krushana Marathwada Irrigation Project, including investigation, Design, Vetting, Estimates, DTP and taking all necessary approvals from concern authorities, Taluka Ashti Dist Beed
Carrying out Irrigation Management work including, measurement of area Preparing Akarnitakte, khatawni register, maintaining field book/gauge register records in Rabbi and Hot weather season for N.M.I.Section 10 to 13,sub div no. 3 Gangapur (2024-25)
Fabrication and Erection of service gate of size 1.2 x 1.8 -1 no. Hoist assembly and fixed type HOT and repairs to Emergency gate of size 1.2 x 1.8 -1 no. at Chulband Medium Irrigation project Dist.Gondia
KORLE SATANDI MEDIUM IRRIGATION PROJECT TAL DEVGAD DIST SINDHUDURG Construction Of Left and Right Side Protection wall and Plugging wall near Waste Weir, Construction Of Remaining Work of Tail Channel Construction of Road from Tail Channel Bridge
Repairs to 450 x 450 mm Sliding Type Gates Qty-21 Nos, 0.6 x 0.6 MTR. Sliding Type Gates Qty-13 Nos., 1.2x1.2 MTR. Sliding Type Escape Gates Qty-04 Nos. and 2.5x2.5MTR. Sliding Type Escape Gates Qty-04 Nos. on Ujjani Right Bank Canal under Pandharpur
CONSTRUCTION OF BALANCE EARTHWORK AND STRUCTURE FROM R.D.7070M TO 8866M and CONSTRUCTION OF DHPC AT R.D. 810 M and 6010 M ON BHIWAPUR DISTRIBUTORY OFFTAKING FORM R.D. 1500M ON DEOLI BRANCH CANAL.
PROVIDING AND ERECTION OF ENERGY EFFICIENT LED STREET LIGHT FROM 1) WADSA T-POINT TO SHRI SAI SCHOOL TO NURSING TO ARSODA 2) NAGAR PARISHAD OFFICE TO CANAL, AT N.P. ARMORI DISTT. GADCHIROLI
Providing Comprehensive Consultancy Services Including Design and Project Management for Widening and Construction of Asphalt Road from Ahilyanagar - Manmad Highway (NH-160) to GRB Canal at Nimgaon Korhale, Shirdi, Tal. Rahata, Dist. Ahilyanagar.
Proposed Gosikhurd Project Right Bank Canal Crossing 1x8.1M X 4.45 M R.C.C Box at Rly Km 1126 9 10 between Bramhapuri Nagbhir station on Gondia Chanda Fort section (B.G.) by box pushing method.
Providing Material For Mettaling and Bitumineous Road - Bhutashte To S.H.211 (Sina-Madha Canal To Bhutashte Padsali Baundry on Padsali Road) VR. - 18 Ch.No 0/00 to 3/000 Tal - Madha, Dist - Solapur
Construction of minor bridges on Malashi to SH-121 road VR-163 at KM 3/0, nearMalashi and SH-121 to Shendekarwadi road, VR-355 near Shendekarwadi on canal,Tal. Baramati,Dist. Pune
Conducting crop pattern and demonstration, training, field visit, adaptive trials,water management,handling over, strengthening and empowerment of WUA under N.M.I. section 9,10 of N.M branch canal No 1 and 2 (7566.8639 Ha.)
CONSTRUCTION OF FALL CUM VRB AT RD 1740 M, VRB At RD 2400 M.AND RD 1390 M. FALL OF BHENDALA MINOR OFFTAKING At 13130 M. SAONER CANAL OF KOLAR MEDIUM PROJECT. (Second Call)
Providing services of private Operators at Drivers for Operations of machineries, vehicles and providing services of Helpers, watchmen at various canal and project sites of Workshop Sub Division Ch. Sambhajinagar under this Division
Conducting crop pattern and demonstration, training, field visit, adaptive trials,water management,handling over, strengthening and empowerment of WUA under N.M.I. section 11,12 and 13 of N.M branch canal No 1 (7042.5591 Ha.)
Repairs works of canal system for handling over Pirbaba W.U.A Jamni, Jai Hanuman W.U.A Chikani, Dattmandir W.U.A Deoli, Sadhumanohar W.U.A Yangaddeo, Savitribai W.U.A Afjalpur, Rastrasant Tukodaji Maharaj Sirasgaon, Savitribai Phule W.U.A Padegaon un
Providing services of private Heavy Earth Moving Machinery operatorsfor 12 Months from date of work order as per requirement on various canal and project sites of Mechanical Sub Division Jalna under this Division.
Providing services of private Heavy Earth Moving Machinery operatorsfor 12 Months from date of work order as per requirement on various canal and project sites of Mechanical Sub Division Aurangabad under this Division.
Repair work of C.C. Lining at Ch. 2/990 to 3/023 (Km. 3) and Ch. 10/870 to 10/910 (Km. 11) of Mohol Karamba Branch canal for the year 2025-26.
Reconstruction of Tank on D/s side of Head Regulator and High Level Minor and Strengthening to Main canal from RD 2500 m to 4000m of Karoli M.I. Tank, Tah. Sindewahi Dt. Chandrapur
Repairs to existing gate frame with embedment parts works and other allied mechanical work at Cholmukh Main Canal Distributory Gate and River Escape and River Sliding Type Gate at Tal. Peth Dist. Nashik
2701 M and R to Kanoli Medium Project Tal Dist Dhule Excavation in hard rock from main canal at ch ch 0 to 600 m and filling raincuts and rearranging pitching of dam
Repairs and maintenance of C.R. and Escape Gate of Various sizes with allied Hoist Mechanism Total 30 Nos on Isapur Left Bank Main Canal (0 to70 KM) of Upper painganga project Dist. Yavatmal
M and R to Manyad Dam Cleaning of Dam Toe Drain Surface Drain Providing Display Board M. S. Pipe Railling Making approch road and Jeepable road with canal winding at D.S. of Dam
Work of Repairs for Residential Quarters(Type-I), Including Painting, Roof Repairs, Door and Window Repairs, Flooring and Other Minor Works at Khed colony under Gosikhurd Right Bank Canal Ta. Bramhapuri, Dist. Chandrapur.
Construction of Box Cell Bridge on Ghodazari Sub Branch-1Takes off from RD 25/900 on Ghodazari Branch Canal Across SH-322 Nawargaon Chimur Road at RD21/850 in Sindewahi Taluka Dist. Chandrapur
Providing services of private Operators and Drivers for Operations of machineries, vehicles and providing services of Helpers, watchmen at canal and project sites of Mechanical Store Sub Division Ch. Sambhajinagar under this Division
Strengthening, Empowerment and Handing Over of W.U.A. on distribution system of LIS I to IV, Kolara Distributory, LIS-3 link canal, Ancharwadi Distributory and LIS-IV Mera Distributory of Khadakpurna Project. (14423 Ha)
CONSTRUCTION OF BT ROAD FOR SHIRAPUR LIS STAGE 1 PUMP HOUSE 2 INTERNAL ROAD 300M STAGE 2 LINK CANAL TO PUMP HOUSE ROAD 1KM AND STAGE 2 PUMP HOUSE 2 INTERNAL ROAD 300M
DEVELOPMENT OF 30 METER D.P.ROAD AT PUNE SOLAPUR MAIN ROAD HADAPSAR SR.NO.79 TO 80 TO 85 UPTO MAIN RAILWAY LINE INCLUDING ALL ALLIED WORKS(PHASE 2 INCLUDING MAIN CANAL BRIDGE AND APPROACHES)
Providing Labour for Kharif season watering 2024-25 for Kalimati, Rajegaon,Dasgaon,Pandhrabdhi section and Left main canal from Km 40.00 to km 60.00 under juridication of Gondia sub division of Bagh Project.
Construcation of Concrete Road at Fursungi A) Sukhkarta Colony Lane No.15, Ganganagar B) Shiv Shambhoo Colony lane No.13 C) Riksha Stand to Avdhut Nagar Canal ubha Road, Tal-Haveli, Dist-Pune.
Providing and laying C.C. paver block in open space at Samarth Nagar, Dhikale Mala nad repairing damage C.C. roads at Masjid-E-Arkam at Canal road in P. No. 18, Nashik Road Div.
Construction of Slab drain on Khairy Soit Warora road SH-371 in Km. 4/00 Across Minor No.19 (RM-9) RD795M of Kosara Branch Canal (Bembala river Project) Tq. Maregaon Dist. Yavatmal
Providing repairs to Aqueduct at Ch.5/348 m and Ch.5/762 m and Providing Nala crossing at Ch.3/349 m, 4/00 m at Rajnala Left Bank Canal, Tal.Karjat, Dist.Raigad
Providing services of private Heavy Earth Moving Machinery operatorsfor 12 Months from date of work order as per requirement on various canal and project sites of Workshop Sub Division Aurangabad under this Division.
Providing services of Operators , Helper and Watchman for Heavy Earth Moving Machineries and Driver for Road Vehicles on various canal and project sites of Gate Erection Sub Division No-4 C Chhatrapati Sambhajinagar
Repair works of canal system for handing over area of Mauli WUA, Watkheda ( 178.83 Ha), Bhagatsingh WUA, Kolhapur (595 1Ha) Shetakari Mitra WUA, Chikhali (459.66 Ha) and Jiwan Amrut WUA, Dighi (514.99 Ha).
Constructiono of Slab drain in km. 148/900 on Wadaki Khairy Nandepera Wani Chandrapur road SH 317 Khairy Minor No. 8 RD 615 From Bembala Main Canal CH 90390 Tq. Ralegaon Dist. Yavatmal
Supply of Manpower for Daily Operations, Cleaning, Water Supply, Electrical and Other Miscellaneous Works at Sub-Division No. 5, Khed Colony and Inspection Bungalow under Gosikhurd Right Canal Division, Taluka Brahmapuri,Dist. Chandrapur.
Repairs to Service Gate (1.2 mx1.2 m, Roller Type, 10 m Water Head, 4 Nos.) and Emergency Gate ( 1.2 m x 1.2 m. 1 No.) at Bhima Sina Link Canal under Ujani Dam
Construction of Selective lining between RD 1550 to 1700 m kinhala minor and repair of VRB at RD 1189 on left bank canal of Lower Wunna Project Rama 1 Taluka Umred District Nagpur
PROVIDING AND ERECTION OF ENERGY EFFICIENT LED STREET LIGHT FROM 1) WADSA T-POINT TO SHRI SAI SCHOOL TO NURSING TO ARSODA 2) NAGAR PARISHAD OFFICE TO CANAL, AT N.P. ARMORI DISTT. GADCHIROLI
Supply of man power for water distribution of Dham main canal of Dham river project for the year 2019-20 in Kharif and Rabbi Season for Taroda Section Tah. Wardha Dist.Wardha 2nd call