Loading…
Loading…
10,120 results • Best match
TLIP Construction of Command Area Development works in PDN on the distribution system of Sangola Canal Km 34 to 50 including Running, Operation and Maintenance of System for Five years Tal Sangola Dist Solapur
CONSTRUCTION OF CANAL CROSSING IN KM-75/500 ON PATHARI MINOR-1 OFF TAKE R.D.-3520 M. FROM TAKALI DARNE DISTRIBUTORY ON WAIGAON- KANGAON- RALEGAON ROAD ( S.H.-267 ) IN TALUKA DEOLI OF DISTRICT WARDHA
Construction of Low Level Causeway (Near Watphali Aqueduct at RD 72360 M) and Construction of Inlet at RD 76840 M, 71500 M, 55280 M, 88705 M, 89220 M etc. work on Kayadhu Branch Canal
Carring out survey, preparation of detailed construction plan of pipe distribution network system for kurundvad branch canal in km 1 to 26 of dudhganga irrigatio n project Tal Radhanagari Dist Kolhapur (QCBS based tender)
Providing Labour for Hot Weather 2022-23 for Gothangaon, Arjuni/Morgaon, Wadegaon, Lakhandur and Barvha section on Itiadoh Main Canal 0 to 72.00 km. under juridiction of Arjuni/Mor Sub division of Itiadoh Project
Repair of VRB at R.D. 180 m and 2280 m and repair of DO at RD 1880m, 2270m, 3000 m, 4050m, 5830 m at main canal of Nandora minor Project Taluka Hingna District Nagpur
Construction of Earthwork, CC Lining by Mechanical Paver and Batching Plant, Structures For Km 4 To 7.5 and Balance Structures On Km 1 To 3 Of Branch Canal of Gosi Bk LIS On GLBC
Jobwork of Manufacturing, Transportation and Erection of M.S.Pipe Aqueduct for crossing of Tembhu Link-2 Canal for Minor no.-17 ,19 of Mhasurne Dy. Under the control of Ex. Engr., Urmodi Dam Division,Satara
Repairs and Maintenance to C.R. Gate and Escape Gate at 12.10 Km of Nandur Madhameshwar Express Canal as Complete job including cost of material, labour, sundry and all taxes, insurance, labour welfare cess etc
Construction of C.C. Drain From Priya Tower To Rathod House ( Canal Road Main Nallha) and From Jadhav House To Raghukul Appartment and Culvert Near Mehare House,Tale House At Wankhade Nagar In P.No. 09
TLIP Construction of Command Area Development works in PDN on the distribution system of Sangola Canal Km 16 to 33 including Running Operation and Maintenance of System for Five years Tal Sangola Dist Solapur
Construction of Canal Crossing for Vadegaon Sub Minor No.3 offtaking from Wadegaon Minor of Branch II of GLBC on Sindapuri Asgaon Lakhandur Road SH 354 at Km 2/300 Taluka Pauni, District Bhandara
Construction of CTRB at Ch 0980m CTRB at Ch 6100m Retaining Wall and Colcrete Lining Work at Km 7 and Cross Regulator at 6660m for Link Canal Between Stage 4 to Stage 5 Pumphouse
Repairs and Maintenance to C.R. Gate and Escape Gate at 25.80 Km of Nandur Madhameshwar Express Canal as Complete job including cost of material, labour, sundry and all taxes, insurance, labour welfare cess etc
Construction of BT Road From Vani Road to Chinchkhed Chaufuli Along PLB Canal RHS Part 2 Work under Maharashtra Suvarna Jayanti Nagrotthan Yojana 2025 26 at Pimpalgaon Baswant Municipal Council Taluka Niphad District Nashik
Constructing of WBM road and Canal strengthening of Service road of canal in Km No. 37 Between Village
Construction of Head Regulator and Pipe Line Distribution Network of Balance CADWM work for Kavathemahankal Canal Km 1 to Km 35 Including Running Repairs and Maintenance of the system for five years TalKavathemahankal Dist Sangli
Repairs and Construction of Fall cum VRB at RD 6834m 11550m and outlet at RD 10600m and Selected Lining at Rd. 9000m to 10000m of Saoner Branch Canal of Kolar Medium ProjectTaluka-Saoner Dist- Nagpur
Supplying Heavy Duty Operators , Drivers , Helpers and Choukidar for Operation , maintenance watch and ward of various heavy earth moving machineries , Tippers , Pick up vans etc working at various earthwork or canal cleaning siteas per necessary
Construction of Pipe distribution Net Work P.D.N. for Aljapur Distributary at Ch 85.170 for Dhom Balkawadi R.B.C. Tal Phaltan and Dist. Satara
Strengthening of Road from Main dam to Saddle dam, Terwanmedhe pickup weir to Belgavi State highway, Main dam to Dodamarg-Belgavi State highway upto Mini colony , Pickup weir to Minicolony ANMain colony to Saddle Dam of Tillari Irrigation Project.f
Urmodi Irrigation Project Construction of RCC gutters and gutter crossing at Reh. Village Diwad-1 Tal. Man Dist. Satara and Construction of internal road, CD works on internal road, RCC gutters, Gutter crossing, HPC on nalla, at Reh.Village Mhaswad
Repairs and Maint.of Irrigation Outlet S.G E.G.Gate and Dismentling of old Rusted and Broken stair case and new Mfg.of stair case in well and Hoist Platform Mfg. Erection of cabin for SG and relative mechanical work .of Kondye M.I.Tank.
INVESTIGATION AND FOUNDATION EXPLORATION (TAKING TRIAL BORE HOLES) FOR THE MIRGAVAHAN GRAVITY MAIN PIPELINE WORK, TQ. KARMALA, DIST. SOLAPUR FROM MIRGAVHAN PUMP HOUSE TO D/S OF SINA KOLEGAON DAM UNDER LIS NO.2 OF KRISHNA MARATHWADA IRRIGATION PROJECT
Supplying labours for flood control work in the month of June 2024 to November2024 for Hatnur Dam Section and Operation of irrigation outlet submersible pumps in gallery and Maintenance and repair work of Radial gates and complete electrical system
To carry out necessary Building works at the old and new rest house premises and dining hall premises of the Irrigation Department Rest house in Baramati also Installation of street lights, Supply furniture components, Electrify the area, Construct a
Construction of Slab drain on Khairy Soit Warora Road SH-371 in Km. 3/00 Across minor No.16 (RM-8) RD 1190 M of Kosara Branch Canal (Benbla River Project) Tq. Maregaon Dist. Yavatmal
Repair of Nalla Syphone at RD 3300 m and 3780m, Excavation of Hard Rock at RD 9300m and Repair of Aqueduct at RD 5350 at Main Canal at Sirsi Minor Project Taluka Umred District Nagpur
Providing C.C. Lining from R.D. 15660 to 15860 M. and from R.D. 17900 to 18000 M. for Tail Distributory for section Hinganghat of Left Bank Main Canal of Lower Wunna Project. Taluka Hinganghat District Wardha
Construction of Tailing Work by closed pipe for Moharana Minor No. 2, 3, 4, Tail Minor on Gawarala Distributory, Tail Distributory of branch Canal No 3, L-5 Tail Minor on Masal Distributory of GLBC.
Repairs to direct outlet at the rate RD 1230M, 1460 M, 6310 M, 7380 M, 8100 M, 8920 M, 10400 M and 10720 M of main canal of Kanholibara Medium Project Taluka Hingna District Nagpur
KKLI Project- Takari LIS- Construction of CAD works in PDN of DY. of Takari Main Canal Km 111 to 144 including Repair, O and M of the system for five, Tal- Tasgaon, Miraj Dist- Sangli.
NMC Subdivision No. 3, Welding of Distributory gates, providing manpower at Branch head of main canal to maintain the flow During rabbi and Summer Rotation period manpower for cleaning toilet and offices at Gangapur colony
Preparation of detailed construction plan for pipe distribution network system an Lining Of main Canal including necessary linear survey for pipe laying, design of pipe network and preparation of estimates and Project Report of JLIS
Shifting and Increasing Height New Erection Testing Commissioning of 33KV HT lines crossing on canal length 14950 16100 and 17100 of Upper Pravara LBC Nimgao Jali Branch at village Nimgao Jali tal Sangamner Dist Ahmednagar
various works in Haddavadh area for MC Pandharkawada Enemployed Engineers 1.Pipe drain at Sai nagar 2. Pipe drain at Aakhada Road Girls hostel to Old Canal 3. Construction of Pipe drain with Foothpath Shah
Construction of Selective Lining on RD 300 M to 410 m on bela minor 2 and on RD 200 m to 290 m on Bela Mr 3 of Left Bank Canal of lower wunna Project.
Dismantling of V.R.B. at R.D.13110m on main canal and providing kerb wall to S.R. and I.P. side to regulate the approach road for convenience of old road of Ghodazari project, Tah. Nagbhid, Dist. Chandrapur
REPAIRING OF FALL CUM VRB ON MAIN CANAL at RD 1050 M, ON KANYADOH MINOR at RD 3140, 3270 M. REPAIRING OF VRB at RD 4800 M ON KANYADOH MINOR OF KHUMARI M. I. TANK
A)Improvments to Kondharpatta to smashanbhoomi Road at Kondharpatta Ch 0/00 to 1/00 VR 598 Tal Malshiras B)Improvments to Umbare (V) Pandurang Mandir To Thitewasti Canal Patti At Umbare (V) Tal Malshiras
Construction of VRB on Ch.1355m 1800m 7050m 20300m 23600 m 29100m 31200m and constructing collapsed retaining wall at right side of aquaduct at Ch 7635m of 30m and embankment of Sule left bank canal.
Removing Thorny Shrubs and Grass From Inner side Of Canal On Km 14 To 30 Of HRBC And In Rabbi Season 2025-26 at Ch 12950 and 22608 Cr Gate Operation and Other Related Works
Repairing of Drainage Crossing at RD 2800 m, super Passage at RD 3015 of Birsi Distributory and Repairing of Super Passage at RD 48285 m of Main canal under under Kamtha Section of Bagh Project.
Constrution of selective lining in km 1 and km 2 of minor no. 1 and construction of VRB in km 2 of minor no.1 offtaking at chainage 7.450 of Dhom Balkawadi Right Bank Canal
2702 M and R to Construting Escape at Ch. 600 m. 750 m VRB at Ch. 1200 m and removing shrubby jungle and silt on main canal at Chipalipada Diversion Bandhara Tal. Sakri Dist Dhule
Providing manpower for watch and ward services for the safety of Power House and premises at Surya Canal Drop Hydro Electric Project 1X750 KW for the year 2020-21 at Sakhare Tal Dahanu Dist Palghar
Krishna Marathwada LIS No. 2 Stage No. 2 Construction of CTB Crossing of Padsali Rising Main and Shirapur LIS Solapur Canal at RD 1540 M of Rising Main Under KMIP Tq. North Solapur Dist. Solapur
Special repairing work of service road, inspection path and direct outlet, other structures of main canal from RD 0 to 350 m and Purkabodi minor from RD 0 to 1000 m under Purkabodi M.I tank.
Repairing of VRB on main canal at Rd 1900 m, 3500 m, Fall cum VRB at Rd 3600. Repairing of VRB at Rd 3700 m on Kanyadoh minor of khumari M. I. Tank (Second Call)
Repairs and Maintenance For Guniting To Waste Weir Of Manyarwadi MI Tank, Repairs to Lining On Domri Left Bank Canal And M,R to Projects in Jurisdiction of Section No. 1 And 2 Beed. (UEE)