Construction of Dry Rubble Check Dam at. Kolhewadi FC No 2, At. Udapur FC No 26, At.Aalu FC no 16 in OTUR RANGE
Strengthening and Repairing of 10 Direct Outlets on B-1 Branch Canal of Gosikhurd Right Bank Canal.
Tailing Work on Minor L7 RD 15990 m of B1 Branch Canal of Gosikhurd Right Bank Canal.
PROVIDING LABOURS FOR PETROLLING DURING KHARIF AND RABBI IRRIGATION SEASON 2020-2021 FOR PENCH IRRIGATION SECTION NAVARGAON (RAMTEK BRANCH CANAL R.D. 01 TO 09 KM, PLBC R.D. 26 TO 33 KM) UNDER PENCH IRRIGATION SUB-DIVISION RAMTE
Removing syphons on Main Canal Distributories and Branch No.1 of N R B C Providing Vehicle for Irrigation Recovery and Irrigation Management and Providing Manpower by Private Agency to assist Sectional Officers for Irrigation Management Irrigati
CONSTRUCTION OF LIFT IRRIGATION SCHEME BALHE TAL ROHA DIST RAIGAD
Constructing Earthwork and Structures of Minor No.7 of Distributary No 2 of Left bank canal of Koradi Medium Project Tal Nawapur Dist Nandurbar Civil work
Collection of Water Demand, opening and closing operation of canal gates, taking measurement of irrigable area and update irrigation account on irrigation work of main canal, minors and sub minors of LIS Stage-I, II, III, IV for Rabbi Season 2024-25
Irrigation management and operation, Dam safety, clearance, maintenance and repair to main canal Km 0 to 2, Km 2 to 5, Km 5 to 8 of Warud Minor Project. Irrigation management and operation, Dam safety, clearance, maintenance and repair to main canal
Repair work of Service gate,Escape gate,Head regulatory gate of Kanher Left bank canal and Arfal canal under the control of Executive Engineer Krishna Irrigation division satara
Special Repair of Construction of Canal Jointing KM 7 To KM 8 From D/S of Lonwal Irrigation tank on Right Bank Canal of Kundalika Project Tq.Wadavani Dist.Beed
Waghur Project Providing and engaging unskilled Labors and Machinery JCB on WLBC Asoda and Bhadli Branch canal Bhadli distributary of Waghur Left Banck Canal during Rabbi 2024 - 25 PDN testing April May 2025 and Kharif 2025 rotation
Maintenance and repaires of Irrigation Section Office and Quarter under Irrigation Offices At Veni and Sawana section offices
Construction Of Protection Wall At Head Regulator Of Akulkheda 1 Minor under Irrigation Section Chahardi Repairs to Hatnur Right bank canal near Akulkheda 1 Minor under Irrigation Section Chahardi
Wakurde Lift Irrigation Scheme Part-1 Phase No.2 For the year 2024-25, the scheme will be implemented at full capacity. V. H.T. Panel, L.T. et al. Panel ancillary works, oil filtration and topup of auxiliary fibers, overlapping works of soft starter
Providing, Fabrication and Erection of Hoisting Portal, Rope Drum Hoist, Cabin and Ballast Weight for Intake Emergency Gate and Lifting Arrangement for Trash Rack Gate for Jigaon Lift Irrigation Scheme Group No. 1, 2, 3, 4, 5 and 6 LIS-1 to 12
Construction of bitumen tar road for approach to pump House I of Ashti LIS from Ashti Khandali Road Construction of Security Wall to Ashti Pump House Stage-I Coating to Inlet Pipe Rising Main Manifold of Stage II of Ashti Lift Irrigation Scheme
Krishna Koyana Lift Irrigation Project Mhaisal LIS Jath Part Providing and fixing Isolation valve and Air valve on Hangirage Gherdi minor 6 and 1 Narale Hangirage Minor Diksal Pare Minor and Sangola dy 1 And Construction of INLET 5 Nos Foot Brid
Wakurde Lift Irrigation Scheme Part-1 Phase No.1 For the year 2024-25, the scheme for water diversion will be implemented at full capacity. V. H.T. Panel, L.T. et al. Panel ancillary works, oil filtration and topup of auxiliary fibers, overlapping wo
Providing Manpower for annual operation at Dhumakwadi Stage 1 and 2, Awarde St 1 and 2, Konjawade St 1 and 2, Bambawade main and extended St. 1 and 2, Tarali Lift Irrigation Scheme and Tarali St. 2, Pal and indoli under Tarali Project.
PROVIDING AND ERECTING FENCING OF 2.5 M 2 M CHAIN LINK FENCING AND 0.5 MHEIGHT WITH M.S. GATE WITH 5 YEAR CMC ACROSS 125 KWP GRID CONNECTED SOLAR PHOTOVOLATIC POWER PLANT FOR LIFT IRRIGATION SCHEME AT VILLAGE CHIROLI, TAHSIL -MUL, DISTRICT CHANDRAPUR
Shifting and distmentling of existing Line and Suplying, erecting, testing and commissioning of proposed 11 KV line,passing through the premises of Jigaon Lift Irrigation stage No. 8 Stage 2 Gut No 52, at Jalamb Tq Shegaon Dist Buldhana in the jurisd
Dongargaon Thanegaon Lift Irrigation Scheme, Th-Armori, Distt- Gadchiroli. Shifting of HT LT lines pole coming in the middle of outgoing work of pipeline in ro Dongargaon Thanegaon LIS at vg. Dongargaon, Thanegaon and Wasala under Armori R D c. in Ar
Supplying and Erection of Dismantling Joint ,Flanges for Erection work of Pump on Rising main 2 and Providing NRV,BFV of 1000 mm dia and Repair work of sluice valve andallied work of JiheKathapur Lift Irrigation Scheme on Rising main 1 ,Stage1,Stage
Carrying out emergency works arises at Dhumakwadi St 1 and 2, Awarde St 1 and 2, Konjawade St 1 and 2, Bambwade main and extended St 1 and 2, Tarali Lift Irrigation Scheme and Tarali st.2, Pal and Indoli under Tarali Project
Providing manpower for operation and maintenance of 132 33 KV Shindwane and 33 11KV stage 1 to 4 33 6 6KV stage 5 and 22 0 415KV stage 6 switchyards and transmission line of Purandar Lift Irrigation Scheme for 1 One year
Providing and fixing protective mesh to pump house no. 3 to 5 and Replacing precoated roofing providing and fixing protective mesh to pump house no.3 to 5 and Replacing precoated roofing sheets of Ph.No.3 of Purander Lift irrigation scheme at Shi
Strengthing of Canal embankment repair of canal earthwork and Structure for regular irrigation purpose of Deoli Branch Canal, Selsura Distributory and its Disnet also Bhivapur Dy and its Disnet damaged due to heavy rain 3rd call.
Construction of protection work in KM 43 And KM 44 of Bandha Branch Canal of Tillari Interstate Irrigation Project
JOB WORK OF REPAIRS TO CANAL GATES AT VARIOUS DISTRIBUTARY WITH MOTORISATION PROVIDING CABIN TO MOTORISED PARTS AND NEW FITTING OF M S RAILING ALONG WITH PAITING AT MOHOL BRANCH CANAL
Construction of Village Road Bridge On Minor-11R Of B-1 Branch Canal of Gosikhurd Right Bank Canal.
Construction of Office Building for 5 Water User Association of B1 Branch Canal on Gosikhurd Right Bank Canal.
Mhaisal Extended Jath Lift Irrigation Scheme- Construction of Pump House and allied work at Stage No.1, 2 and 3, Manifold and Rising Main at Stage No.1, 2 and 3, Link Gravity Main with Tunnel, Distribution Chamber at Stage No.1 and 3, including Oper
Construction of Land Development Part -I Works of Field Channel on Direct Outlet And khairana minor of gavarala Distributary From Branch-3 in Command area of GLBC.98.92 Ha (CCA).
Consultancy for Technical Legal and Statutory Processes for Denotification of Gravity Command and Notification of Upstream Command Area Under Irrigation Project as per Maharashtra Irrigation Act, 1976 and MMISF Act, 2005.
Providing and Fixing In Position structural Steel Foot-Bridge at various chainages on Main Canal of Dahigaon Lift Irrigation Scheme Stage II.
As per Tender Booklet
Repair of Main Service Gate and various sliding type canal gates of size 0.3m X 0.3m on main, sub minor canal at various RDs of Malkhed Minor Project.
Construction of Dry Rubal Check Dam, Aadhe F C No 323 and Construction of Vantale at Wandre F C No 319 in Chakan Range
Construction of Dry Ruble Check Dam at Vadgaon Ghenand F C No 364 and Vantale At Kelgaon F C No 361 in Chakan Range
work of cleaning and resectioning of selected sections of mamdabad and gadegaon minor and its subminors of belkhed Branch Canal akoli sub distributary talegaon 1and 2 belkhed ranegaon minors of warud distributary minor no 1 2 3 4 5 6 7and 8 of ghodeg
Repairs to Sub division office of Irrigation Construction Sub division, Aravali, Tal. Sangameshwar, Dist. Ratnagiri Non Irrigation
Execution of Ancillary works For Irrigation Management on Wandri Medium Project to operate Konkan Irrigation Season 2024 25
Construction of Closed Trough RD 2790 m To 3120 m on Dabgaon Distributary canal offtaking Rd 2553 m on Vyahad Branch canal under Renovation of Asolamendha Project. Ta - Saoli, Dist - Chandrapur under Renovation of Asolamendha Project. Ta - Saoli,
Construction of C.C. Lining in KM 1 to 9.88 of Deosary distributory at RD3720M on Chalghani Branch Canal of Isapur Left Bank Canal
Maintenance and repairs to Waghadi Main Canal and Minors including Resectioning of canal and earthwork
Maintenance and repairs to Goki Main Canal and Minors including Resectioning of canal and earthwork
Maintenance and repairs to Goki Main Canal and Minors including Resectioning of canal and earthwork
Repairs maintainance and renovation to various dam canal and irrigation management work and office building under SD 2 Jintu
2701 M and M Irrigation Project repairs to VRBAt Ch 37200m Of Ozerkhed Left Bank Canal Tal Niphad DistNashik