Loading…
Loading…
10,111 results • Best match
carrying out irrigation management work including controlling of canal measurement of area preparation of record in Rabbi and hot weather season year 2020-21 for jayakwadi irrgation subdivision No.01 Parbhani
Providing technical and non-technical mazdoor through outsourcing agency for Section offices of Dhom left bank canal from ch 58/000 to ch 110/000 under Dhom Irrigation Sub-Division, Koregaon.
Development of Modern Smart Irrigation System for Reservoir and Canal Operation Based on Real Time Information of Ujjani Project in Bhima Basin including O and M For 5 Years Tal_Madha Dist_Solapur_Maharashtra
carrying out irrigation management work including controlling of canal measurement of area preparation of record in Rabbi and hot weather season year 2020-21 for jayakwadi irrgation subdivision No.09 Lohgoan
CONSTRUCTION OF CULVERT ON CANAL OF IRRIGATION DEPARTMENT IN PRABHAG NO 23 INSTEAD OF THIS WORK CONSTRUCTION OF CULVERT ON NALLA S NO 25,26 AND CONSTRUCTION OF ROAD NEAR GLIDING CENTER
Construction of Piped Distribution Network (PDN) for Km No 02 ( From Ch. 1/000 to Ch. 2/000) of Morna Left Bank Canal under Morna (Gureghar) Medium Irrigation Project Tal.Patan, Dist.Satara.
carrying out irrigation management work including controlling of canal measurement of area preparation of record in Rabbi and hot weather season year 2020-21 for jayakwadi irrgation subdivision No.06 Pathri
carrying out irrigation management work including controlling of canal measurement of area preparation of record in Rabbi and hot weather season year 2020-21 for jayakwadi irrgation subdivision No.08 Daithana
Construction of Bridge for Degaon Branch Canal Crossing on Solapur Vijaypur Road N.H.52 in Km. 7/971 of Irrigation Department for N.H.R.B. at chainage 13/507 in State of Maharashtra
Providing labour for patrolling Rabbi irrigation on Left Bank canal 22.70 to 45 km and its Distributory, Minor ,Sub-Minor and DO of Lower Wunna Project for the year 2019-20
Construction of Pipe culverts on approach road to dam and repair to syphon at Rd 2000 m of main canal of Umari M.I. Project under Irrigation sub-Division, Arvi 3rd call
Irrigation management and Maintenance of Dongarwadi canal Km 1 to 14 and Bhose Gravity Main Km. 1 to 10 of during Rotation and Non Rotation period for the Year 2025-26
Construction of compound wall for Tillari Irrigation Colony charathe Sawantwadi of Tilari Interstate Irrigation Project.
Hot Weather Irrigation and Management works for year 2021-2022 on Irrigation Sub-Division Nawegaonbandh
Providing Vehicle for Irrigation Recovery and Irrigation Management Under the jurisdiction of Malshiras Sub division
Construction of PartI and PartIII of LD Works in chak DOR18 19 20 and Chak DOL5 DOL6 DOL 7 of Karkheli Branch Canal of IRBC UPP
Repairs to Lining to Sub Minor 1 from RD 760 to 980 m of Pardi Minor No.2 of Bhategaon Branch Canal of IRBC of UPP
Murum Topping work of approach Road of Katepurna Project Repaire of Bahadarpur Branch Canal Raptta at RD 14130 M of Katepurna Project and Repaire of main canal VRB at RD280 M790 M of Januna MI Tank
Maintainance, Repairs and Resectioning to Main Canal and minors, Repairs to Outlets of Taroda Minor No. 1 and Taroda Minor No.2, Repairs to VRB at RD 4455 m of Main Canal and HPC on Gangaon Minor of Deogaon M.I.Tank
Excavation, PCC, Soling,Paving,Flooring, Brick Curbing,Ashlar and courased rubble work,RCC water tank, Plumbing,Automatic Drip irrigation,painting,Landscape and plantation work, garden maintenance for three years.
Bhatkya v mokat kutre yanchi nasbandi shastrakriya karnyachya drushtine jaga uplabdh honyachya drushtine Movable Cages/Canals tayar karne
Repairing of Earth works and Structures of Main Canals Under MIIP At Rangawali Medium Project Tal.Navapur Dist Nandurbar
Repairs to selective portion of Embankment and Service Road of Canals at Mouje Pimpalkhuta of Purna Medium Project.
Preliminary Survey Investigation Design and Preparing Estimates for Construction of CADWM works on Gorewadi Left Bank Canal Gorewadi Right Bank Canal Kacharewadi Canal and Devikhindi Bhud Canal Dist Sangli
Repairs and Maintenance to Canal Gates Total-209 nos Canal gates of Sindhi Rahati,Jamgaon,Chinchala and Telgaon Branch Canal of Isapur Righat Bank Main Canal. Dist. Nanded
Repairs and Maintance to Canal Gates Total-205 nos Canal gates of Talni ,Bhategaon,Bhogaon,Girgaon and Chenapur Branch Canal of Isapur Right Bank Main Canal. Dist. Hingoli
Providing Minor Distributory P.V.C. Pipe Line at Dhokari,Tambhol and Ambad under the command area of Nilwande High Level Canal where water not reach for Irrigation
CONSTRUCTION OF TAILING ON SAWARGAON MINOR OFFTAKING FROM TAIL DISTRIBUTARY OF BRANCH 3 ON GLBC
Digi Khadakwasla Canal
Maintenance and Repairs work at rabbi season for Koradi Main Canal RD 0 to 49300 m,inspection of reservoir irrigation, maintenance of main canal KM 0 to 22, Fixing and Removing of M S Needle in KT Weir, repairs of slab culvert at RD 36550 m, HPC and
Repairs to Syphon at ch. 5900 M of Dy 2 and Repais Outlets of Dharangaon Section of Lower Girna Canal of Girna Project. 4470 , 900 , 1165 , 3120 , 3190 , 4290 , 4670 4720 , 4725 , 5121 , 6126
Annual operation maintenance and repairs of 5 MVA 33 6.6 KV and 0.1 MVA 33 0.44 KV transformer switchyard Equipments of Stage I Dehani 5 MVA 33 11 KV 2MVA 33 6.6KVand 0.5 MVA 33 0.44 KV transformer and switchyard Equipments of stage-II Chikhli And
Supply, erecting, testing and commissioning of 33 kV Feeder Bay, water supply arrangement, land development, internal wiring to control room and DG room, street light for barrage, pump house and PDN approach road, LT MCCB panel, battery bank, bore w
Replacement of NRV BFV AND Exp Joint at Surge Tank at Rising Main Rd 640 m (2022-23)
Annual operation maintenance and repairs of 5 MVA 33 6.6KV and 0.1MVA 33 0.44KV transformer and swichtyard equipments of stage I Dehani 5MVA 33 11KV 2MVA 33 6.6KV and 0.5MVA 33 0.44KV transformer and switchyard equipments of stage II Chikhali and 1
Gated Cement Concrete Bandhara at Akhade, Bahed-7,8 , Bhortipada-3, Khudane-1,2, Mavajipada-2,Shevdipada, Vitai-7, Nandvan-1,Navadane 5,6, Pratapapur Dighave B,C,G, Faser Check Dam Shenpur-4,5,6,Gated CCB Shiva Cement Concrete Bandhara Shivarima
CONSTRUCTION OF GATED CNB AT BAHADDARPUR NO.2 TQ. BHATKULI, BHANKHEDA NO.1 AND 2, CONSTRUCTION OF CHECK DAM BODANA TAPONESHWAR NO.1, TQ. AMRAVATI, KAWTHA BAHALE NO.1, TQ. BHATKULI, MASOD NO.1, TQ. AMRAVATI, DIST. AMRAVATI.
Construction of Vantale at Kalamb F C No 108, Dry Rubble Check dam Kurwandi, Shirudale, Dhamani FC No 243, 292, and 169, Vantale at Giravali fc no 163, Supedhar f c no 183, Vachape f c no 148
Operation and running maintenance in irrigation and non irrigation period of V.T. pumps and H.T. motors at Mhaisal LIS pump house Stage -IV and V.
STERILE DISPOSABLE CANNULA 27G IRRIGATION
STERILE DISPOSABLE CANNULA 27G IRRIGATION
Kanegaon Irrigation Tank Tq-Lohara
Repair to Irrigation Tank K.arla
LAPAROSCOPIC INSTRUMENT - SUCTION IRRIGATION SET
Drip laterals for Irrigation System
Improvemant to ujani canal left side dy 9 dy 10 Ro
Job Work For Repair Works To Various Canal Gates On Ujjani Left Bank Canal Kurul Branch Canal And Its Distributaries
Repair and Mentanance works of Canal Structures on Kur Branch Canal under Dudhaganga right Bank Canal Tal Bhudargad Dist Kolhapur
Construction of Cross Regulator Work on Kalambi Branch Canal, Salgare main Canal DY No.1, Kavathemahankal canal Km 56 to73