Loading…
Loading…
10,111 results • Best match
A) Strengthening to Chari No.2 to Canal to Kanifnath Mandir Road. At.Loni B) Strengthening to Chari No.2 Kanifnath Mandir to Shinde Wasti Road. At. Loni C) Strengthening to Irrigation Buglow to Vikas Vikhe Wasti to Chari Road At.Loni Tal.Rahata Dist.
Under Irrigation Section Ashti 1) Repair Of Aqueduct Of R.D. 11077 M. Direct Outlet Of R.D. 4085 M And Hr Of Rd 4645 M And Other Nes Work. 2) Repairing Canal Lining Against Complaint Of Beneficiary In Km 1 Of Mamdapur Minor
Construction of RCC Lining from Ch 2550 to Ch 2950 in KM 3, Ch 3000 to 3350 in Km 4 and 2620 in Km 3 to Stabilize Nalla Slope of Banda Branch Canal of Tillari Interstate Irrigation Project, Tal Dodamarg, Dist Sindhudurg.
NMC Sub Division No. 2, for the Rabbi and Hot weather seasons of the year 2025 26, the following works are to be carried out under Irrigation section Nos. 6 and 7, between chainage No. 111 to 127 of the Nandur Madhmeshwar Canal
Construction of C.C. Lining and strengthening of Earthwork of Lower Wunna project Left Bank Main Canal from R.D. 0.00 to 6.00 KM under section Rama1 and R.D 6.00 to 14.65 KM of Lower Wunna Project under Section Bela, of Irrigation Sub-Division Bela,
Transportation of New Needle Gate of size 2.15 x 0.5 MTR.Qty. 1100 Nos. From Dapodi Pune to Various Sites under baramati Irrigation Sub Dn. Baramati
MFG WITH MATERIAL LABOUR FAB SUNDRY CHARGES TRANSPORATION AND ERECTION OF 20 TON HOIST AND STELL FOR INTAKE STRUCTURE EMERGENCY GATE OF TALODHI MOKASA LIFT IRRIGATION SCHEME TAL CHAMRSHI DIST GADCHIROLI
Special repairs to Lower Terna Lift Irrigation Scheme Stage 3 at Karajkhed. Tal. Omerga, Dist. Dharashiv for V. T. Pump, H. T. Motors, H. T. Panels and other allied electromechanical equipments
Electromechanical special repairs to Lower Terna Lift Irrigation Scheme Stage 1 at Ashiv Tal. Ausa, Dist. Latur for V. T. Pump, H. T. Motors, H. T. Panels and other allied equipment
Muktainagar Lift Irrigation Scheme Providing fixing installation commissioning of IoT based data transmission system along with customized solutions and smart intelligent reconnaissance system with alternative power backup and smart intelligent int
Special repairs to Lower Terna Lift Irrigation Scheme Stage 2 at Arni Tal. Omerga, Dist. Dharashiv for V. T. Pump, H. T. Motors, H. T. Panels and other allied electromechanical equipments.
Supplying Manpower for rotation and non rotation period and petty maintenance of V T Pumps 436 HP 06 Nos at Ashti Lift irrigation scheme Stage 1 at Ashti Tal Mohol DistSolapur
Providing manpower for operation and maintenance of Switchyard equipments and filtration and topping of transformer oil of Ambhora Lift Irrigation Scheme stage II Tal- Kuhi , Dist- Nagpur for Two calendar year.
Rewinding of 3 ph,6Pole,50Hz,6.6kv HT Induction Motor of 875 KW, Supplying and Commissioning of Motor protection relays at Wambori Lift Irrigation Scheme, Stage-I tal Rahuri Dist Ahilyanagar
Providing manpower for operation and maintenanace of 2.0 MVA, 33/6.6 kV Switchyard equipments and filteration and topping of Transformer oil of Lalnala Lift Irrigation Scheme Tal.Samudrapur Dist.Wardha for Two years
Providing manpower for operation and maintenance of Switchyard equipments and filtration and topping of transformer oil of Ambhora Lift Irrigation Scheme stage I Tal- Kuhi , Dist- Nagpur for Two calendar year
Providing manpower for operation and maintenance of Switchyard equipments and filtration and topping of transformer oil of Haldipurani Lift Irrigation Scheme Tal- Chamorshi ,Dist- Gadchiroli for Two calendar year_2026 to 2027
Renovation Of Office building Of Dhom Irrigation SubDivision Koregaon and sections and Construction of Proposed Toilet at Dhom Irrigation sundivisionKoregaon and Supplying furniture to sub division and koregaon section1 koregaonsection2And Repairs
Gated Check Dam 07 work in Pandharpur Taluka and 04 in Mohol Taluka Dist Solapur
Providing Leakage Control Measures, Epoxy Treatment, and Maintenance and Repair Works to Aqueduct at Chainage 68,500 m on Gosikhurd Right Bank Main Canal, Taluka Bramhapuri, District Chandrapur.
Providing Leakage Control Measures, Epoxy Treatment, and Maintenance and Repair Works to Aqueducts at Chainage 45,660 m on Gosikhurd Right Bank Main Canal, Taluka Bramhapuri, District Chandrapur.
Const. of PartI and III of L.D. Works in Chak OR1, OR2, OR3, OR4, OR5, OR6, OR7 and OL1 of RM1 on Right Dy. No.1 of Karkheli Branch Canal of IRBC of UPP
Const. of Part I and III of L.D. Works in Chak OL6, OL7, TAIL OR8 and OR5, OR6, OR7 and OL5 on Right Dy. No.1 of Karkheli Branch Canal of IRBC of UPP
Construction of Additional structures (Patch lining ) and Tailing of Minor ML5 at RD 26085m and its Sub Minors, Minor ML6 at RD 26632 m and its Sub Minors on Gosikhurd Right Bank Main Canal.
Repairs and Maintance to Canal Gates of on Kayadhu Branch Canal 0 Km to 90 Km of Isapur Right Bank Canal.dist. Nanded
CONSTRUCTION OF D.H.P.C. AT RD 4570 M, ON MANGRUL DY AND CANAL LINING OF MANGRUL DY OFF TAKING FROM DHAMANGAON BRANCH CANAL.
Repairs Mulikwadi M. I. Tank Tal. Phaltan Dist Satara by Fixing CTF to Main Canal Repairs to Main Canal Guuage well etc.
Repair of Box-type canal portion from RD 1560m to 1770m at Main canal of Wadad Minor Project Taluka Umred District Nagpur
4701 - Construction of Road Bridge at CH. 19/070 (Kamat Shingave to Tisgaon Road)of Pathardi Branch Canal / Mula Right Bank Canal
Constructing Inlet structure on main Waghur left bank canal between and on Bhadali Branch of Waghur Left Bank Canal Tal.Jalgaon Dist Jalgaon
Construction of pipe distribution Network for Amboli left Bank Canal and Right Bank Canal from Amboli Dam, Murud Tal. Murud, Dist. Raigad.
Repairing of HR of main canal and C.C. Lining to main canal at RD 2700 to 3100 m of Kesaranlla Medium Project
Repairs to Structures and Lining Meena Feeder Canal Km No. 1 to 14 and Meena Branch Canal Km No.0 to 40
4701-Special Repairs to Ch 0 To 43 Km and Dy 1, 2 Of Pathardi Branch Canal Of Mula Right Bank Canal
Strengthening of Head Regulator of Minor R 2 at R.D. 3065 M on B 1 Branch Canal of Gosikhurd Right Bank Canal.
Repairs work for Canal structure and embankment of Slab Drain at Ch. 7/045 of Bedag main canal Km 1 to 9
Carrying out Detailed Soil Survey of Command of Aner Medium Irrigation Project Tal. - Shirpur, Dist. - Dhule
Repair to CR Gate(5.5x3.5 mtr 2-nos) and its hoist (15 ton) at ch 11/940, ch 0/750, ch.3/292 on dudhganga Left Bank Canal Dist Kolhapur
Repair necessary work of canal lining and earthwork S.N.12700 m above 100 m at main canal of panchadhara mediam project
REPARS OF IRRIGATION TANK AT 1 NIWALI 2 HANGARGA KHU. AND REPAIRS OF PERCULATION TANK AT 1 KHATGAON 2 KAMJALGA TQ MUKHED DIST. NANDED
Conducting election process, crop pattern, demonstration, training, field visit, adaptive trials, water management, handing over, strengthening and empowerment of WUA for KM 91 to 113 of Bembala Main Canal. (for 11887.63 Ha)
Murum Topping for Safety Over Main and Subsidiary bund and Maintenance and Repairs to Main Canal, Distributories and Minors in 0 to 18 Km. and 19 to 38 Km.of Waghadi Medium Project.
Servicing, repairing and maintenance of Service Gate 0.9 mtr x 0.9 mtr 1 no. n Screw Stem Hoist 8T Cap. 1 No. at Dolkhamb Minor Irrigation Scheme, Tal. Shahpur, Dist.Thane
Wai St Minor Irrigation Project Remedial works for the affected farm in village Unkhed and Jamthi on the downstream side of dam due to seepage from the Wai Storage tank
Sonal Medium Project Tq Malegaon Dis .Washim. Canal embankment and lining of main canal Village road bridge Cross regulator and other structure repairs, Syphon and OL gate repairs of main canal and Minor of the Project
Material, Fabrication, Erection and Transportation work of canal gates of various sizes and at various chainage On main canal, distributory and Sub-distributory canal at Aner Project. Tal Shirpur, Dist Dhule. for the year 2020-21
Canal Restoration/ correction and selective Lining Works on Nandur Madhmeshwar Branch Canal 2 and its Dy in between Ch. 0 to 15000 m and Ch. 15000 to 16400 m and Dy 5 of Branch Canal 1
Repair of Service Road of canal damage due to excessive rainfall in tilari cammand at in Km. No.19 of Tilari Left Bank Canal .
Construction of Cement Concrete Lining work to Mangaon branch canal between ch.0/000 to ch.26/800 m, Morba branch canal between ch.0/000 to ch.15/150 m, Ashtami branch canal between ch.23/000 to ch.28/000 m under Kundalika Left bank canal, Also Recon