Loading…
Loading…
10,111 results • Best match
Providing Labour On HRBC Km 14 To 30 and On right bank of Tapi river For irrigation and Non irrigation management work under irrigation Section Padalsa for Rabbi Season 2023-24 and Providing Labour Cr at Ch 12950-Cr at Ch 22608 For Gate Operation
IMPROVEMENT TO KATI CANAL TO HEGADEWASTI ROAD AT - KATI TAL INDAPUR
IMPROVEMENT TO KATI CANAL TO HEGADEWASTI ROAD AT - KATI TAL INDAPUR
The work of Consultancy Services for Designing, Vetting of Canal Structures from Competent Authority as per Revised Discharge and Preparation of detail Estimate of Structurs of Left Bank Canal and Right Bank Canal of Lower Penganga Project
Providing Private Security to Pump House at Purandar Lift Irrigation scheme Stage I to VI for one year period i.e 365 Days of the year 2017 18 Tal Haveli/Purandar, Dist Pune
Operation of 2 Nos. of V.T. Pumps M and P make 525 H.P. in 3 shifts Electrical and Mechanical equipments such as EOT crane and various valves at Shirala Lift Irrigation Scheme
Krishna Koyna Lift Irrigation Scheme - Repair and Maintenance work of Takari Dudhari old pipe line and Sonsal stage IV pipe Distribution network near Main D.C. of old main - 2 RCC pipe line.
Design, manufacture, supply, erection, testing and Commissioning of Earth-Mat for 33/6.6 KV switchyard And Permanent water supply arrangement to Earth Pits for Sihora Lift Irrigation Scheme Tal-Savner Dist- Nagpur
Providing Private Security, Sweeping and cleaning to Pump House at Janai Stage 2 Lift Irrigation scheme, Tal Baramati, Dist Pune for one year period i.e 365 Days of the year 2017 18.
Providing Private Security, Sweeping and cleaning to Pump House at Janai Stage 3 Lift Irrigation scheme, Tal Baramati, Dist Pune for one year period i.e 365 Days of the year 2017 18.
Fabrication and Erection works of Over Head Water Tanks Providing and Erecting Pump and its accessories Required for Filling Over Head tanks etc at Kolambi Lift Irrigation Scheme Tq Naigaon Dist Nanded
Construction of Pipe Distribution Network For Ranmasale Dy ( Balance work of PDN) and its Minor (1A,1,2,3,4,5,6,7,8,9,10,11,12,13,14,14A) Offtake From Delivery Chamber II of Shirapur Lift Irrigation Scheme , Including formation of WUA, Training,
Providing Private Security, Sweeping and cleaning to Pump House at Janai Stage 1 Lift Irrigation scheme, Tal Daund, Dist Pune for one year period i.e 365 Days of the year 2017 18.
Constructing Earthwork and Structures in Km. 1 to 15 of Tail Canal of Upper Pravara Left Bank Canal Tal. Rahata Dist.Ahmednagar.
KBC and TBC Branch Canal
Shifting of electrical lines crossing between various places of Warana Left bank canal Km 1 to 70
Special repair of Distribution system of Left bank main canal of Arunavati project Tal. Digras, Dist Yavatamal, Canal Rd 0 to 44 Km
Reconstruction of VRB at 1560 m. from the right main canal of Khamari EX.Mal. Tank and 590 m. from the left main canal.
Construction of Bituminous Approch Road of VRB of Masal Distributory and Hardoli Distributory of Branch Canal No.1 on Gosikhurd Left Bank Canal
Carrying out survey , Preparation of design, Drawings on AutoCAD of Main Canal, Branch Canal , Distributories and Minors Shankarraoji Chavan Vishnupuri Project under MIIP
Repairs of Canal at RD 600 m to 1000 m and lining of Left Main Canal of Bewartola Project. Tah. Salekasa Dist. Gondia
Taking trial bores for Proposed Kudali Feeder Canal Acqueduct Ch 0_048 m and Junction of RBC _ Feeder canal Ch. 2941 m.Tal_Jaoli, Dist_ Satara
Repairs and maintenance work of service gate, Emergency gate, At Paithan Right Bank Canal and Paithan Left Bank Canal Jayakwadi Project Dist Aurangabad
Increasing Capacity of Nimgaon Minor at Ch 12 obliq 300 of Karjat Branch Canal of Kukadi Left Bank Canal Tal Karjat Dist Ahmednagar
Special repair of Distribution system of Right Bank main canal of Arunavati project Tal. Digras, Dist Yavatamal, Canal Rd 0 to 44 Km
Construction of DHPC Pimpalgaon sub minor offtaking from Branch canal and Tailing of minors and sub minors from Branch canal of Nerla LIS.
Manufacturing, Fabrication and Erecting Sliding type canal Gate/HR/Ecsape gate For Isapur Left Canal within km 1 to 15 with hoisting arrangement.
Constructing Steel Foot Over Bridge on Left Bank Canal and Right Bank Canal of Upper Pravara Nilwande II Project Tal Akole, Dist Ahilyanagar
Repair and Maintenance of LIS Stage III Main canal, Minor No.1,2,4,5,6,Amona Tail Minor and its Minor for Rabbi Season 2024-25 of Khadakpurna Project.
Construction of Additional Structure of LM-1,2,3 in Km 1 to 6 of Chinchala Branch Canal.
Supplying Man power by Out Sourcing for Irrigation Management work and preparing Assesment sheets (Akarani Patrake) of as sectional Offices under Arphal Irrigation Subdivision Masur.
Repairs to Bridge on km 81 84 with required all type of materialfabrication painting and erection including dismanteling of old bridge arrangement at site Ujani Right Bank Canal under Executive EngineerBnima Irrigation Division Pandharpur
Constructing Aggriculture Canal At Osargaon Gavthanwadi Tal Kankavali 2ND CALL
Construction of Land Development works (Part -I Works of Field Channel) on Vikasganga (Khairyghar) ,Chulband (Bothali),Jalamrut (Kinhi) Unnati (Gunjepar) Water User Association in Command area of Branch Canal No. 1 of GLBC.1349.58 Ha (CCA).
Manufacture and Repairs to K.T. weir Needle 2.15x0.5 Mtr on Various K.T. Weir Under Nanded Irrigation Division (South), Nanded, Purna Irrigation Division, Basmat Nagar, Lendi Project Division, Degloor
Repairing The Distribution System In The Area Of Krushak W.U.A. ,Warud Bagaji Of Irrigation Section No.-2 Mangrul Dastagir Under Upper Wardha Irrigation Sub Division No.-3, Dhamangaon
MANUFACTURING AND SUPPLY STRAIGHT TYPE NEEDLE GATES 917 NOS ON MAAN RIVER FOR K T WIERS UNDER IRRIGATION SUB DIVISION SANGOLA FOR BHIMA IRRIGATION DIVISION PANDHARPUR DIST SOLAPUR
Providing Man power for Irrigation Management Of kitwad, Nittur 2 Lakikatte Kajirne Dindalkop Sundi and kitwad 2 M I Tanks under Chandgad Irrigation Subdivision Chandgad Tal.Chandgad Dist. Kolhapur
Job work of Manufacturing, Transportation and erection of new Canal Gates Repairs to Sliding Type Gates of Kukadi left Canal Project km 165 to 194 with Branch Canal Distributory Direct Outlet Minor and Sub Minor complete job under Mechanical
Increasing the height of the head wall on the right bank canal of the chain no. 14/720 CTRB at Km 14 of the SMLIS and working to prevent leakage of the main canal on the Upalvate Minor at ch 2/030 to 2/250 canal of right canal of Sina Madha LIS.
Construction of Alternate Approch Road in Submergence area at New Chandika Mandir, Govalwadi, Sahanwadi, Smashanbhumi and Internal Roads at Project affected Gaonthan of Yelondwadi Minor Irrigation Project Tal. Chiplun Dist. Ratnagiri.
Construction of Part - I Work on Left Minor No.1, Left Minor No.2 and Tail Minor of Wanoja sub distributory of Tail distributory off taking at RD 112400 M of Bembla Main Canal.
Construction of Protection wall, INLET, Wing wall for approaches to VRB on Right minor No.1,2,3,4 and balance structures on Tail drain of Pimpalapur Distributory offtaking at RD 84180 m of Bembla Main Canal.
Constructing Slope Stability Measure and Laying RCC Pipe in Disturbed Poriton of Canal Due to Land Slide in Km no. 14 of TRBC. of Tillari Interstate Irrigation Project, Tal Dodamarg, Dist Sindhudurg.
Repairs to Suki Left Bank Main canal and Structures
Construction Of Sakav at shahapada Canal Mhaleghar Tal- Pen
Bijode canal to shivnala pt paipeline ta satana nk
80020 - ROOT CANAL SEALING MATERIALS POWDER LIQUID SYSTEM ENDOFLOSS
Construction of Sakav on Canal at Nandgaon Tal.Satara Dist.Satara.
Providing Security Services for Security Guard at Itiadoh Canal