Loading…
Loading…
17,282 results • Best match
Improvement to canal system
Improvement to canal system
Improvement to canal system
Construction of Kanupur Main Canal
Repair and Restoration of canal
CANAL WORK
CANAL WORK
Canal Works
Improvement to vallery Distributary from RD 10.00km to 11.60km
Canal Structure CD work
Improvement to left service road of Right distributary from Saniganda to Bhimara road of KIP, Daspalla for the year 2024-25 (From RD 16265m to 17060m)
Improvement to Harianta Distributary from RD 145m. to RD 200m.
Construction of VRB at RD 1.782 Km. on Jharpada Distributary
Restoration to Niali Distributary from RD 3.50 to 6.00 Km.
Improvement to canal
Supply Fabrication Erection Testing Commissioning of 04 Nos CR Gate and 04 Nos Escape Gate at RD 9810m Of Kanpur Main Canal under Kanpur Canal Division I Jhumpura
Improvement to Service road right bank of Angul Main Canal in between RD 9.40Km to 10.214Km of Derjang Irrigation Project. Working RD 9.889Km to 10.214Km.
Repair to Patrapada Sub-Minor-I, Patrapada Sub-Minor-II, Gudgudi Sub-Minor and Podianali Sub-Minor of Right Main Canal of Manjore Irrigation Project.
Construction of field channel work in G N Prasad sub minor and Murga Sub minor under Rengali Left Bank Canal System in Irrigation Block B
Improvement to Communication facility on Right bank of Left Main Canal from RD 5.50 KM to RD 9.10 KM including structure of Remal Irrigation Project
M/R to Right Main Canal from RD. 00m to 6500 m of Upper Jonk Irrigation Project for the year-2023-24. (Silt , jungle clearance)
Improvement to Communication facility on left embankment of right main canal from RD. 00Km to 15.00Km (working RD. 00M to 6.20Km) of Kanjhari Irrigation Project
Improvement to Communication facility of Left Embankment of Right main canal from RD. 7.200Km to 15.100Km (working RD. 7.200KM to 12.400KM) of Kanjhari Irrigation Project
Improvement of canal including construction of RCC trough of Bargaon Sub-Minor off-taking at RD. 0.60m of Bargaon minor of Lower Indra Irrigation Project
Improvement to Canal Service Road in between RD 0.00 mtr to 2755 mtr with provision of trough wall of Kamakhyanagar Minor of Rengali Irrigation Project
Improvement to canal service road at Left bank of RMC of Dadaraghati Irrigation Project from Dam Site at RD 0.00km to Kadapada at RD 9.70km.
Improvement to Tainsar minor by raising trough wall and providing precast slab over canal passing through Madhapur Market area of LMC of Manjore Irrigation Project.
Repair to Beladula Minor and its system, Routpada Minor and its system, Bhoipada Minor and its system of Right Main Canal of Manjore Irrigation Project.
Providing R.C.C. lining trough wall lining and strengthining of canal bank from RD-400mtr to 600mtr of Rafakhal Minor of Ong Irrigation Project under OIP.
Improvement to Kanjhari Dam Toe Service Road with Protection wall and Head Regulator Slab of Left Main Canal with Trough Wall of Kanjhari Irrigation Project
Re-sectioning and Cement Concrete Lining to Uttei Main Canal from Rd 00 m to 10090 m of Uttei Irrigation Project, M.Rampur for 2022-23
Construction of field channel work in Mangalpur Sub-Minor-II, Damodarpur Minor and Botalanda Minor under Rengali Left Bank Canal System in Irrigation Block-A
Construction of field channel work in Ektali Minor , Chandar Tail Minor and Bentasalia Sub Minor under Rengali Left Bank Canal System in Irrigation Block-C
Operation of Spillway gates, canal system gates, water pump, watch and ward etc at Spillway site of Rukura Irrigation Project for the year 2026-27
De-silting of canal bed from RD 0.530 km to tail and construction of cement concrete channel wall from RD 0.100 km to RD 0.530 km of Panimetla Sub-Minor-III of Koimetla Distributary
Construction of C.C. Guard wall with bed lining from RD 1600.00 mtr. to 1820.00 mtr. of Khirapali Distributary off-taking at RD 20041.00 mtr. (L) of Attabira Branch Canal for the year 2024-25
Construction of CC lining from RD 625 to 975 mt of Minor -2 canal of Talapada Distributary of Malaguni MIP in Tangi Block of Khordha district under MIPSP scheme for the year 2025-26
Installation and Energisation of Bandapipili-VI RL Lift Irrigation Project under Kotagarh Block in Kandhamal District
Installation of Garadapaju RL and Tukulpada RL Lift Irrigation Project under Khajuripada Block in Kandhamal District
Installation and Energisation of Sadapanga-I RL Lift Irrigation Project under Daringbadi Block in Kandhamal District
Installation and Energisation of Ranimilika (Balipadar) RL Lift Irrigation Project under Phiringia Block in Kandhamal District
Installation and energisation of Lift Irrigation Projects at Kaharaganda III and IV RL under Bari Block
Installation and Energisation of Depaketa-II RL Lift Irrigation Project under K.Nuagaon Block in Kandhamal District
Installation and energisation of Lift Irrigation Projects at Hatapur Jhatia Sahi V RL under Korai Block
Installation and Energisation of Sadapanga-II RL Lift Irrigation Project under Daringbadi Block in Kandhamal District
Installation and energisation of Lift Irrigation Projects at Hatapur Jhatia Sahi Iv RL under Korai Block
Drilling Installation and energisation of Lift Irrigation Projects at B Mirzapur I TW under Jajpur Block
Installation and Energisation of Dalapada-II RL Lift Irrigation Project under Khajuripada Block in Kandhamal District
Installation and energisation of Lift Irrigation Projects at Hatapur Jhatia Sahi I RL under Korai Block
Installation and Energisation of Pandaripi-III RL Lift Irrigation Project under Kotagarh Block in Kandhamal District