Loading…
Loading…
17,282 results • Best match
Re-sectioning and Cement Concrete Lining of Left main Canal from RD 728 M to 1700 M under Bagh Irrigation Project.
Re-sectioning and Cement Concrete Lining of Right main Canal from RD 19073 M to 20500 M under Salki Irrigation Project.
Re-sectioning and Cement Concrete Lining of Left main Canal from RD 3715 M to 4800 M under Salki Irrigation Project
Canal and structure works
Construction to VRB at RD 11700m of Parmanpur Distributary for 2025-26.
Construction of VRB at RD 9500m of Parmanpur Distributary for 2024-25.
Construction of VRB at RD 1300m of Parmanpur Distributary for 2024-25.
Construction of VRB at RD 15075m of Parmanpur Distributary for 2024-25.
Construction of VRB at RD 8551m of Parmanpur Distributary for 2023-24.
Repair and General Maintenance of 7Nos Spillway Radial Gates of Upper Jonk Irrigation Project, Patara
Gate Works
Gate Works
Canal work
Improvement to canal service road in right bank from (RD 512m to 2422m) of Taradikhal distributary of Tailamal MIP (D/W) in Athagarh Block of Cuttack District under CAPEX ROAD scheme for the year 2024-25.
Renovation of 2.00m fall at RD 250m, Canal Syphon at RD 640m of Jamuna Sub Minor, Renovation of fall at RD 1083m of Sankara Minor-III of Sankara Distributary of TIP for the Year 2023-24
Strengthening of canal bank from RD14.100Km to RD14.250Km and shrub jungle clearance from RD9.00Km to RD19.750Km of Kunnanpalli Distributary and Re-sectioning and shrub jungle clearance from RD4.240Km to RD6.900Km of Kattanpalli Minor and from RD0.00
Construction of both side CC Guard wall with bed lining and fall repair in between RD 503m to 683m of Tangarpali Distributary off taking at RD 24384m of Attabira Branch Canal for the year 2026-27
Supply fabrication, transportation erection of Gates and Hoists by dismantling old gate structure of Kaudia Sluice on K V Rt Embankment at RD 67 300 KM of Gop Irrigation Sub Division under Nimapara Irrigation Division Nimapara for the year of 2025
Earth Work, Concrete Work
Earth Work, Concrete Work
Earth Work, Concrete Work
Cement Concrete lining
Earth Work, Concrete Work
Bank strengthening from RD 7.00 km to 7.30 km of Koimetla Distributary and bank widening from RD 0.50 km to RD 2.00 km of Koimetla Minor of Koimetla Distributary
Supply Fabrication Erection Testing and Commissioning of CR cum HR Gate Hoist of uktapur Minor at RD 56097Mtr Of Baisinga Branch Canal under Baisinga Canal Division Laxmiposi for the year 2024 25
Repair and restoration to Banpur main canal
Construction of VRB
Desilting and improvement of left distributary in between RD 1550 m to 2500 m, 3500 m to 4550 m and feeder channel from RD 450 m to 950 m of Baghua Irrigation Project for the year 2026-27.
Improvement to canal
Laying HDPE main Pipe line,UGPL I and UGPL II Pipe line with construction of different structures for pipe line Network at Cluster No-VI in Parkod Check dam under NAFCC Project Nuapada
Laying HDPE main Pipe line,UGPL I and UGPL II Pipe line with construction of different structures for pipe line Network at Cluster No-III in Palsabhadar Check dam under NAFCC Project Nuapada
Fabrication Supply Transportation and Erection of sluice gate for VRB cum check dam near village ogalapur on main drain of sridhala rankei D C under drainage Division jagatsinghpur for the year 2022 23
FABRICATION, SUPPLY, TRANSPORTATION AND ERECTION OF 5 NOS. OF CHECK DAM-CUM-SLUICE OF SIZE 3M X 1.9M CUM FARM LAND BRIDGE NEAR VILLAGE ITANGA OF ITANGA D/C UNDER DRAINAGE DIVISION, JAGATSINGHPUR.
Laying HDPE main Pipe line,UGPL I and UGPL II Pipe line with construction of different structures for pipe line Network at Cluster No-IV in Palsabhadar Check dam under NAFCC Project Nuapada
Laying HDPE main Pipe line,UGPL I and UGPL II Pipe line with construction of different structures for pipe line Network at Cluster No-V in Parkod Check dam under NAFCC Project Nuapada
Construction of KANTAL- 2 in-stream storage structure (Low height check Dam) over Kantal nalla near village Kantal in ATABIRA Block of Bargarh District under MATY-3 Scheme for the year 2026-27
Laying HDPE main Pipe line,UGPL I and UGPL II Pipe line with construction of different structures for pipe line Network at Cluster No-II in Budhipali Check dam under NAFCC Project Nuapada
Laying HDPE main Pipe line,UGPL I and UGPL II Pipe line with construction of different structures for pipe line Network at Cluster No I in Budhipali Check dam under NAFCC Project Nuapada
Construction of BANJIMAL KHADIAPARA in-stream storage structure (Low height check Dam) over Brahmani nalla near village Lakhanpur in Ambabhona Block of Bargarh District under MATY-3.0 Scheme for the year 2026-27
Construction of BANDA- 2 in-stream storage structure (Low height check Dam) over Landijori nalla near village Banda in BARGARH Block of Bargarh District under MATY-3 Scheme for the year 2026-27
Construction of JAMDHUDA- 1 in-stream storage structure (Low height check Dam) over Local nalla near village Banjujhula in PADAMPUR Block of Bargarh District under MATY-3 Scheme for the year 2026-27
Reconstruction VRB at RD 1050m with slope lining of Ambadola Distributary.
Improvement to service road of Aunli Main Canal from RD 4370m to RD 4656m and Tail Minor from RD 00 to RD 1500m of Aunli Irrigation Project.
Improvement and Cement Concrete lining to 41L Sub-minor at RD 400 m of Baghua Right Branch Canal of Baghua Irrigation Project for the year 2025-26.
Construction of temporary cross bond ( with sand bags) at different location of Left Main Canal of of Lower Indra Irrigation Project for Rabi water supply 2024-25
Improvement and C.C Lining to Badanala Main Canal in between RD 17246 M to 32650 M including off taking Minors and Sub Minors of Badanala Irrigation Project
Improvement to Left Bank Service Road of Right Main Canal in between R.D 3200m to R.D 4700m of Sapua Badjore Irrigation Project. (Working RD 3200m to 5007m).
M/R to Desilting from RD 00m to 13500m of Left Main Canal of Upper Jonk Irrigation Project for the year 2023-24 (Silt and Jungle Clearance)
M/R to LMC from RD 00m to 5000m of Sundar Irrigation Project (Resectioning and jungle clearance of canal and outlet repair) for the year 2023-24