Loading…
Loading…
3,574 results • Best match
Construction of Earthen Check Dam, DSMP and Bench Terracing at Gram Panchayat Dhamniya, Bharev, Laku Kaleva PS LASADIYA ( By IWMP 20)
Earthen Check Dam,Farm Pond,Sunken Pond And RTWHS, other water harvesting Structures under MJSA 2.0 Phase- IInd Block Malarna doongar
Earthen Check Dam,Farm Pond,Sunken Pond And Talab Renovation, other water harvesting Structures under MJSA 2.0 Phase- IInd Block Bamanwas
Mitti Ke Check Dam, Farm Pond, Periferal Bund, Field Bunding and Water Conservation Work under Block Sawai Madhopur District Sawai Madhopur
CONSTRUCTION OF PAKKA CHECK DAM AND GABION STRUCTURE AT W.C. PARAPEEPLI, RANAYRA UNDER PMKSY-2.0 (WDC-3) P.S. DAG DISTRICT JHALAWAR
Construction of Farm Pond, Renovation / Restroration of WHS, Field Bund, Recharge Shaft for Aqifires and Pakka Check Dam in PS Chhabra
RGJSY Phase 1 ( Jaswantpura Block ) Contour Continuous Trench (CCT) , Pakka check Dam, WHS and Sub Surface Barrier in Gram Panchyat Tatol
1_Construction work of Anicut (3), Pucca Check Dam (2), Anicut cum Causeway (3) G.PTamboliya, Borao P.S. Bhainsrodgarh, Scheme MJSA2.0, District Chittorgarh
Construction of Earthen check dam ,MPT ,DSMP at Gram Panchayat jodhpurkhurd, sajnot payra, bhabrana, ghated,matasula PS jhallara ( By IWMP 30)
Construction of Amrit sarovar, Percolation tank, Anicut and pakka check dam under PMKSY 2.0 in Project Area Panchayat Samiti Keshorai Patan
Ethernet Check Dam, Farm Pond, Sunken Pond And Talab Renovation, other water harvesting Structure under Scheme PMKSY 2.0 Block Gangapur City
Construction of Pakka Check Dam-3,Anicut Renovation-3,Anicut Cum Cause way-1 under MJSA 2.0 Phase-III P.S. Kishanganj
Construction of Pucca Water Course in Command Area of Arthuna Distributary RD 20 Km to tail and its Systems of Mahi Major Irrigation Project Banswara
Silt clearance and Removal of Blown Sand of Lined Canal Section in offtaking canals from BRSB RD 35 to 186 (DTM) for the year 2025-26
AM and R of Canal Colony Division and Sub Dn office Building Ist Class Rest House and Canals of Sub Dn Gharsana for year 2023-24
Flood Damaged work of Mahodari talab ki dam and canals ki chain 10 to 90 tak and repair work of main canal and minor (5.20 Km.)
Silt Clearance and removal of blown sand of lined canal section in offtaking canals from BRSB RD 35 To 186 DTM for the year 2026 27
Survey,Planning,Design and Construction of Tidiyadev MST incl. Solar Based Lift Irrigation system (Sprinkler) at Tidiyadev MST of GP Timbamahudi Teh. Sajjangarh Dist. Banswara and its OandM for a period of 8 years on EPC single responsibility turnkey
Distributary RD 1080M to 4500M of main canal of Lhasi dam and silt removal,forest clearing and earthworks on Minor 1 and Minor 2.
Revamping work of balance reaches of Bajar Distributary, Kunhari Distributary, Dehit Distributary and its minors off-taking from Kapren Branch Canal of LMC of Chambal Project Part-A Bundi Division
Operation and maintenance of Pumping stations at Sanchore lift distributary, Bhadrai Lift Distributary, Panoriya Lift distributary for the Financial Year 2025-26 and 2026-27
Sakheda MIP Teh and Dist Chittorgarh Planning, Design and Const. of Solar Based Micro Irrigation Scheme at in the Command area of Sakheda MIP Teh and Dist Chittorgarh its O and M for period of 5 Years on EPC Single Responsibility Trunkey Basis.
Planning Design and Construction of Solar based Micro Irrigation Scheme at (i) Bhabrana Anicut at GP Parda Itiwar Aspur (CCA 140 Ha) (ii) Dolpura Anicut at GP Dolpura Tehsil Sabla (CCA 226 Ha) (iii) Vanvasa Anicut GP Vanvasa (CCA 140 Ha) Dungarpur
Distributary RD 1080M to 4500M of main canal of Lhasi dam and silt removal,forest clearing and earth works on Minor 1 and Minor 2.
Canal Regulation work for Kharif Irrigation of Sultanpur Sub Division CAD Chambal Kota for year 2025-26
Canal Regulation work for Rabi Irrigation of Sultanpur Sub Division CAD Chambal Kota for year 2025-26.
Maintenance and canal regulation work of CRMC Km. 39.50 to 57.50 For Rabi Irrigation year 2020-21
Canal regulation work for Kharif Irrigation of Sultanpur Sub Div CAD Chambal Kota for year 2026 27
Canal regulation work for Rabi Irrigation of Kaithoon Sub Division CAD Chambal Kota for year 2026 27
Canal regulation work for Rabi Irrigation of Digod Sub Division CAD Chambal Kota for year 2026 27
Renovation and Restoration works of Remaining Canal System of Alnia Medium Irrigation Project Tehsil Ladpura District Kota
Repair and Renovation of Main Canal and Distributory system of Bankli Irrigation Project Tehsil Ahore District-Jalore
Construction Of Anicut or Pacca check dam,P.B.,CCT and Deep CCT In Gram Panchyat Hajipur,Kaba Dahra,Bhandwada Under RGJSY P.S.Umrain.
Pucca Work - Anicut, Pakka check dam, Purculation Tank Works Total 06 work, GP- Kushalpura, Lambadabra, Semaliya, Sodalpur, Charri , PS- Suhagpura WDC-08
Pakka Work - Pakka check dam, Recharge shaft Nirman, GP- Chupna, Kodinera, Lipadi, Moheda, Mowai, Block- Arnod (MJSA-2, Phase-II, State Fund)
Pucca Work - Amrit Sarovar, Anicut/ Pakka check dam Works Total 13 work, GP- Narani, Gagrol,Kesunda,Semarda, Karunda, PS- Chotisadri WDC-3
Construction of Anicut and Pakka Check Dam in villages- Ambadara, Khatwa, Sarvai, Obla. GP- Amleeya-Ambadara, Barliya, Mena Padhar, Obla, Block-Anandpuri
Pucca Work - Amrit Sarovar Anicut or Pakka check dam Works Total 07 work, GP- Satola, Karanpur Kalan, Pilikhera, PS- Chotisadri WDC-2
Construction of Pucca Check Dam and Anicut Work in Bilwan Village GP Lamba Haldu (TADA Head) Panchayat Samiti Kotda Scheme RGJSY I
Construction of Amrit Sarovar- 1, Pakka Check Dam/Anicut - 20 and Sunkan Pond - 1 in Scheme PMKSY-2.0 Block - Chhipabarod, District- Baran
3_Construction of WHS 1 No, Pacca Check Dam 1 No and SGPT 2 No. in GP Banakiya Kallan Block Kapasan Under RGJSY
Nadi Renovation,Anicut I, Anicut II,Pasture Development and Plantation, Bank Stablizatiom , Staggered Trenches , and Loose Stone Check Dam at Nandi Goshala
RGJSY Phase 1 ( Jaswantpura Block ) Contour Continuous Trench (CCT) , Pakka check Dam, WHS , PD and Sub Surface Barrier in Gram Panchyat Tatol
Pakka Work - Anicut, Pakka Check Dam, Perculation tank and Renovation of Perculation tank, GP- Kushalpura, Lambadabra, Semaliya, Sodalpur, Block - Suhagpura WDC-8
Construction of Anicut (8), Pakka Check Dam(7), Amrit Sarovar(3) and Recharge Shaft for Aquifer (1) in PS Mangrol (PAKKA WORK)
Construction of Anicut, Pakka check dam AND WHS no.s of works 15 in under PMKSY 2.0 in Project Area Panchayat Samiti Nainwa
Silt Clearance and Removal of Blown Sand of Lined Canal Section in offtaking canals from BRSB RD 186-302(DND, SHM, GYSM) for the year 2025-26
Silt Clearance and Removal of Blown Sand of Lined Canal Section in offtaking canals from BRSB RD 186-302 (GYM, DITCH-H) for the year 2025-26
Construction of Loose stone fencing check dam, cattle guard hut, gate pillars and gate,sign board, water hole etc RDF-II Agari-IV at range neemkathana
Proposal for making coffer dam in running flow of canal at different minors/canals And Hiring of tractor driven berma for filling RWST at Urban Scheme under JEN Urban Anoopgarh Sub. Dn. Anoopgarh Dn. Anoopgarh (Canal Closure 2026)