Loading…
Loading…
3,586 results • Best match
Servicing and overhauling of 3.3 kv, 270 kw motor Sr No 2054417 and 150 kw motor Sr No 136716 at PS II malkisar with repairing of stator lead of 670 kw motor at PS I rajiasar of KSL canal for the year 2024-25
Repair, Renovation and Restoration work of Harchandera Dam and Canal, Tehsil Tonk, District Tonk, Repair, Renovation and Restoration work of Lawadar Dam and Canal, Tehsil Tonk, District Tonk, Repair, Renovation and Restoration work of Ganeta Sagar Da
Repair, Renovation and Restoration work of Choru Sagar Dam and Canal, Tehsil Uniara, District Tonk, Repair, Renovation and Restoration work of Dooni Sagar Dam and Canal, Tehsil Deoli, District Tonk, Repair, Renovation and Restoration work of Soonthra
Lining work of balance reaches 61.48 KM length at Gainta Distributory and its minor system off-taking from Etawa Branch canal of RMC CAD Kota
Harvesting and Transportation of wood from various sites of IGNP and Gang Bhakra Canal area under DOD Suratgarh
Renovation and Modernization of Anupgarh Distributary AD From RD 0.000 To 96.800 (Tail), Narawali Disty. (ND) RD 0.00 to 29.300, Lunia Minor(LM) RD 0.00 to 52.488, Jalluwala Minor(JM) RD 0.00 to 19.604
Regulation of Direct Disty. And Direct Minor of IGMN from RD 335.000 to 416.000 B/S of canal IGMN and X regulator at RD 415.250 of IGMN for The Year 2023-2024
Silt clearance and removal of blown sand in canal Khoyawalidisty (KYD) from RD 0.0 to 33
Rehabilitation of minors of Gurgaon main canal from chain 1400 to 1750 Tehsil Deeg District Bharatpur
Urgent repair / maintance of canal wherever required during the Regulation for year 2024-25 of Talera
WBM road construction work from government school to the canal opening in village Bejpur Panchayat Neemola.
Rate Contract for FEEDER IMPROVEMENT UNDER PHED PDR SUB DIVISION VII DURING CANAL CLOUSER 2025 BIKANER
Repairing and Restoration of Deeg Distributory of Gurgaon Canal from chain 0 to 400, District- Bharatpur
construction Cycle track work from Dudhwal Colony Mod to Rawatsar Road parallel to canal Hanumangarh Town
Replacement of pump set at various HW during canal closure under PDR Sub Dn. VIII Bikaner
Construction of Pucca water course in Gang Canal Project Phase-II in Chak- 12 RB-03
Repair work of damage canal between RD 2000 to 5000 meter of RMC of Kalikhar Project
Reconstruction of Minor Bridge on Gudgaon Main Canal Km 2/00 (A/R to Saheda Road)
Replacement of water supply Distribution pipe Line From PS-2 To Bank at Canal Colony Bikaner
Repair and Renovation of Left Sluice and Canal of Ghoradhara GP Bhagatpura Tehsil Kushalgarh District Banswara
Regulation and petrolling Including Watch and Ward of Burdha Canal System for the year 2025-26
Repair work of damage canal between RD 15000 to 19000 meter of RMC of Chhapi Project
Repair work of damage of main canal between RD 0 to 2000 meter of Gulendi Project
Restoration work of Salawaliya Dam and canal system Damaged due to heavy flood year 2025-26.
Repair work of damage canal between RD 10000 to 15000 meter of RMC of Chhapi Project
Construction and Commissioning of Raw water Storage tank at 190 RD of SMG canal under BADP
Regulation, Patrolling and Gate Operation Work of Right Main Canal from 39.00 km to 48.80 km.
Construction work of boundary wall and link road of Shri Devnarayan temple located near the canal
Repair and Renovation of Bhim and Bhopalsagar Tank and its canal system Tehsil Bhim District Rajsamand
Procurement of Starter, cable and submersible pump set during canal closure under distt div.-II Bikaner
Strengthening and renovation work of Main Canal and Minor of Batawadi MIP Tehsil Nainwan District Bundi
Silt clearance/Removal of blown sand from lined canal section of Chandnia mr. 0 to tail
Restoration work of Badanayagaoun dam canal RD0-5000 Damaged due to heavy flood year 2025-26.
Regulation AND Patrolling work for canal system of Gudagokulpura Dam 2025-26 Tehsil Hindoli Dist. Bundi
CONSTRUCTION OF BOUNDRY WALL TWO SIDE OF MUNICIPAL LAND AT W.NO. 08 NEAR CANAL AREA , ANUPGARH
Restoration of GandiPhli minor chain 10 to 70 of Kishanpura Branch of Alniya Right main Canal
Recommissing of source under Sub Dn. Prod. Barmer alternative water supply arrangement during Canal Closer 2021
Strengthening and Widening Badarda Phutiya to Farara mahadev Via Sayda Bheel Basti along Canal Distt. Rajsamand
Maintenance and Repairing of canal from Gandheli Zero Head to HW Karamsana Under Sub div Lalaniya
Repair of office building, First Class Rest house, SE chamber, XEN chamber in Canal colony chhattargarh
Silt clearance and removal of blown sand in canal Khoyawalidisty (KYD) from RD 33 to 144
Repair and Renovation of Jaisagar Dam and Canal System, Village Jastana Tehsil Bonli District Sawai Madhopur
Ganeshganj Lift canal minors off taking from Km 0 to 10on both side banks (24 km)
Repair and restoration of North Low-Level Canal (NLLC) of Chhaparwara dam Tehsil Dudu District Jaipur
Repair, Renovation and Restoration work of Sangram Sagar Niwariya dam and Canal, Tehsil Deoli District Tonk
Operation and Maintenance of Kolayat Lift Canal Water Supply Project Package-02 KLC-02, District Bikaner
Water supply arrangement Canal Closer 2023 Under Jen section Heera and Gida Under Sub Div Gida
Replacement of existing old gravity line, from canal distribution to main scheme under Sub dn. Khajuwala
Running of Ist Class Rest House at Canal Colony Hanumangarh Junction During the Year 2022-23
Construction of Coffer Dam Ponding during canal closure period 2026 under jurisdiction of PHED Dn Taranagar