Loading…
Loading…
3,587 results • Best match
Water Supply, Watching and sweeping at canal colony and CE office campus at Hanumangarh jn for the year 2026-27
Repair and Restoration of Canal bank and Protection work in Nyagav Minor due to flood damage Ch. 75 to 190
Regulation and Patrolling work for canal system of Pech ki Baori and Mendi Dam 2024-25 Tehsil Hindoli Dist. Bundi
Construction Of Granular Sub Base Of Sahawa Minor. From Km 0.00 To 5.000 Tail (LeftSide) Of CH. KRA LIFT CANAL.
Regulation and its related work of Right main canal in between km. 78.50 to 91.00 for the year 2023-24.
Watch and ward regulation on Main Canal from RD 1365 to 1458.500 for 01-07-2025 to 31-08-2026
Urgent repairing of quater no. V/4, V/7, V/21, V/26, V/28 and IV/1 in Canal
Watch and ward regulation on Main Canal from RD 1121 to 1254.450 for 01-07-2025 to 31-08-2026
Silt clearance and removal of blown sand from lined canal section of Nachana Upper Disty from RD 30.00 to 70.00
Flood Damaged work of Ahmadi talab ki left main canal ki Chain 50 to 140 tak repair work (2.00 Km.)
Silt clearance and removal of blown sand from lined canal section of Nachana Upper Disty from RD 30.00 to 70.00
Silt clearance and removal of blown sand from lined canal section Madasar minor and Machera minor RD 0.00 to Tail
Repair and Restoration of canal bank and protection work in Mayja minor due to flood damage Ch 8 to 68.
Supply Installation and Commissioning of Solar panels for running of Motor pumps at 0 RD Ramdev Branch Canal Area Ramgarh
Silt and Jungle clearance of Main canal RD 5800 Mtr To 7700 Mtr and Minor No. 5 of Lahsi Dam
Repair of Flood Damaged work of Parwati Main Canal between km 50 to 58 on both side banks, (16 Km.)
4. Watch and ward of 1 st class Rest house Building at canal colony Nachana for the year 2025-26
Repair and Restoration of canal bank and Protection work in Radi Minor due to flood damage Ch. 11 to 109.
Work for filling storage tanks during canal closusre period at different water supply Schemes under secton Rawla, sub division Gharsana
Silt clearance and removal of blown sand from lined canal section of Madasar minor from RD 0.00 to 21.330 (Tail)
Repair of Flood Damaged work of Parwati Main Canal between km 29 to 41 on both side banks, (24 Km.)
Silt clearance and removal of blown sand from lined canal section of Madasar minor from RD 0.00 to 21.330 (Tail)
Regulation and Patrolling work for canal system of Bankya Khal, Narayanpura and Mardiya dam 2024-25 Tehsil Hindoli Dist. Bundi
Regulation and Petrolling including Watch and Ward and Silt clearance of Burdha Canal System for the year of 2024-25
Construction of interloking work and RCC pipe from hmh canal byepass to FCI road pareek colony ward 33 hanumangarh town
Supply of spares of pump, panel, transformer, crane, VCB, switchyard and DG set etc. for Dr. Karni singh lift canal
Silt clearance and removal of blown sand from lined canal section of Bikampur minor from RD 0.00 to 46.300 (Tail)
Silt clearance, Berm Unloading Trimming and Jungle Clearance of Various Canal of Rojari sub division for the year 2020-21
Silt clearance, Berm Unloading Trimming and Jungle Clearance of Various Canal of Sherpura sub division for the year 2020-21
Construction AND Commissioning of New Shallow Tubewells and Upgradation of Old Shallow Tubewell During Canal Closure Under Sub Dn. Bajju
Water supply, watching and sweeping at canal colony and CE office campus at Hanumangarh Jn. for the year 2025-26
Repair and Restoration of Canal bank and Protection work in Haliheda Minor due to flood Damage Ch. 03 to 78.
Silt and Jungle clearance of Main canal RD 300 Mtr To 5800 Mtr and Minor No. 4 of Lahsi Dam
Regulation and Patrolling of Main Canal and Minors of Ratai Dam During rabi season 2025-26. Tehsil Shahabad, District Baran
Repair and Restoration of Canal bank and Protection work in Kapren branch Due to Flood damage Ch 365 to 575.
Item No.05 Regulation and Patrolling work of HCSP Canal System From Head to Tail for the year 2024-25
Silt clearance and removal of blown sand and berm unloading in canal khoyawali disty KYD from Rd 0.000 to tail
Work of Filling Storage Tanks at Different Water Supply Schemes Under Section Junior Engineer Suratgarh Nagar During Canal Closure Period
Work of Filling Storage Tanks At Urban Water Supply Scheme Suratgarh Under Section Junior Engineer Urban During Canal Closure Period
Silt clearance and removal of blown sand from lined canal section of Dhanori Disty from KM 0 to 11.300 tail
Construction of Granular Sub base of Sahwa disty from km 10.00 to 20.00 (R/S) of ch. KRA lift Canal
Lifting of raw water from canal to Inlet channel at Industrial Area Anoopgarh Gharsana Rawla and Udyog Vihar in Sriganganagar
Work Of Filling Storage Tanks At Different Water Supply Schemes Under Section Junior Engineer Suratgarh Nagar During Canal Closure Period
C.C. road work Near Durga mata mander and Tile road near Ramsuroop meena house to canal ward no 03 , Dausa.
Hiring of tractor driven berma for filling storage tanks in rural area during canal closure 2026 under subdivision II Bhadra
Hiring of tractor driven berma for filling raw water storage tanks during canal closures at urban water supply schemes pilibanga
Silt clearance and removal of blown sand and berm unloading in canal Bandaliwala disty (BD) from Rd 0.000 to tail
Construction of CC road from near the canal to Rajput Sabha Bhawan via Pipleshwar Mahadev and other streets in Pahadganj.
Construction of kissan path, link road 5 BB Canal bridge to 5 BB village length 1.750 Km. at KUMS - Padampur
Watch and ward regulation on Main Canal from RD 1254.450 to 1365 for 01-07-2025 to 31-08-2026