Loading…
Loading…
5,053 results • Best match
Medium Irrigation - FDR 2020 - Temporary Repairs to Voger Channel, Ramappa Lake, Palampet (V), Venkatapur (M), Mulugu District.
Providing Railing on Existing Irrigation Tank Bund of Laxmi Cheruvu at Yadadri Temple in Yadadri Bhongir District
Procurement, Supply of Tools and Equipments for Lascars Helpers pertaining to Irrigation Sub-Division No.1, Choppadandi.
Estimate for Banking and Jungle Clearance of Mathadivagu Medium Irrigation Project Wadadi (V) Thamsi (M) Adilabad District
FDR Irrigation Tank Repairs to Breached Bund Portion of Hanumanthu Cheruvu Makkapalli Village Gurrampode Mandal Nalgonda District
O&M repairs to Division and Sub Division Office Building, Irrigation Division No.04, Vikarabad, Vikarabad District
Medium Irrigation - Reconstruction of Left flank head sluice of Ramadugu Project, Ramadugu (V) Dharpally (M) Nizamabad (Dist.)
SDF-B/W of Lining wall to Irrigation Channel- Oora Cheruvu Tadkole (V), Banswada (M), Kamareddy Dist.
FDR (Immediate Retoration) to damaged irrigation Channel of Nalla Cheruvu at Sugur Village, Pebbair Mandal, Wanaparthy Dist
Reconstruction of Damaged OT Sluice and Restoration of Irrigation Channel of Marrikunta, Armoor (V&M) (3rd Call)
O&M - Improvements to Irrigation Channel & Sluice of Yapamanu Kunta at Singavaram Village, Pentlavelly Mandal, Nagarkurnool District.
Emergency Repairs to Breaches of irrigation Channels of Ramuni Cheruvu near Chilkodu (V) Dornakal (M) Mahabubabad Dist
Procurement, Supply of Tools and Equipments for Lascars Helpers pertaining to Irrigation Sub-Division No.4, Ramagundam
Estimate for Banking and Jungle Clearance of Sathnala Medium Irrigation Project Kanpa(V) Jainath(M) Adilabad District
PJP-LMC Repair and Reconstruction of Canal lining , strengthing of canal banking at km 24 of PJP LMC and at km 3, at km 3.25 of D14 in Apparala (V), Kothakota(M),Wanaparthy (Dist).
JNLIS-Repairs to be carried out for Head Regulator of Right Main Canal and Left Main Canal (Package No.103) of the Relampadu Balancing Reservoir at Relampadu village, Dharur mandal in Jogulamba Gadwal district
Musi project-O & M-"shuttering arrangements at 25.15 Km of RightMain Canal at chirumarthy cross Regulator towards Tail end contour 1No. And Tail End Ridge canal 2No.s in Chirumarthy(V) Madgulapally(M),Nalgonda(Dist.)
Repair to Breached Portion of P-15 Main canal at Km 11.660 and Removing Bushes in main canal at Km 12.685 at NH44 Highway bridge in Miraspally Village of Kothakota Mandal of Wanaparthy Dist.
REPAIRS AND RESTORATION OF O.T SHUTTERS ON UPPER MANAIR PROJECT, NARMALA(V), GAMBHIRAOPET(M), RAJANNA SIRCILLA DIST( Location Rigjht Main Canal @ D1,D1/1,D4/1,D5/1 and Left Main Canal @D2,D8 ).
PJP LMC-Branch canal-Repairs to damaged shutters for OT sluice of DP-1, DP-2, DP-3, DP3A & D-37 of PJP LMC Branch Canal in Pentlavelly (m) of Nagarkurnool(Dt)(2nd call)
I and CAD Dept., Nizamsagar Project - Construction of LIS on Nizamsagar Main Canal in Jakora Village, Varni Mandal and Chandur Village and Mandal of Nizamabad Dist., Survey and Investigation for pressure mains and canal
RBLISP-LIFT-I Construction Offtake Points on Budpur Left Main Canal (Package-21) and its distributaries, Budpur Right Main Canal (Package-22) and Low Level Right Main Canal of Chittem Narsireddy (Sangambanda) Balancing Reservoir for filling of MI tank in villages of Maganoor,Makthal,Narwa Mandals of Narayanpet District and Amarchintha Mandal of Wanaparthy District.
O&M-Restoration and Reconstruction of O.T Sluice Head walls and its shuttering arrangement for Distributary R-3 at Km.7.677 on R.F Channel under KNR Project, Kaddam Nirmal Dist.(2nd Call)
Re-construction of Damaged Off Take Sluice of Distributory No.11 at Km 7.000 and removal of deposited earth from canal bed from Km 6.350 to Km 6.975 of Pocharam Main Canal of Pocharam Project
Repairs and Reconstruction of Drop at Km.0.850 R/S Canal and Km.0.610 L/S canal of Utlapally Major, Utlapally(V), Miryalguda Mandal, Nalgonda (Dist) for the year 2024-25 ( Allotted for SC communities)
I and CADD SRSP Stage I Kakatiya Main Canal Excavation of Feeder Channel of Off Take Sluice at Km.265.900 on Kakathiya Main Canal to feed Oora Cheruvu of Enugal Village Parvathagiri Mandal Warangal District
Reconstruction of R/S Protection wall of Main Canal and Protection Wall At R/S and L/S of UT at Ch 652.68 of Sadarmatt LF Main Canal Near Lingapur (V), Kaddam (M), Nirmal (D)
Supply of Grease and Lubricants to the AKBR Head Regulator Gates, Cross Regulators on Link Canal and High Level Main Canal up to KM 26.360 of AMRSLBC Project for O and M year 2025-26
O and M - Emergency Repairs for silt removal from canal bed of 7L Minor from CH 0.00Km. to 20.675Km. of Kakatiya Canal DBM-69 of SRSP Stage-II in Thungathurthy Mandal, Suryapet District. (2nd Call)
KTPS-V&VI Stages-O&M-III- KSP canal bund raising (0.6m) from chainage 0.00Km to 0.25Km including repair works of CC lining and aqueduct, expansion joint leakages at different chainages of KSP canal, Paloncha.
SRSP-II - Construction of UT @ Km.22.075 of DBM-60 Main of Kakatiya Main Canal
Estimate for Laying of sand bags D83 main canal @ Km 4.9km, Mallapur village, Dharmaram Mandal.
Operation & Maintenance of Left Flank Canal of Kotepally vagu project, Kotepally(V&M), Vikarabad District.
Clearing of Jungle from Km 27.300 to Km 30.500 of Mylavaram Branch canal of NSLBC.
O&M - Man Power Estimate of Saraswathi Canal, Nirmal District for the Year 2021-22
Earth work Excavation of Haldivagu Desilting of LF Canal, Koppulapally (V), Yeldurhty (M), Medak Dist
O&M - Man Power Estimate for Saraswathi Canal Nirmal District for the year 2022-23
Improvement and widening of Ellamma canal Culvert in Gampalapally Area of LXPT Municipality under MGF
SDF-Lining to Alugu Gadda canal at Oora Cheruvu, Tadkole (V) Banswada (M),Kamareddy (Dist)
AME for Escape Regulators and Mukthyala Branch Canal Head regulator at Km.115.40 of NSLBC
Construction of Bridge on Pocharam canal at Kokkonda Village, Yellareddy Mandal, Kamareddy (Dist)- 2nd call
Providing of Bottle Shape Dust Bin on NSP Canal Walk Way in Khammam Municipal Corporation
Repairs to Damaged Saraswathi Canal at Km.28.15 near Babapur(V), Laxmanchanda (M), Nirmal District
FDR-2021 on Right Flank Canal of Ramadugu Project, Ramadugu (V), Dharpally(M), Nizamabad (Dist)
(3rd Cal) Emergency repair works of D53 Main canal from 41.47 km to Tail End
(3rd Cal) Emergency Repair works of D53 Main Canal from 34.04 km to 41.43 km
Repairs to Damaged Saraswathi Canal at Km.24.575 near Wadial (V), Laxmanchanda (M), Nirmal District
Restoration of Distributory D-10 Left Main Canal of Musi Project Suryapet (M), Suryapet dist.
Construction of Parapet walls to Foot bridge at Km 165.470 on Kakatiya Main Canal, SRSP
Desilting of Waddepally surplus Nala from Waddepally weir to Mangali Vagu Canal UT (Pre monsoon)