Loading…
Loading…
5,053 results • Best match
O and M Repairs to Irrigation Channel No.3 of RS Ghanpur Reservoir near National Highway, Station Ghanpur (V,M), Jangaon District (2nd Call)
O and M Kinnersani Medium Irrigation Project Repairs to head sluice Shutters of Kinnerasani Right main canal at Kinnerasani Village Palvancha mandal Bhadradri Kothagudem District
O M 2026 27 Desilting from Km. 13.020 to 15.150 of Left Main Canal of Wyra Medium Irrigation Project, Vippalamadaka (V), Wyra (M), Khammam(D)
Urgent repairs to Expansion joints of High Level Canal bridge at km 63/0-2 on NH-63 Nizamabad - Jagadalpur strech
BT on Road from Govindapuram to Patharlapadu Upto Bonakal Branch Canal in Bonakal Mandal of Khammam District, Est.Cost Rs.460.00 Lakhs
FDR-Embankment filling of damaged Canal banks at Km 33.25 on Package No.27 Near Rayanpally (V), Pangal(M), Wanaparthy(Dist).
Repair and Maintenance works of gates at chainage 6.500 km of package-48 Canal at Kothakota (V and M), Wanaparthy(Dt.)
Construction of SW Drain 1.5 x 1.4mm size from H.No. 9.9.167 to H.No. 9.9.157 at D.54 Canal in D.No. 34
Estimate for Construction of Aqueduct @ Km.0.300 of SD1 of D-25 under L.F Main canal of Kaddam Narayana Reddy Project
O&MSRSP-II-Removal for Jungle and Accumulated Earth From 0.000 To KM.4.000 of 5L/DBM54 on Kakatiya Main Canal
Laying of CC Road from Sardarpeta road to SRSP Canal at Paidipally in W.No. 03, GWMC (Reserved for Waddera Socities / Individuals)
Providing BT on R/F RDS Canal to Novroji Camp in Alampur Constituency of Jogulamba Gadwal District, Estimate cost Rs.185.00Lakhs
Removal of Silt from KM: 125.000 to KM: 131.600 on High Level Canal of AMRSLBC Project at Nakrekal(M), Nalgonda District.
O M-2025-26-Jungle clearance and desilting on D-10 Distributory of Nizamsagar Main canal from Km.3.189 to 5.870
FDR-Embankment filling of damaged Canal banks at Km 50.00 on Package No.27 Near Thellarallapally (V),Pangal(M), Wanaparthy(Dist).
Permanent Restoration of the breach formed on Distributory No.82 of Nizamsagar Canal @ KM 3.200 in Armoor (V&M), Nizamabad Dist.
Repairs to Syphon at KM 0.400 of Thanikella Major of Bonakal Branch canal, Thanikella(V), Konijerla(M), Khammam District (2nd Call)
De-Silting of Storm water drain from Naimainagar Bridge to Canal UT Via Bokkalagadda Bridge in Division ino.6 and 54
Emergency Repairs to the damaged OT Sluice shutters of R.F Canal of Thumbur Anicut at Thumbur (V), Sathupalli(M), Khammam District.
Permanent Repair to Collapsed CRS pipe culvert on D-23 Saraswathi canal at km 0.50 Koritkal (V), Mamada (M), Nirmal (D).
FDR- TEMPORARY RESTORATION OF LEFT AMIN CANAL OF UPPER MANAIR PROJECT @D-7, NEAR NARMALA(V), GAMBHIRAOPET(M), RAJANNA SIRICILLA DISTRICT.
&M-2023-24-Emergency repairs to Distributory D-11 of Nizamsagar main canal, Borlam (V) Banswada (M)Kamareddy (Dist)-2nd call
Laying of CC road and drain from kuda kuda canal masjid to malikanti ramulu(H) in kuda kuda in suryapet municipality.
FDR-2023-Repairs to Scoured portion of left side bund of D-37 NSP Canal Bhavanipet (V) Bodhan (M) Nizamabad (Dist)
Construction of L/S, U/S, D/S Wing, Retaining Wall & Apron of Drop at Km. 7.258 of D83 Main Canal.
KTPS-V&VI stages-Civil-O&M-III-Providing repairs and gravel cover to the existing WBM road of KSP canal.
Laying of cc road from annepaka raju house to yarrakunta canal at 34th ward in Kodad Municipality under State Matching Grant
FDR-Embankment filling of damaged Canal banks at Km 37.00 on Package No.27 Near Jammpaur (V),Pangal(M), Wanaparthy(Dist).
Repairs and Replacemet of Shutters for Cross Regulators on HLC Main Canal at km124.544 Nakrekal Village and Nakrekal Mandal Nalgonda District
SRSP - Stage-I - Detailed estimate for construction of RCC Crash Barriers at Km.146.625 of Kakatiya Main Canal, SRSP, LMD Colony
JNLIS-OPERATION AND MAINTENANCE WORK OF NAGARDODDI RESERVOIR,THATIKUNTA RESERVOIR AND MUCHONIPALLY RESERVOIR CANAL GATES OF JNLIS IN JOGULAMBA GADWAL DIST
I&CAD-Additional Repairs to the damaged structures of distributory D-67 at Km 92.350 of Kakatiya main canal,Jagtial(D)
Providing M.S. Gate & G.I. Diamond Jally fencing near Kakatiya University Canal Bridge at KU College of Engineering & Technology, KU Campus, Warangal
SRSP-Construction of New off Take at Km.3.500 on D-36 Distributory for feeding of tank under Kakatiya Main Canal.
Restoration of breached portion of Surplus Canal at ch Km 15 00 of Large Tank Thumbur (V) Sathupalli (M) Khammam District
Construction of Storm water drain from Auto stand to Sharbathi canal via RDO office Under Pattana Pragathi Funds in Bodhant town
O and M Estimate of Cross Regulator at Km 77.00 of Flood Flow Canal from SRSP near Mallial(M) Jagtial (Dist)
Permanent Repairs to Damaged Upstream Apron of SP at Km 31.50 on Saraswathi Canal near Lingampally (V), Mamada (M), Nirmal (D)
Formation of Gravel Road from AnganwadiCentre backside to Gollapadu Canal at old Danvaigudem in Division no. 49 in Khammam Municipal Corporation
Repairs and reconstruction of CM & CD works on Distributory No. 38 of PJP Right Main Canal, Itikyala (M), Jogulamba Gadwal (Dist)
Hiring of vehicles for clearance of bushes along the Canal from chain gate area to fishmarket madina colony in Nirmal Municipality
DMFT - Construction of New Single lane road bridge at Km 20.40 of Left main canal of Musi Project, Suryapet Mandal & District.
O and M - Removal of Silt and Jungle Clearance of RF canal, Ralla Vagu Project, Konapur (V), Kammarpally (M) Nizamabad Dist..
O and M- Repairs Repairs to Kajjarla anicut canal at Kajjarla (V) Talamadugu (M) Adilabad (Dist) for the year 2024-25
SHIFTING AND RELAYING OF MISSION BHAGIRATHA PIPELINE IN ZAFFERGADH MANDAL FOR EXCAVATION OF NASHKAL MAIN CANAL WORK-LMD DHARMASAGAR SUB SEGMENT
Filling of gravel and stone dust from Yadava nagar canal to Subash Statue at Reddypuram Road, Hanamkonda in Division No.2
Estimate for Improvement of Distributory-7(B) of AMRSLBC Project High Level canal from KM.10.000 to KM.13.000(2nd Call).
Re Call - Repairs & Restoration of 4L OT at km 6.84 and 5L OT at km 8.32 of DBM 38 main canal.
O & M Estimate for Repairs to the damaged L/s slope lining at Km 178.650 on Kakatiya Main Canal, below LMD.
Construction of under tunnel @ Km 0.335 on LF Main Canal of Goleti Reservior , Goleti (V), Rebbena (M), Kumram Bheem Asifabad Dist