Loading…
Loading…
5,055 results • Best match
(2nd Call) SBBR P 14 HLLMC-Clearing light jungle Cutting and Removal of jauliflora bushes and Removal of Silt accumulated from Km 11.00 to km15.00 for High Level Left Main Canal of Chittem Narsireddy (SBBR) Balancing Resevoir Makthal M Narayanapet Dist
Engaging of Bamboos barricading for side protection along the canal katta and engaging of labours for jungle clearance during the 5 days sammakka jatara festival at Rekurty in Div No. 18 of MCK estimate cost of Rs. 2.35 Lakhs under MGF
FDR 2025-Temporary Flood Damage Repairs to Bund Slipped on D/s of Left side bank and its raising and removal of deposited earth from Km 5.140 to Km 5.350 of Pocharam Main Canal near Malthummeda(V), Nagireddypet(M), Kamareddy(D).
Dismantling of Existing electrical System by removing the existing cable, control panels and Supply, Installation, testing and commissioning of new cables and control panels for 75T/25T Gantry crane of Left canal head regulator gates of Nagarjunsagar Dam, Nalgonda Dist
Estimate for Consultancy Services for the Detailed Survey and Investigation of DPR for the proposed Barrage at Thummidihetti V Kowtala M Kumram Bheem Asifabad District and for the Gravity Canal and Tunnel from Km 71 500 to linking the Sundilla Barrage
Restoration and Repair of Stop-Log gates, Head Regulator gates, Off-take sluice gates and its accessories of Distributaries on LLC Main Canal from Km.0.000 to Km.63.000 of AMRSLBC(P) Nalgonda(D) for the year 2021-2022(2nd call)
Operation & Maintenance of Low Level Canal Pump House ((2+1)No. x 4 MW - 320 Cusecs / Each ) located on foreshore of Nagarjuna Sagar Reservoir near Puliathanda (V), Peddavoora(M), Nalgonda District for the Year 2021-22 from 01.10.2021 to 31.05.2022
O&M - Estimate for Re construction of Badly Damaged and Collapsed Guide walls on U/s Surplus Weir from Km 5.525 to KM 5.560 of RF Main Canal of Vattivagu Project near Singaraopet (V) Asifabad (M) Kumram Bheem Asifabad Dist
Asif Nahar Project- Operation and Maintenance of Head Regulator gates, Cross Regulators, Escape regulators and O.T. Sluices from KM.0.000 to KM. 102.000 for Yasangi (Rabi) on Main Canal for the year 2021-22, of Asif Nahar Project (2nd Call)
Perodical Renewals to 1) Kodakandla -Jagedevpur Road from Km.0/4-6, 2) Rayaram - Karkapatla Road for Canal Approaches at Km.2/4-6, 9/8-10, 13/8-10,19/8-10 and 21/8-10 in Siddipet District (3rd call)
Construction of CC Drain & culvert [3 Nos] from Uppalamma temple to Culvert on pullareddy canal behind Eenadu office and CC Road from Goli sathish house to Koka Bakkayya house patch work in ward no-06 suryapet municipality(Reserved for SC)
PJP-Formation of WBM surface to ayacut road and CM &CD works from 0.00 to Km 2.00 in between Arepally and Kathepally road to 20R Minor of D-6 canal of PJP LMC in Kathepally(V) Atmakur (M), Wanaparthy (Dist).
CONSTRUCTION OF 1 NO. CROSS REGULATOR AT CHAINAGE 18.822Km. ON RIGHT MAIN CANAL OF RN SAGAR RESERVOIR AND 1NO.CR & 2 NOs OFF TAKE AT CHAINAGE 3.30Km AND 3.65KM ON LD9, OIL PLAM COMPLEX NARMETTA(VILLAGE), NANGNOOR(MANDAL), SIDDIPET(DIST), TELANGANA STATE.
(2nd Call)SBBR P 14 HLLMC-Clearing light jungle Cutting and Removal of jauliflora bushes and Removal of Silt accumulated from Km 8.00 to km 11.00 for High Level Left Main Canal of Chittem Narsireddy Balancing Resevoir Makthal M Narayanapet Dist
(2nd Call) SBBR-LLRMC-Clearing light jungle,Cutting and Removal of jauliflora bushes and Removal of Silt accumulated from Km 0.000 to km 4.000 for Low Level Right Main Canal of Chittem Narsireddy (SBBR) Balancing Reservoir, Makthal (M) Narayanapet(D).
Estimate for clearing of thick jungle Removal & cutting of juliflora bushes and removal along with jammu grown in the canal bed from Km.0.000 to Km.4.000 of distributory D-22 of HLC of AMRSLBC Project for the year-2021-22
Providing of Water Supply Arrangements, sanitary arrangements, Electrical arrangements & street lights, roads, etc.-Providing 3Nos Bore Well with Pump set along with pipeline from Sardapur Canal to 17th IR Battalion Campus at Sardapur(V) of Rajanna Siricilla District. (2nd Call-STN)
Invited under emarked work-SC/ST/Waddera/SAGARA societies are eligible to Participate Construction of off-take sluices to feed local MI Tanks from Nagarjuna Project canal under the jurisdiction of NSLBC O and M Sub-division No 2 Tekulapally
Emergency Repairs to Canal bridges and Low Level Causeway Railing at Km. 84/8-10, 88/6-8, Low Level Causeway at Km. 107/0-2 on Nizamabad-Jagadalpur Section of NH-63 in the State of Telangana 2nd Call
SBBR-P-14- HLLMC-Clearing light jungle, Cutting and Removal of jauliflora bushes and Removal of Silt accumulated from Km 15.000 to km 20.000 for High Level Left Main Canal of Chittem Narsireddy (SBBR) Balancing Resevoir, Makthal (M) Narayanapet(D).
O&M Works- Repairs to Damaged Pipe Under Tunnel at Km.0.144 and Strengthening of Vulnerable Banks from Km.0.050 to Km.0.150 of DIstributory No.44 of Pocharam Main canal of Pocharam Project Pocharam(v),Nagireddipet(m), Kamareddy(Dist).
Providing of Water Supply arrangements, Sanitary arrangments, Electrical arrangements & Street lights, Roads etc.-Providing 3Nos bore well with Pump Set along with Pipe line from Sardapur canal to 17th IR Battalion Campus at Sardapur (V) of Rajanna Siricilla District. (Recall) STN
FDR-2025-Permanent Flood Damage Repairs to Breach occured to Left side bank of Distributory No.73 from Ch 0.00 to Ch 18.00m of Pocharam Canal besides Right Side Pick up weir of Large Tank , Timmareddy (V), Yellareddy (M),Kamareddy(D)
Shifting of 0.625 KM HT/LT Line and Erection of New 1.40 KM HT/LT Line in Pebbair Town feeder at Pebbair Chowrasta to Pabbaiar Canal of Pebbair town premises in Pebbair Municipality under Municipal General Funds/15th FC/Special Funds
KTPS-V&VI Stages-Civil-O&M-II- Formation of approach road beside the canal from E rockfill to suraram main road, formation of ramps connecting to the ash pond and distributory roads inside the pond for lifting pond ash.
Removal of Jungle Julieflora and Silt Clearance on 1R Minor of D-47 Distributory of High Level Canal of AMRSLBC Project near Nakrekal (V and M), Nalgonda District. ("Tender invited under earmarked works - S.C community is only eligible to participate").
O&M - Vattivatu Project - RF Main Canal Construction of Guidewalls @ 7.750 near Kommuguda (V) @ Km 9.285 and Km 9.675 near Tenuguda(V) @ Km 11.125 near Appapalli (V) Upstream and Down Stream of Aqueducts in Asifabad (M) Kumram Bheem Asifabad Dist
O and M Estimate for Emergency Repairs, Lubrication and Painting to CR Gates And Its Hoist Bridge of SRSP ProjectIFFCC II Link Canal From MMR R S Canal Drop Cum CR Cum Off Take KM.6.600 on Main Link Canal.
I&CAD Dept., - O&M - FDR - Temporary Restoration by laying Sand bags of damaged portion of Left side old rubble stone masonry guide wall from CH 25.00m to CH 52.00m on Irrigation Channel of Right OT sluice of Chinna Cheruvu, Pinjaramadugu (V), Kamepally (M), Khammam District.
Repairs to Canal Banks and Desilting of canal bed in various reaches from km 13.400 to km 27.000 of 21st MBC in Konijerla (M), Khammam District.
Urgent repairs to D-7(B) Distributary for removal of Silt and Jammu in approach channel and at various locations in between 0.0 Km to 8.0 Km Chainages
Intermediate tower between Loc. no. 11 to 13 of 132 KV Gajwel (400 KV)-Gajwel/Chegunta (LILO)-II line to create adeguate clearance as the proposed Kaleshwaram project package-13 canal crossing near Rimmanaguda (V), in Gajwel (Mandal) of Siddipet District, Sangareddy Circle
Construction of drain and Culvert at Pingali Amulya house, at K.Vasudevarao house, Opposite A.Venkateswara Reddy house, from Linemen Kareem house to Main canal, from K.S.R.Apartment to Jabbar house, at Shouri Teacher house at 26th ward in Kodad Municipaltiy under Municipal General Fund.
Man Power O& M of Gates of Cross Regulators and OT Regulators and Head works on High Level Canal from Km 0.00 to Km 47.860 and Distributaries D5 to D18 of AMRSLBC Project for Kharif and Rabi for the year 2024-25
(2nd Call)SBBR-P-13- HLRMC-Clearing light jungle, Cutting and Removal of jauliflora bushes and Removal of Silt accumulated from Km 0.000 to km 4.00 for High Level Right Main Canal of Chittem Narsireddy (SBBR) Balancing Resevoir Makthal (M) Narayanapet(D).
(2nd Call) O and M Emergency Repairs of damaged structures (drops at 5.025km of 4L, CR at 4.500km (R/s, D/S wings and returns, apron, U/s Skin wall to bodywall) of DBM-15 of Kakatiya Main Canal, below LMD Colony, SRSP
Work Id No 63 SBBR LLRMC Clearing light jungle, cutting and removal of Jauliflora bushes and removal of silt accumulated from Km 13.00 to Km 16.00 for Low Level Right Main Canal of Chittem Narsireddy SBBR Balancing Reservoir Makthal M Narayanapet Dist
Work Id No. 64 SBBR LLRMC Clearing light jungle, cutting and removal of Jauliflora bushes and removal of silt accumulated from Km 16.00 to Km 18.50 for Low Level Right Main Canal of Chittem Narsireddy SBBR Balancing Reservoir Makthal M, Narayanapet Dist.
Temporary lighting arrangements from Jagitial Main Road to Shaikabee Colony (Canal Both sides) on hire basis for 4 Days at Sammakka Saralamma Temple in Rekurthi during the Festival of Sammakka Saralamma Jatara of MCK-2024 est cost of Rs. 9.40 Lakhs under MGF
(2nd Call)SBBR-P-13- HLRMC-Clearing light jungle, Cutting and Removal of jauliflora bushes and Removal of Silt accumulated from Km 8.00 to km 12.00 for High Level Right Main Canal of Chittem Narsireddy (SBBR) Balancing Resevoir Makthal (M) Narayanapet(D).
Painting work for the hoist bridge, hoist equipment and radial gates of the spillway, and the hoist bridge, the hoist equipment and vertical gates of the infall and outfall regulator of the Mylaram Balancing Reservoir on the Kakatiya Main Canal of SRSP-II.
2nd Call) SBBR-P-14- HLLMC-Clearing light jungle, Cutting and Removal of jauliflora bushes and Removal of Silt accumulated from Km 00.00 to km 4.00 for High Level Left Main Canal of Chittem Narsireddy (SBBR) Balancing Resevoir Makthal (M) Narayanapet(D).
Repairs and Rectification to Radial Gates & Hoists of Cross Regulators at Km 47.860,at Km63.050 & at Km 82.850 and restoration,Replacement & Repairs to Off Take Sluice Gates and its accessories of Distributories of D19A to D38 of High Level Canal of AMRSLBC Project
Engaging of blade tractor for ground levelling and bush clearance, providing barricading for public protection and spreading of stone dust at bathukamma nimmarjanam points at Arepally canal side and cheruvu side on occasion of bathukamma festival in Div No.20 of MCK
Estimate for Jungle Clearance and Land Levelling Telanganaku Haritha Haram Taking up of Dashabdi Sampada vanalu at defunct Appraoch Canal of Thotapally Lift Scheme in Sy No 937 for an extent of 03 Ac 17 Guntas at Indurthy Shivar Chigurumamidi Mandal Karimnagar Dist
Construction of drain and Culvert at Samineni Venkataiah house, at Old muslim bazaar near boring pump, at Shabbir house, On Big canal near Alvalapuram road at Old SC colony, at Mangala Raghavulu house at 4th ward in Kodad Municipaltiy under Municipal General Fund.
Repairs to Off take sluices of Kinnerasani Right Main Canal Distributories D NO 1 ch km 1.3754 and D NO 4 ch km 3.175 and RCC pippe line leakages ch km 0.10 to km 0.505 in Kinnerasani Village Palvancha Mandal Bhadradri Kothagudem district
AMRSLBC Project - Operation and Maintenance of Gates of Cross Regulators, O.T Regulators and Headworks of High Level Canal from km 100.93 to km 136.150 and Distributories D 39 to D55 for the year 2021-22 i.e from 27.01.2022 to 31.05.2022 for Yasangi season
(2nd Call) SBBR-P-13- HLRMC-Clearing light jungle, Cutting and Removal of jauliflora bushes and Removal of Silt accumulated from Km 12.00 to km 16.00 for High Level Right Main Canal of Chittem Narsireddy (SBBR) Balancing Resevoir Makthal (M) Narayanapet(D).
Supply of man power for Radial gates hoist bridge in-fall regulator and out regulator of Mylaram balancing reservoir on kakatiya main canal of SRSR-II Mylaram (V) Ryaparthy(M) Warangal(Dist) for the period 01-04-2022 to 31-03-2023