Loading…
Loading…
9,463 results • Best match
AS PER BOQ
Repair Of Type-2 (3 Quarter In South Block And 4 Quarter In Middle Block) Quarters In Canal Colony Of Upper Division Eastern Yamuna Canal Saharanpur
Silt clearance of Kulli Canal from Km. 0.00 to 14.400
Silt clearance of Dhora Canal from Km. 0.00 to 13.770
Bed and Side scraping of Siswa-Jamuaar canal 0.0-13.600km.
CONSTRUCTION OF VRB AT KM 200.900 ON EASTREN YAMUNA CANAL
Painting of 2nd stage Pump House of Sone Pump Canal.
Bed and Side scraping of Siswa-Newra canal 0.0-15.400km.
construction of RCC Drain And Slab Vinaylal Srivastav TO Canal
Bed and Side scraping of Bardpur-Bajha canal 0.0-21.600km.
cons of interlocking road and Drain Canal To Ajay Dubey
Bed and Side scraping of Alidapur East canal 0.0-15.200km.
CONSTRUCTION OF VRB AT KM 194.445 ON EASTREN YAMUNA CANAL
Reconstruction of VRB of RIGHT PAHA CANAL AT KM 10.673
Silt clearance of Bara Canal from Km. 4.200 to 14.380
Construction of canal Mubarakpur Minor From Km. 2.170 to 2.400.
Silt clearance of Kichha Canal from Km. 6.00 to 31.400
construction of RCC Drain And Slab Komal Chauhan To Canal
Silt clearance of Baror Canal from Km. 0.00 to 10.00
Painting of IInd stage pump house of Sone Pump Canal.
Construction of V.R.B. at Km. 13.765 of Left Kanhar Canal
Construction Of Brick RCC Drain and Slab Rajendra To Canal
Painting of IV stage Pump House of Sone Pump Canal.
Renovation with Expansion of Pump House At Kakarahi Pump Canal.
Reconstruction of VRB of RIGHT PAHA CANAL AT KM 11.670
Reconstruction of VRB of NEW BALLI CANAL AT KM 0.00
Rennovation of service road on left bank from km. 2.500 to 3.500 and km. 12.300 to 13.245 and right bank from km. 13.250 to 14.090 of Rajapur Distributary.
Providing and Laying 450 mm Dia, 6mm thick M.S. Pipe Conforming to IS 3589 (2001) 4.5 mtr. Long and both end welded with new M.S. Flange and Painting complete in all respects. at Adalpura Pump Canal as directed by Engineer in Charge
1-Short-term improvement work according to the safety Recommendation report of the black spot by IIT Delhi in the year 2020 marked black spot in km-6 of Delhi Nitipass Road Khatauli Portion ODR BS-43-Khatauli Canal Bridge in district Muzaffarnagar
Construction of Pump House as per drawing and IS code 456 2000 complete in all respect with TandP and labour at second stage of New Ramjanki Pump Canal Capacity 20 cusec near Village Ganchha Block Badokhar khurd Tehsil Sadar Banda Distt Banda
Renovation of Left Jamini Main Canal Service Road From Km 1.901 to 2.804, Km 6.389 to 7.311, Km 9.301 to 10.065, Km 13.901 to 15.067, Km 18.090 to 19.760, Km 23.661 to 24.957, Km 34.670 to 37.915 and Km 41.600 to 42.836 .
All work of laying, commissioning and testing of A.CMAZZA pipeline 800mm reach 3.25 to 3.30 km and M.S. pipeline 800mm reach Km 2.40 to Km 3.25 of the water distribution system of Main Mr under the new Singhvahini Pump Canal Lot-01
1st Class Brick lining work of Awahi Minor from Km. 0.820 to Km. 1.055 at Veerasarai Pump canal including all cost of material (excluding Cement and Bricks), labour, T and P used complete in all respects as per drawing provided by department
Retender Lot No. 11 Jungle and silt clearance of Gaura Minor from Km 0.000 to 3.400, Hardauli Minor from Km 0.000 to 3.500, Guthaupur Minor from Km 0.000 to 3.300 and Tera Minor from Km 0.000 to 2.300 of Ohan canal system.
Dismantling shifting and relaying Erection of new 1000 mm dia MS delivery pipe including providing and fitting of H T Bolt with Nut washer and 12mm thik rubber gasket for erection laying of delivery pipeline at Dalmau A Pump Canal stage 1st
General repair and Renewal work by PC at km 3 to 5 of Murwal to Anousa link road (3 to 5). General repair and PC Renewal work from Aliha Bus Stand to Canal Track Bilgaon link road from Km 1 to 3(500).
1st Class Brick lining work of Awahi Minor from Km. 0.585 to Km. 0.820 at Veerasarai Pump canal including all cost of material (excluding Cement and Bricks), labour, T and P used complete in all respects as per drawing provided by department
1st Class Brick lining work of Nagwa Rajwaha from Km. 4.150 to Km. 4.450 at Nagwa Pump canal including all cost of material (excluding Cement and Bricks), labour, T and P used complete in all respects as per drawing provided by department
Special repair work from B.C. in kilometers 108, 111, 112, 113, 115 to 117, 119 to 125 and 131 length 15.00 km of the left track from chainage 106.500 to chainage 148.00 of Chaudhary Charan Singh Kawand Marg canal under district Meerut
Construction of RCC Sump and Pump House as per drawing and IS Code 456 2000 complete in all respect with TandP and labor at second stage of Vindhyawasini Bhaura Danda Pump Canal Capacity 40 cusec near Village Narayarh Block Jaspura Tehsil Pailani
S/E for Jungle Clearance, Bed and Slope scraping and Silt/Theck Clearance on Right Shahzad Canal km 0.00 to 11.600 and Jungle Clearance, Bed and Slope scraping on Khiriya minor km 0.00 to 2.500 and Sansua minor km 0.00 to 1.400.
Eeart work in Restoration bank strengthening of canal bank of Majhagawan Minor from Km. 1.000 to Km. 3.400, Restoration of RCC box type drainage crossing at Km. 0.450 of Dhaukhar Minor and Construction of 40 Nos. outlet of Dhaukhar Minor and Majhaga
1st Class Brick lining work of Nagwa Rajwaha from Km. 3.550 to Km. 3.850 at Nagwa Pump canal including all cost of material (excluding Cement and Bricks), labour, T and P used complete in all respects as per drawing provided by department.
All work of laying, commissioning and testing of A.CMAZZA pipeline 500mm reach 0.00 to 0.30 km and AC Mazza Pipeline 500mm reach Km 0.65 to Km 0.70 of the water distribution system of Benamau Minor under the new Singhvahini Pump Canal Lot-05
TN-02/EE/2025-26 Repair and painting work of VRB located at Km 124.600, 126.400 128.900 129.500 130.400 of Anupshahar Branch Canal, Pashughat located at Km 126.400 (L/B), 126.400 (R/B), 127.500, 127.600 128.900, 129.400 and Fall located at Km 124.600
Work of widening and strengthening of the missing link of Padrauna Bypass in Kushinagar district from Km-540 Big Canal culvert of NH-730 to Jangal Belwa Khirkiya (increasing the length from 7.000 km and width from 3.00 meter to 7.00 meter)
Rehabilitation work of lining of the damaged part of the inner slope of left and right bank of the main western Gandak canal from km 18.900 to km 19.710, km 21.710 to km 22.360, km 23.800 to km 24.500 In district- Maharajganj
Reconstruction of 17 No. of V.R.B.s at offtaking Minors of Belan Main Canal Kharka Minor Km. 2.900 3.393 Barethi Minor Km. 3.800 Baghol Minor Km. 0.705 Imliya Minor Km. 1.690 Kundri Minor Km. 0.800 Dihipatka Minor R Km. 1.300 Thathaha Minor Km. 0.800
Construction of C type tower at Bhitaria pump canal on rapti rever crossing for 33 kv line khantara emanation from 132 33 kv ss dumariyaganj siddharthngar and construction of C type tower in 33 kv line rewa on rapti crossing near village pachaus
S/F of 20 Nos. 7.00 mtr. Long S.T. Pole with 110 to 130 watt LED Street Light Fitting, cable, switch etc. at Hoolaganj Chauraha to Munna lal Chauraha and Hoolaganj Canal Road Chauraha Via Agra Petha to Teen mandir Chauraha Danakhori.