Loading…
Loading…
9,465 results • Best match
Silt clearance from Km 0.000 to Km 1.000 and from km 3.000 to 4.800 of Prithvipur Dy,from km 0.000 to 3.500 of Shree Ram Mr,from km 0.000 to 4.000 of Kataura Mr,from km 0.000 to 2.800 of Gauri Mr,from km 0.000 to 4.400 of Gagalawa Mr and from km 0.00
SILT CLEARANCE OF TEDHI MR FROM KM 0.000 TO KM 2.700, CHAURIYA MR KM 0.000 TO KM 7.400, NAHAR CHHAPRA MR-2 KM 0.000 TO KM 4.600 LOT NO.- 10
SILT CLEARANCE LOT-31
SILT CLEARANCE OF TARUANWA DY KM 0.000 TO KM 4.200 , KOILASWA MR KM 0.000 TO KM 5.600 AND SCRAPING OF BED, INNER SIDE SLOPE TARUANWA DY KM 4.200 TO KM 5.630 AND KOILASWA MR KM 5.600 TO KM 7.400 .
SILT CLEARANCE LOT-21
SILT CLEARANCE FROM KM 8.100 TO KM 16.500 OF HARPUR DY, FROM KM 3.200 TO KM 7.400 OF CHAURIYA MONIR AND KM 0.000 TO KM 0.450 OF PIPRA MINOR.
SILT CLEARANCE FROM KM 0.000 TO KM 3.600 OF KANAURA MR., SILT CLEARANCE FROM KM 0.000 TO KM 2.600 OF AHIRAULI MR., SILT CLEARANCE FROM KM 0.000 TO KM 4.600 OF MUZAHIDA MR., SILT CLEARANCE FROM KM 0.000 TO KM 2.400 OF KURMAUL MR., AND SILT CLEARAN
ESTIMATE FOR RE-CONSTRUCTION OF DAMAGED BRIDGES AT KM 5.000 AND KM 7.000 ON MADHOPUR MR IN DISTRICT KUSHINAGAR
Repairing and resurfacing of service road on Ratanpur Dy from km 18.410 to 20.300
silt clearance of kaithawa minor
Silt clearance of Bhairampur Minor
SILT CLEARANCE OF PATEHRWA MR. FROM KM 0.000 TO KM 3.750, SAPAHI MR. FROM KM 0.000 TO KM 4.200, GURVALIYA MR. FROM KM 0.000 TO KM 2.140, DHARAM PUR MR. FROM 0.000 TO 3.400,PAKAD MR. FROM KM 0.000 TO 1.600, MANJHARIYA MR. FROM KM 0.000 TO 3.800 AND
silt clearance of Sachendi minor
DY POOTH AT KM 12.900 TO KM 14.900 TAK WORK
SILT CLEARANCE OF JOKWA DY KM 12.200 TO KM 20.200 , AND SCRAPING OF BED, INNER SIDE SLOPE OF JOKWA DY KM 20.200 TO KM 25.542 . LOT NO.- 13
Construction of Tailwall cum VRB of Kansua dy at km 27.206
Silt Clearance from km 0.000 to km 8.400 of Kotawa Mr,from km 0.000 to 2.400 of Sumahi Mr,from km 0.000 to 2.400 of Jharawa Mr,from km 0.000 to 2.200 of Patharawa Mr,from km 0.000 to 3.800 of Rampur Mr,from km 0.000 to 3.000 of Parsauni Mr and from k
SILT CLEARANCE OF DUMARIYA DY FROM KM 0.000 TO 8.400,MUKUNDPUR MR FROM KM 0.000 TO 3.000,HAPHUA MR FROM KM 0.000 TO 2.600
Work of silt removal situated on the right/left bank of the Mathiya Branch between km 0.000 and km 0.550.
Work of silt removal situated on the right/left bank of the Mathiya Branch between km 0.550 and km 1.100.
Work of silt removal situated on the right/left bank between km 1.100 and km 2.000 of the Mathiya Branch.
Work of silt removal situated on the right/left bank of the Chaf Branch between km 13.000 and km 13.400.
Work of silt removal on the Jokwa Dy. between km 7.800 and km 14.000.
Work of silt removal situated on the right/left bank of the Mathia Branch between km 8.300 and km 9.650.
Work of silt removal situated on the right/left bank between km 9.300 and km 9.700 of the Chaf Branch.
Work of silt removal situated on the right/left bank of the Chaf Branch between km 12.200 and km 12.600.
Work of silt removal situated on the right/left bank between km 13.400 and km 13.800 of the Chaf Branch.
Work of silt removal situated on the right/left bank between km 4.300 to km 4.700 of the Chaff Branch.
Silt accumulation in the inner section of the Sukhpura Escape on the left side between km 0.040 and km 0.750, and on the right side between km 1.400 and km 1.500.
Cons Of CC Road and Drain ramjeet to mahendra via canal
Canal Construction of Chandausi Branch from Km 6.540 to km 7.670
Construction of Pipe Syphon, at km.0.800 on Left Kanhar Canal
Construction of Canal From Km 2.364 to 3.000 of Rampur Minor.
Repairing of Staff Quarter at Km. 12.600 of Sone Pump Canal.
Strengthening of Nunouti Right Canal from km. 0.000 to km. 2.200
C.C.lining of Sone Pump Canal from Km. 11.183 to Km. 12.750
Repairing of Escape Gate at Km. 8.200 of Sone Pump Canal
Renovation of Store Room and Operator Room At Kathinai Pump Canal.
RESTROTION AND DEVELOPMENT OF CANAL AT NEHRU UDHYAN PARK ZONE 3
CONSTRUCTION OF CCROAD FROM MADAWARA ROAD CANAL TOWARDS ADITYA TIWARI HOUSE
Repairing of Rest House at 1st stage of Sone Pump Canal.
Construction work of VRV at km 136.488 of Eastern Yamuna Canal
Construction of boundry wall (Dah No.-02) at Mahuwarikalan Pump Canal.
Silt clearance of New Balli Canal from Km. 0.00 to 11.500
Canal Construction of Chandausi Branch from Km 10.550 to km 11.950
Renovation of store and operator room at Ramnagar Sikari pump canal.
Construction of boundry wall (Dah No.-03) at Mahuwarikalan Pump Canal.
Fixing of Fall Ceiling at 132KV S/S Yamuna Pump Canal
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repair of Underground Irrigation Pipes and Water Sprinkler POP UP System; Repair of Underground Irrigation Pipes and Water Sprinkler POP UP System; Service Provider
09-01-2024 11:00:00 Office of Engineer in Chief (Mechanical) Irrigation Department U.P. Lucknow Manufacturing And Supply Of 60 Cusec Capacity Vertical Turbine Pump Of 10.8meter Head ( 5 the number pi ), Supply Of 11KV H. T. SQUIRREL CAGE INDUCTION ... PUMP CANAL , ...