Loading…
Loading…
9,441 results • Best match
Construction of V. R.B. at in slope of River bank at Reruwa Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as directed by Engineer in Charge.
Strenthaning of River Bank by Stone Boulder Piching work at River Bank Slope at Kothighat kala Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as direc
Earth work Remodeling in Sidhna Rajwaha Chainage 8.850 km to 10.850 Km (2000 Mtr.) at Manikpur Bhujana Pump Canal Including Carriage of Earth Beyond 1 Km upto 2 Km by Tractore Trolly with manual compaction complete. As per directed by engineer in-ch
Strenthaning of Sobandha Right minor from 0.200 km to 0.500 km by Brick lining work at Sogai Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as direct
Repaire of Ramp and Stair Case for Delivery Pipline at Chhitauni Pump Canal including all cost of material (excluding Cement and Boulder), labour, T and P used complete in all respects as per drawing provided by department. as directed by Engineer in
Strenthaning of Sobandha Left minor from 1.070 km to 1.570 km by Brick lining work at Sogai Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as directed
1st Class Brick lining work of Udhorampur Minor from Km. 0.100 to Km. 0.400 at Niyardih Pump canal including all cost of material (excluding Cement and Bricks), labour, T AND P used complete in all respects as per drawing provided by department.
First Class Brick lining work of Jigana Minor from Km. 1.453 to Km. 1.753 at Guraini Pump canal including all cost of material excluding Cement and Bricks labour T and P used complete in all respects as per drawing provided by department
Strenthaning of Sobandha Left minor from 1.570 km to 2.070 km by Brick lining work at Sogai Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as directed
Earth work in Sidhna Rajwaha Chainage 10.850 km to 12.350 Km (1500 Mtr.) at Manikpur Bhujana Pump Canal Including Carriage of Earth Beyond 1 Km upto 2 Km by Tractore Trolly with manual compaction complete. As per directed by engineer in-charge Comple
Protection work for Pipline job (Size- 14.90 Mtr x 20.20 Mtr-Left side when viewing from river towards Delivery tank) at Head of Guraini Pump Canal including all cost of material (excluding Cement), labour, T and P used complete in all respects
Protection work for Pipline job (Size- 14.90 Mtr x 20.20 Mtr-Right side when viewing from river towards Delivery tank) at Head of Guraini Pump Canal including all cost of material (excluding Cement), labour, T and P used complete in all respects
First Class Brick lining work of Dabariya Minor from Km 0.100 to Km 0.400 at Guraini Pump canal including all cost of material excluding Cement and Bricks labour T and P used complete in all respects as per drawing provided by department
1st Class Brick lining work of Chhitauni minor from Km. 0.00 to Km. 0.300 at Chhitauni Pump canal including all cost of material (excluding Cement and Bricks), labour, T and P used complete in all respects as per drawing provided by department. as
Construction of Ramp and Stair at head of Baira East Pump Canal including all cost of material (excluding Cement and brick ), labour, T and P used complete in all respects as per drawing provided by department. as directed by Engineer in Charge.
CONSTRUCTION OF 33/0.433 KV, 2X630 KVA ELECTRICAL SUB STATION AT DEWAL PUMP CANAL GHAZIPUR
Unplasticized Polyvinyl Chloride(Pvc) Screen And Casing Pipes For Bore/Tubewells-IS 12818 (Q3) ()
Sprinkler Pipes-IS 14151 (Q3) ()
Brick soling of 5.620 km service road between Km 4.900 to Km 7.500, Km 25.600 to Km 26.470 and Km 27.100 to Km 29.250 of Baitalpur Dy. and reconstruction work of Kulawa on 17 canals
Renovation/ repairing on canal service road of Daina Mr from Km 1.500 to Km 1.825 and Km 1.975 to Km 2.300
Renovation/ Repairing on Canal service road of Jamunipur Mr. from Km 0.000 to Km 0.400 and Km 2.400 to Km 3.400
NABARD Funded Modernization of Ch. Charan Singh Gola Pump Canal, Dist- Gorakhpur. Supply, Installation, Testing and Commissioning of Dismantling joint 900 MM Dia suction side and delivery side at Gola Pump Canal, Gorakhpur.
Repair Of Painted Canal Service Road of Kariya Dy. From Km.5.800 to Km. 8.200 and Renewal or Reconstruction Of Painted Canal Service Road of Kariya Dy. From Km. 8.200 to Km. 9.300.
Providing, manufacturing and fitting of Lifting Mechanism of Bay No. 02 Bharna Cross Regulator Gate Size 6.00 Mtr. X 2.50 Mtr. at 69 miles on Agra Canal for Upper Division Agra Canal, Mathura
sharda main canal ke km 13.750 ( Lohiya head power house ke down stream) se km 15.900 ( Nagla cross Regulator) tak canal ke left service road ke sathah pirlapen ( Vitumin Primix Carpainting ka karya
Restoration of Ghori Canal with stone boulder lining from Ch. 1.900 Km to Ch. 2.200 Km. and between Km. 4.802 Km to Ch. 5.587 Km. and Earth work between Ch.6.00 Km to Ch. 9.200 Km
Restoration work of Gopalpur Inspection House under Narora Division Lower Ganga Canal Aligarh (LOT-01)
LOT-1 Renewal of Service Road at Pahuj Main Canal from km 18.150 to 21.500
Restoration work of Sunna Inspection House under Narora Division Lower Ganga Canal Aligarh (LOT-02)
Restoration work of Nadrai Inspection House under Narora Division Lower Ganga Canal Aligarh (LOT 03)
Repairing and Maintenance Works in Field Hostel (Room No.-1 to 7) at Canal Colony Cantt Road, Lucknow.
Repairing and Maintenance Works in Resi. No. Sa-7 and Sa-15 at Canal Colony Cantt Road, Lucknow.
Repairing and Maintenance Works in Resi. No. Sa-9 and Sa-11 at Canal Colony Cantt Road, Lucknow.
Fabrication work of MS Pipe line 1300 mm dia and associated work at Ayodhya Pump Canal ,Vikramjot ,Basti.
PROVIDING, ERECTION, COMMISSIONING TESTING OF 11 KV VACCUM CIRCUIT BREAKER 1250A, OUTDOOR TYPE PANEL FOR GYANPUR PUMP CANAL.
Renovation of old road Baruwa Main Canal from 2.320 to 5.790 km. Lot-4
Repaairing of stone masonary lining of Tons Feeder Canal From km 1.200 to 1.500
Renovation / Repairing on Canal Service Road of Barhwal Dy from Km 4.530 to 5.630
Reaparing on Canal Service Road of Thekama Dy. From km. 66.000 to km. 68.000
VIKAS KHAND KHAIRABAD MAINASI (RAIPUR CANAL ROAD SE MAINASI) SAMPARK MARG LEPAN MARAMMAT KARYA
REPAIR OF DAMAGE CANAL SERCIVE ROAD KHANDRAWALI DY. FROM KM. 27.550 TO KM 30.950
Reaparing on Canal Service Road of Thekama Dy. From km. 72.400 to km. 73.300
Const. of canal from km 0.935 to km 0.985 VRB 0.960 of Sherpur Mr.
Special Repair of Safderganj Badosarai road to Khajuriya via Sharda shayak canal Link road
vidhyak nidhi 2022-23 ke antargat CONSTRUCTION OF CULVERT OVER CANAL AT PISNARI MOHALLA
Silt clearance/scraping for Ram ganga main canal from km 2.500 to km 22.500
Reaparing on Canal Service Road of Bharauli Dy. From km. 8.000 to km. 8.500
New construction work of Villag jagdishpur chadan at canal bridge to sunil house road
Renewal of the Ahiran Dhakhwa road from the Indira Canal Track - By Departmental Plant
Const. of canal from km 1.300 to km 1.350 VRB 1.320 of Sherpur Mr.