Loading…
Loading…
17,230 results • Best match
Construction of Community Hall at Sangur beside of Sundia Canal SANSAD - VIII
Installation of 1 no. new Mini River Lift Irrigation Scheme (Solar) at ISPAR under Kaliachak-II block under Malda-II (A-M) Sub-Division Within Malda I (A-M) Division under RIDF-XXIX Programme. (PIC-R291900365)
Installation of 1 no. new Mini River Lift Irrigation Scheme (Solar) at CHAINPARA under Kaliachak-III block under Malda-II (A-M) Sub-Division Within Malda I (A-M) Division under RIDF-XXIX Programme. (PIC-R291900366)
Repair and Maintenance of Damaged roofs of Qaurters SDO type-1, SDO type-2, D1, D2, D3, D4, C1, C3 at Grrenpark and Ramnagar Irrigation Colony under Malda Irrigation Division
Improvement of Inspection Path for a length of 830 M Over damdyke of Kumari Irrigation Scheme within Blocks and PSsBalarampur and Barabazar, DistPurulia
Supply Labour for watching Guarding and operation of Gate under Mandira I Section in connection with Khariff rrigation 2026 under Asansol Irrigation Division.
Operation and maintenance of gates for Rabi Irrigation, 2025-2026including maintenance of canal on up-stream and down stream of thegates of Memari Irrigation Section under Memari Irrigation Sub-Divisionof Lower Damodar Irrigation Division
Operation and maintenance of Gates for Rabi Boro Irrigation, 2025-26including maintenance of canal on upstream and downstream of the gatesunder Jamalpur Irrigation Sub-Division under Executive Engineer-I,Lower Damodar Irrigation Irrigation Diviison
M.R of Kashipur Khalasi Shed at ch. 492.00 of Canal Kana Nadi under Jamalpur irrigation Sub Division of Lower Damodar Irrigation Division
M/R to regulator gate and structure including canal banks in connection with Kharif Irrigation 2024 from Ch 285.00 to Ch 292.00 and Ch 390.00 to Ch 413.00 and Ch 512.00 to Ch 530.00 and Ch 590.00 to Ch 600.00 of DBBC under Bonta (I) section of Ram
M/R to regulator gate and structure including canal banks in connection with Kharif Irrigation 2025 from Ch 158.00 to Ch 168.00 and Ch 207.00 to Ch 217.00 and Ch 225.00 to Ch 235.00 of DBBC and Ch 158.00 to Ch 178.00 of Dy-3 of DBBC under Margram (
M/R to removal of diposited earth from canal bed from ch-0.00 to ch. 20.0 of 502 WC and in-between Ch. 48.00 to Ch. 140.0 of Dy-2 of MDMC within Md. Bazar Block under Deocha Barrage Section of Md. Bazar Irrigation Sub-Division under MNC Division .
M/R to regulator gate and structure including canal banks in connection with Kharif Irrigation 2024 from Ch 158.00 to Ch 168.00 and Ch 207.00 to Ch 217.00 and Ch 225.00 to Ch 235.00 of DBBC and Ch 158.00 to Ch 178.00 of Dy-3 of DBBC under Margram (
Reexcavation of canal with lining from Kaligram Pry School to Maharajtola
Const of concrete road from Jamda Pry School to Canal Par
CONSTRUCTION OF CONCRETE DRAIN FROM SANYASI MONDAL HOUSE TO PIYALI CANAL
Construction of Concrete Drain from Kangsabati Canal towards Purba Bhadui 97726900
PCC Road from Jia Gore Canal Pul towards Math at Melna.
Construction of PCC Road from Teesta Sub Canal to Noori Madrasa
Construction of concrete road from Neul Ghoshs house towards canal par
Construction of Drain from Satya Mukherjee House to Canal at Lapur
CONSTRUCTION OF PUCCA DRAIN FROM HAFIZ HOUSE TO CANAL AT SARISAGORE
CONSTRUCTION OF PILLING FROM MAHESHDHARA CANAL TO KOCHON HOUSE SANSAD 11
Construction of Culvert Over Begonala Canal Near Raju Golui Agri Land
Construction of Cover drain from Sukur house to Canal at Nayagram
Construction of Drain from Chandi Kundu House to Canal at Lapur
Construction of concrete Drain from Elasai Kali Mandir culvert to canal
Construction of Concrete cover drain from Molla para Mosjid to Canal
CONSTRUCTION OF LINK CC ROAD FROM KHAN PARA POLE TOWARDS CANAL
SETTING OF SUBMERSIBLE PUMP WITH PIPE LINE AT GOPALGANJA CANAL PAR
Carrying out Bridge load test on Baghmari Bridge over Circular Canal
Extension of Pucca Canal from SSK to Narandranath Nagol at Baharkalaberia
Construction of Drain from Durku Tentultala to Canal under Durku GP
Const. of Parbedia Bypass Rasta dhalai uttar and Dakshin canal Bridge.
Repair of sruti canal from chakdogecchia kangrakhali to Sanatan Manna house
Cons of drain fr kalitola feild to canal side at moubesia
INSTALLATION OF SOLAR HIGH MAST STREET LIGHT AT BERUGRAM CANAL PAR
Construction of Drain from Faraj Molla house to Canal for SLWM
Napit More to Kangsabati Canal within Bishnupur Block. Length 3.200 km
CONSTRUCTION OF RCC BOX CULVERT AT KALITALA TO TAL PUKUR CANAL
PCC road from Laxmi Saren house towards Main canal at Mohanpur
cons of culvert near chandan ghorai over goyalapukur bazar sukrabazar canal
CONSTRUCTION COVER DRAIN FROM RATAN NAGA LAND TO CANAL AT SITAPUR.
CONSTRUCTION OF PUCCA DRAIN FROM LAYEP TO CANAL AT BAWSAHAR SOUTH
Construction of Drainage system from Dipak Samanta house to Bahirkunja Canal
PCC ROAD WITH DRAIN FROM CANAL TO ABBAS SUBMERSSIBLE AT SHIMULIA.
CONSTRUCTION OF CONCRETE ROAD FROM MEKHERPUKUR TO CANAL PUR 0.610 KM
Construction of conc.drain from Primary School to Canal per at Radhamohonpur
Pucca drain from Nasiruddin to Ajijul house via canal at Bahara
Construction of Concrete Road from Canal Par to Pradip Mahana House