Loading…
Loading…
17,230 results • Best match
Construction of concrete road from sitala mandir to canal at chholaberia
Repair of bridge over Kamina Canal at Malla Para at Hirapur
Construction of Covered Drain from Haru Santras House to Palpara Canal
Construction of Drain from Madhu Bhuiya House Ayengar Canal at Dhulyapur
CONSTRUCTION OF CONCRETE CANAL AT SAHEBGANJ HAT WITHIN SAHEBGANJ GRAM PANCHAYAT
Charulipukurpar to 10No Canal Par. within Nanoor Block. Length- 3.254 km
Construction Concrete road from Kapasda Junior High School of Canal Par
Concrete drainage work of Kultikri Madhya Tapasili Sangha to Mahadeb Canal
Construction of conc.drain from Primary School to Canal per at Radhamohonpur
Construction of CC Road from Canal Par to Dharmarajtala at Banskopa
Construction of Cover drain from samar Sardar house to Panchananda Canal
Const. of drain with culvert from Raghunath Sayer outlet to canal
Construction of drainage system from Judhistir Pramanik house to main Canal
Construction of Lining Canal from Nischinta Jonka Pond to Bujh Danga
Const of Cover drain from Gour Pramanick house to Patkelghata canal
Construction of pucca drain from Jaruli to canal parh at Gokulmothura
Construction of c.c.road of mahanpur canal to Adibasipara of Dubra G.P.
Construction of Work shed at Bahadurpur Canal Par under Eral GP
Construction of Drain from Rajrajeswari Kalimandir to Canal at Singhati Samsad
CONSTRUCTION OF DRAIN HOROA KHAL FISH MARKET TO CANAL PS 69
Mulluk Canal to Jibta Kali Temple within Kotulpur Block. Length 1.700km
Construction of Canal from Abdut dandapat house to Shashanka Dandapat house
Construction of Concrete Road from Phatechak Canal to Masjid at Fatechak
CONST OF DRAIN II NO CANAL TO MARAL BANDH AT KHARIGERIA
REPAIRING OF ROAD FROM DESHBANDH PAR TOWARDS CANAL PAR (1.1 KM)
One time cleaning of Drain or Canal Jorapani River within SMC
One time cleaning of Drain or Canal Fuleswari river within SMC
T-Construction of Pucca Drain from Miya Molla house to Canal
Installation Of Solar Submershible for irrigation at East Katla, Jl No 43, Dag No -1596, Khatiyan No 2755, Under Samjhia Gram Panchayat, In P.S. Kumarganj
I/R to damaged S/E due to high kotal from 19.08.20 to 22.08.20 at diff. Ch. in Mouza Sajnetala along river Hogal and in Mouza Ramkrishnapur along river Kartal under Basanti Irrigation Sub-Division of Joynagar Irrigation Division.
Construction of Concrete cover Drain from Canal to Amanulla Land.
M-R to Canal system of BKMC in between Ch 0.00 and Ch240.00 under Bolpur (I)Sub Division within Mayurakshi South Canals Division.
One time clearance of water hyacinth, jungles and deposition in canal bed (A)Lilua bandh to Damodar Canal via sen Market (approx lenght 2.2 km and width 3.5m) (B)Bidhan nagar to Damodar Canal via Satyajit park (approx length 2.0 km and width 3.5 m) (
Maintenance of Canal-B by cleaning and removing water hyacinth, green vegetations and other waste materials from the canal beds from eastern part of STP-IIB and Peripheral canal beside EWS upto calvert of STP at AA-IIB to St. No. 587Ch. 0.00 to 1950.
Operation of canal regulator gate (Cross and head regulator of canal) of canal gates of RBMC (CH-2276.00 TO CH-2527.00 ) ,W/C - CH-2385.00 of RBMC ,Offtake of Dy-14 during Kharrif Irrigation-2024 under Uchalan-I (I) Section of Seharabazar Irrigation
M/R to main canal in Ch. 0.00 to Ch. 11.00 clearing jungles from canal and removing of silt and Ch. 98.00 Ch. 99.00 strengthening of canal bank of Sankha Irrigation Scheme of AE I under Purulia Irrigation Division during 2023-24
Operation and maintenance of regulator s gates for Kharif Irrigation for the year of 2025-26 of the Head Regulator gate of Salbundh Main Canal, Mole Bundh Feeder Canal, L.B.M.C. an R.B.M.C. of Bhara Khal Irrigation Scheme and Harinamuri Main Canal of
M/R to the Branch of 4-Main canal named by E-canal (4.80 km) , F-canal (4.80 km), G canal (5.90km), H canal (10.00 km) , 4-I canal (6.00 km) 4-I-1 canal (8.00 km.), 4-I-2 canal (8.00 km), Jamna canal (4.00 km) of Khariff Irrigation 2020
MR of Canal Lining In between Ch. 90.00 to Ch. 92.00RS, patch repairing of lining in between ch. 95.00 to Ch. 109.00 of IMC for khariff Irrigation under K.C.Sub-division No-V under Kangsabati Canals Division No- II under SDS during F.Y.2023-24
MR to for canals Khariff Rabi Irrigation 2025-26 in between Ch.5.00 Ch.20.00 and Ch.30.00 Ch.50.00 of Main Canal of Chamkhara MIS of persola Section Under K.C.Sub-Division No.-III of K.C.Division No.-II in Block Ps- Simlapal Dist-Bankura
Urgent maintenance of Canal Lining including Strengthening of Embankment in between ch. 47.00 to ch. 50.00 of Dy.- 7 of IMC for Rabi Irrigation under SDS M of K.C. Sub-Division No.-V under Kangsabati Canals Division No.-II during the F.Y.-2025-26
Improvement of No.6 Main Canal i.e 6MC from 0.00km to 38.10km incldg allitsappurtenant canals within the reach.Pack-IRR-10 L3-Improvement of 6MC from 28.65Km to 38.10Km and 6LMC from 0.00Km to 6.09Km incldng allitsappurtenant canals withinthe reach.
Restoration of Canal bank in between Ch. 94.00 to Ch.115.00 of Dy. No.-10AL TSMC N including Jungle Cutting of K.C.Sub- Division No. XIII Bamda Jhagram under Kangsabati Canals Division No. V Jhargram under Kangsabati Canals Division No
Pre-monsoon clearance of Tarafeni South Main Canal(South) by removing Water Hyacinth/ water weeds/ bushes/ jungles in between Ch. 1018.00 to Ch. 1048.00 of TSMC(S) of Kangsabati Canals Sub-Division- XV under Kangsabati Canals Division No-IV
Improvement of Lower reach of RBMC from 50.84Kmto85.31Km including all its appurtenant canals within the reach IRR-01.L-3-Improvement of Lower reach of Right Bank Main Canal from79.92Km to85.31Km including all its appurtenant canals within the reach.
MR to Dam Lbmc Dy 1 Rbmc and Rbmc dy1 to maintain spontaneous flow of water through the canals in cw Turga irrigation scheme under Purulia irrigation division at Block and PS Baghmundi Dist Purulia
IPM works to the 1D canal of 1Main canal 1D canal 8.3Km D1 of 1D Branch Canal 5.7 km Sankahabahini Canal 5 km and Gokulpur SubBranch Canal 3kmand Old D Canal 2 km for Khariff Irrigation 2025 in BlockKharagpur II P.SKharagpur, Dist Paschim Medinipur
REPAIRING OF POT HOLES AND DEPRESSION AT CANAL EAST ROAD FROM NARKELDANGA MAIN ROAD CROSSING TO 1 NO KABI SUKANTA SARANI UNDER BR -III
Emergent restoration of aquaeduct at ch. 155.00 of Dy-6/2/1/ BNMC under Lohapur (I) Section of Nalhati Sub-Division under Mayurakshi North Canals Division during the year 2024-25.
Repairing and maintanace of existing toilet alongwith augmentation of wash room facilities for office staff of K.C.D.-I and attached Sub-Division under Kangsabati Canals Division No-I, Amlagora, Paschim Medinipur.