Loading…
Loading…
3,935 results • Best match
Construction Testing and Commissioning of SSFP 01 No. 1000GPH Capacity, 04 Nos. 500GPH Capacity and Chain Link Fencing Around the Structure at Spots of WSS Pershulla A under Jal Jeevan Mission (JKSSR 2020)
Construction, Testing and Successful Commissioning of Slow Sand Filtration Plants/Filtration Gallery and Chain Link Fencing Around the Structure at Spots of Water Supply Scheme Punekhar Malwana under Jal Jeevan Mission (JKSSR 2020)
Construction, Testing and Successful commissioning of Filtration Gallery 04 No. of 1000 GPH Capacity and Chain Link Fencing Around the structure at Spots of Water Supply Scheme Kandhote Lift under Jal Jeevan Mission
L/F, Construction of SR and Sluice chamber for WSS bennard under JJM
Creation of 100 KVA Distribution Sub Stations along with Laying of HT Line on turnkey basis at various locations of Block Bishnah for PHE installations under Jal Jeevan Mission within the jurisdiction of Electric Division Vijaypur, JPDCL Jammu
PHE for Jal Jeevan Mission JJM on turnkey basis in jurisdiction of Electric Division JPDCL Reasi
Creation of 100 KVA Distribution Sub Stations along with Laying of HT Line on turnkey basis at various locations of Sub Division Vijaypur for PHE installations under Jal Jeevan Mission within the jurisdiction of Electric Division Vijaypur, Jammu
Construction of Chain link fencing ,Chowkidar Quarter for WSS Darigund under JJM Part 2nd
L/F, Construction of 0.45 lac gallons RCC SR . Sluice Chamber , Chainlink fencing, and Gang Hut for WSSS Wopzan Hayar under JJM
Design, Construction, Testing and Successful Commissioning of 02 Nos. Slow SSFP 500GPH Cap. 02 Nos. SSFP 1000GPH Cap. and Chain Link Fencing Around the Structure at Spots of WSS Ranika under Jal Jeevan Mission
Construction Testing and Commissioning of Slow Sand Filtration Plant/Filtration Gallery 01 No. 1000GPH Capacity and Chain Link Fencing Around the Structure at Spot of WSS Bari Ghat under Jal Jeevan Mission (JKSSR 2020)
Construction Testing and Successful Commissioning of 02 No. RCC Ground Service Reservoir 5000 Gallon Capacity and Laying fitting of GI/HDPE Pipes for Gravity main of WSS Manjmi under Jal Jeevan Mission (JKSSR 2020)
Construction, Testing and Commissioning of SSFP 01 No. 2000GPH Cap., 01 No. 1000GPH Cap. 01 No. 500GPH Cap. and Chain Link Fencing Around the Structure at Spots of WSS Manjmi under Jal Jeevan Mission
Laying fitting of pipes and allied works including installation of FHTC for WSS AamnooArdpora under JJM
Laying and Fitting of Pipe Network for 100 percent FHTC under JJM for WSS Zurhama Kawari
L/F, Construction of SR ,PST and Sluice chamber for WSS kharpora arwani under JJM
L/f of pipes and Catch water drain for WSS Dachnipora Pahalgam under JJM programe.
Retrofitting of WSS Kanderpora Guree by way of L/F of pipes construction of 0.15 lac gallons SR, Construction of Sluice Chamber under JJM
Design, Construction, Testing and Successful Commissioning of 02 Nos. SSFP 1000GPH Capacity, 01 No. SSFP 500GPH Capacity and Chain Link Fencing Around the Structure 03 Nos. Spots of WSS Bhagratha Bhatie under Jal Jeevan Mission
Construction, Testing and Successful Commissioning of Slow Sand Filtration Plants 01 No. 2000GPH Cap. and Chain Link Fencing Around the Structure at Spot of Water Supply Scheme Hanch Malna under Jal Jeevan Mission (JKSSR 2020)
Construction Testing and Commissioning of Slow Sand Filtration Plant/Filtration Gallery 01 No. 1000GPH Capacity and Chain Link Fencing Around the Structure at Spot of WSS Thanda Pani Kotli under Jal Jeevan Mission (JKSSR 2020)
Construction Testing and Commissioning of Slow Sand Filtration Plant/Filtration Gallery 03 Nos. 1000GPH Capacity and Chain Link Fencing Around the Structure at Spot of Water Supply Scheme Gagla under Jal Jeevan Mission (JKSSR 2020)
Creation of 100 KVA Distribution Sub Stations along with Laying of HT Line on turnkey basis at various locations of Block Nud and Samba for PHE installations under Jal Jeevan Mission within the jurisdiction of Electric Division Vijaypur, JPDCL Jammu
As refer BOQ
laying /fitting of pipes, Construction of 0.20 gall0ns SR cum Sump, for WSS Damhall under JJM
L/f, Revamping of SSFP, Construction of Chowkidar Quarter for WSS Kanelwan under JJM part 2nd
Laying and fitting of pipes including installation of FHTC for water supply scheme Matibugh Dassen under JJM
Jal Shakti (PHE) for Jal Jeevan Mission (JJM) on turnkey basis in jurisdiction of Electric Division JPDCL Reasi
Creation of 100 KVA and 63 KVA Distribution Sub Station along with Laying of HT Line on turnkey basis for WSS Raghu chak and WSS Malani respectively for PHE Installations under Jal Jeevan Mission within the jurisdiction ED Vijaypur
Constt. Of pump operator quarter, Chain Link Fencing, Sluice Chamber , Laying/Fitting of Pipes WSS Peth Dialgam.under JJM
Construction Testing and Commissioning of Slow Sand Filtration Plant/Filtration Gallery 01 No. 3000GPH Capacity, 01 No. 500GPH Capacity and Chain Link Fencing Around the Structure at Spot of WSS Thatha under Jal Jeevan Mission (JKSSR 2020)
Construction Testing and Commissioning of Slow Sand Filtration Plant 01 No. 3000GPH Capacity, 01 No. 2000GPH Capacity and Chain Link Fencing Around the Structure at Spot of Water Supply Scheme Jodhpur under Jal Jeevan Mission (JKSSR 2020)
Construction, Testing and Successful Commissioning of Slow Sand Filtration Plant/Filtration Gallery 03 Nos. 1000GPH Cap. and Chain Link Fencing Around the Structure at Spot of Water Supply Scheme Ganika Malwas under Jal Jeevan Mission (JKSSR 2020)
Construction of Intake Chamber, Chain Link Fencing, D.G Shed, Chemical Storage Shed, Approach Path, Protection Wall and Laying/Fitting of Pipes For WSS Khanpora Kreei under JJM part 1st
Laying and Fitting of DI/GI Pipe Network for 100 percent FHTC under JJM for WSS Trehgam Doolipora
Laying and Fitting of DI/GI Pipe Network for 100 Percent FHTC under JJM for WSS Reshigund Kralpora
Retrofitting of WSS Ganaipora Khandaypora including laying/ fitting of pipes, Construction of SR, Sluice chambers, SSF Plant under JJM
Construction and Successful Commissioning of 0.20 Lac Lac Gallons Service Reservoirs WSS Dardpora Chontihal Watkhash Part 2nd UNDER JJM
Design,Construction, Testing and Commissioning of 5000 GPH Slow Sand Filtration Plant (depending on safe bearing capacity), along with other allied works in Jal Shakti (PHE) Division Reasi of District Reasi of Jammu Province under Jal Jeevan Mission
L/F of pipes, const. of 0.15 lac gallons SR, Const. of 0.20 lac gallons capacity RCC SSFP, Const. of Chain link fencing around various structures for WSS Ladi under JJM
Construction of 20000 Glns cap. OHT at Simblana Pathwal under JJM
Retro fitting of WSS Kamnivan including Laying/ fitting of pipes, Construction of SR , Sluice Chambers and Chain Link Fencing under JJM
/F, Construction of 0.10 lac gallons SR ,intake chamber , Sluice chamber and chain link fencing for WSS Wallerhama jarpati under JJM
Laying/Fitting of pipes , Construction of 0.10 lac gallons Sump, Construction of 0.10 lac gallons SR WSS Hallen GB under JJM
work of Jal Shakti (PHE) for Jal Jeevan Mission (JJM) on turnkey basis in jurisdiction of Electric Division JPDCL Reasi
Construction of 250 mm Dia. Production Tube Wells by any suitable method (Reverse/Direct/Dual Rotary) using Mud-Rotary Drilling Rig for 01Water Supply Scheme (01 no. Tube well) of District Jammu of JAMMU Province under Jal Jeevan Mission
Construction Testing and Commissioning of Slow Sand Filtration Plant/Filtration Gallery 01 No. 2000GPH Capacity, 04 Nos. 500GPH Capacity and Chain Link Fencing Around the Structure at 05 Spots of WSS Pershulla B under Jal Jeevan Mission. (JKSSR 2020)
L/F, Construction of Sluice chamber, 0.35 lac gallons Sump, Chowkidar quarter and chain link fencing for WSS Hassanpora Bagh under JJM
Retrofitting of WSS Khatana Basti by way of L/F pipes, Chain link fencing around SR and pump operator Quarter under JJM.
L/F, Construction of 0.10 lac gallons RCC SR, Chowkidar Quarter/ Pump operator quarter and chainlink fencing for WSS Benard under JJM