Loading…
Loading…
53 live14 closing this weekmost from PHE
53 results • Best match
Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) at Paschim Bhagabanpur Water Supply Scheme under Chanchal-I Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission under command area of Pannapur Piped Water Supply Scheme of Habibpur Block under Malda Division, PHE Dte. in the district of Malda.
Additional laying of Pipe line for improvement of FHTC functionality by UPVC pipe, Providing Functional Household Tap Connection (FHTC) for KANTHALANPUR piped Water Supply Scheme at Habibpur Dev. Block in the District of Malda under Malda Division,
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe,Providing Functional Household Tap Connection (FHTC) , Boundary wall,Aproach Raod at HW and 2nd TW site in for JIGIN piped Water Supply Scheme of Gazole
Construction of Boundary wall of 2nd Tube Well Site,Road restoration, Rectification of FHTC and Installation of Functional Household Tap Connection of JATRADANGA Piped Water Supply Scheme at Old Malda Dev. Block in the District Malda under Malda Divi
Trial run for operating distribution system including FHTC at Zone-18 within RCFA Part-II under RCFA Division-I PHE Dte. (w.e.f. 01.10.2026 to 31.03.2027)
Laying of Distribution pipe line Under JJM for Dalkati and Its Adjoining Mouzas PWSS in JHARGRAM Block under Jhargram Division, PHE Dte.
Providing FHTC at left out portion within command area of Dendua OHR Site under RCFA Part-I W/S Scheme under RCFA Division-I PHE Dte.
Laying of distribution system including FHTC work at Churulia and Diguli and its adjoining areas under Augmentation of Birudiha Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Laying of distribution system including FHTC work at Baguli, and Anandapur and its adjoining areas under Augmentation of Birudiha Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Trial run for operating distribution system regulating different valve including FHTC at Ramnagar, Harishadihi, Vidyanagar, Anchra (Bouripara, Schoolpara Achra village) and adjacent area within Salanpur Block under RCFA Division-I PHE Dte.
Annual Operation and Maintenance including Gardening of Alinagar OHR and valve operation at Alinagar Nimsa and Chattrishganda including FHTC under Shyamla W/S Scheme under RCFA Division-I PHE Dte. (Nine months)
Laying of distribution system including FHTC work at Churulia, Diguli, Baguli, Anandapur and Rakhakura village and its adjoining areas under Augmentation of Birudiha Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Trail run for operating distribution system by regulating different valve including FHTC over 250 mm dia pipe line distribution network at Bonjemari Colliery area under RCFA Division-I PHE Dte. (w.e.f. 01.10.2026 to 31.03.2027)
Repairing of distribution line, laying of HDPE pipe line, repairing of FHTC at Kalikamali village, Narayanpur village, Jamjuri village, Kashidanga village, Khayerbani village and Jamgram village under Jamgram PWSS under Barabani Block in the District
Emergent restoration of existing FHTC along with pipe line and other allied works in connection with retrofitting work at different places in connection with augmentation of Sandeshkhali w/s scheme, Sdk-II block under Hasnasbad Sub-Divn, P.H.E.Dte.
Providing of Balance FHTC and restoration of damaged FHTC at Different AWC under BHATAR Block under Durgapur Sub Division under Burdwan Division. PHE Dte. (Project ID PH212239978S000)
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe, Providing FHTC for DUBA KHOSKAN piped Water Supply Scheme at Gazole Block in the District of Malda under Malda Division, P.H.E.Dte. (2nd Call)
Rectification or repairing of existing FHTC connection from /Each C.I./D.I./UPVC/HDPE/G.I./A.C. distribution pipeline with labour cost for cutting trench (1m X 0.9m X 1.2m,installation of Sluice valve for functional 571 FHTC under Malipakor Water
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe and Providing FHTC for DUBA KHOSKAN piped Water Supply Scheme at Gazole Block in the District of Malda under Malda Division, P.H.E.Dte. (3rd Call)
Rectification or repairing of existing FHTC connection from /Each C.I./D.I./UPVC/HDPE/G.I./A.C. distribution pipeline with labour cost for cutting trench (1m X 0.9m X 1.2m to Functional 1050 nos FHTC under Daulatnagar Water Supply Scheme at Harishcha
Rectification or repairing of existing FHTC connection from /Each C.I./D.I./UPVC/HDPE/G.I./A.C. distribution pipeline with labour cost for cutting trench (1m X 0.9m X 1.2m for fuctional 508 nos FHTC under Bhairabpur Water Supply Scheme at Harishchand
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe an providing FHTC and Construction of Boundary Wall, Earth filling and Approach road at 3rd and 4th Tubewell Site for Kadirpur PWSS in Habibpur Dev. Block
Operation Maintenance of distribution system including rising main, FHTC, OHR of Thakuachak-I II W/S Scheme
Relaying of Pipeline and Refixing of FHTC alongside Irrigation Bundh under PALASHPAI PWSS under ARAMBAGH Block, District- Hooghly
Providing FHTC for Kharangapur Jabra PWSS at Harishchandrapur-I Block under Malda Division, PHE Dte, Govt. of West Bengal.
Repairing of UPVC pipe line with reconnection of FHTC and allied work at Ramnapara Water Supply Scheme within Bhagwangola-II
Providing Blance FHTC at Bhatakul piped Water supply Scheme under Durgapur Sub-Division under Burdwan Division, P.H.E.DTE. Block Bhatar, Dist.- Purba Bardhaman.
Providing FHTC and land development of Khurul Piped Water Supply Scheme under Bhatar Block, of Durgapur Sub Division Under Burdwan Division. (SM/13549)
Construction of Pump house , Land Development work , Road Restoration, Remaining FHTC at Bhatakul Piped Water Supply Scheme , P.H.E Dte. Block-Bhatar,Dist Purba Bardhaman.
Providing 15 Nos FHTC and laying of HDPE and UPVC pipe line for village of Dhanyakherur Majhergram PWSS for SAJAL GRAM of Manteswer Block under Burdwan Division.PHE Dte.
Laying of distribution pipe line for functional FHTC under Malipakar Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Providing balance FHTC and laying of HDPE pipe line along with approach raod and other ancillary works for Mandardihi PWSS of Bhatar Block under Burdwan Division.PHE Dte. (SM/14052)
Providing 48 Nos FHTC and laying of HDPE and UPVC pipe line for village of Shigram of Majhergram PWSS for SAJAL GRAM of Manteswer Block under Burdwan Division.PHE Dte.
Providing 48 Nos FHTC and laying of HDPE and UPVC pipe line for village of Majhergram of Majhergram PWSS for SAJAL GRAM of Manteswer Block under Burdwan Division.PHE Dte.
Laying of Dedicated /Parallel and Providing Balance FHTC of DAKSHIN BHAKURIA Piped Water Supply Scheme at Harishchandrapur-II Dev. Block in the District of MaldaunderMalda Division, PHE Dte. (2nd Call).
Restoration of Concrete Road ,Providing F.H.T.C. at Karjjana piped water supply scheme of JJM in Bhatar Block , District Purba Bardhaman, Durgapur Sub Division under Burdwan Division, P.H.E. Dte.
Day to day Operation and Maintenance of Distribution system and Rising main pipe line (CI / DI / UPVC/HDPE/FHTC) and allied works of SELAMATPUR Piped Water Supply Scheme within Murshidabad-Jiaganj
CI/DI/HDPE Pipeline at Domjur (Zone-4) Dakshin Jhapardaha (Zone-I) PWSS For Providing FHTC as per approved design and drawing under Howrah Sadar Sub-Division, Howrah Division, PHE Dte.
Day to day Operation and Maintenance of Distribution system and Rising main pipe line (CI / DI / UPVC/HDPE/FHTC) and allied works of BALI ZONE - III Piped Water Supply Scheme within NAWDA
Dedicated Pipe laying for better Functionality and Providing Balance FHTC for MAHIL Water Supply Scheme at Gazole Block of Malda district under Malda Division, PHE Dte. Govt. of West Bengal, (3rd Call)
Day to day Operation and Maintenance of Distribution system and Rising main pipe line (CI / DI / UPVC / HDPE /FHTC) and allied works of RAMNACHANDPUR ZONE - II (Part - B) Piped Water Supply Scheme within NAWDA
Restoration of pipeline, Providing sluice valve, Painting and minor repairing of Switch room, Clearing compound premises ,Remaining FHTC, making temporary earthen road and repairing of old valve chamber of Orgram Zone-II Piped water supply Scheme ,
Emergent shifting of UPVC distribution pipe line and FHTC due to widening of WBSRDA road from Tushkhali ghat to Atapur Kenaram High School within Tushkhali water supply scheme, Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte.
Additional Laying of distribution Network System and Secondary rider main for DAKSHIN RAJAPUR PWSS, Block-Bhangar-I, Dist-South 24 Parganas to accommodate FHTC in Bhangar-I Block under South 24-Partganas, W/S Division-I, P.H.E. Dte.
Day to day Operation and Maintenance of Distribution system and Rising main pipeline (CI / DI / UPVC / HDPE /FHTC) and allied works, including Arsenic cum Iron Removal Plant of Modified Sujapur Sadipur Model (Capacity - 30.00 CuM/Hr) of MOKTARPUR P
Providing FHTC, Laying of the balance portion of uPVC pipeline and parallel pipeline, supplying of Sluice Valves and DI specials including 3 months trial run for Nabinagar Piped W/S Scheme at Kaliachak-I Block under MAAD (2nd Call).
Construction Approach Road, Internal Road, Land Development at Head Work, 2nd Tube well Site, Laying of Parallel/Dedicated Pipeline and Providing Balance FHTC of NASIPUR PWSS under Ratua-II Block under Malda Division, PHE Dte, Govt. of West Bengal.
Rectification or repairing of existing FHTC connection from /Each C.I./D.I./UPVC/HDPE/G.I./A.C. distribution pipeline with labour cost for cutting trench (1m X 0.9m X 1.2m for functional 135 nos and Installation of Sluice Valve under Talsur Water Sup
Laying Distribution pipeline at Augmentation of Bamunhati Piped Water Supply Scheme (Part E LDS FHTC of Northern Part of Palera Village) along with Road Restoration in Uluberia-II Block under Uluberia Sub-Division of Howrah Division, P. H. E. Dte.