Loading…
Loading…
3,935 results • Best match
L/F Testing, Successful Commissioning of GI/HDPE Pipes for G/main, Sub main, D/System of different Nominal Bores alongwith pipe fittings and control valves incl. other allied works and Constt. of Civil Structures etc. for WSS Dessa C under JJM
Design, Constt., Testing and Successful Commissioning of SSFP, CLF Around the Structure at Spots, civil structures and allied works and L/F of GI/HDPE Pipes for G/main, S/main, D/System of WSS Rokali Lift, Binola Sunarthawa, Drab Chobia under JJM
Construction of 04 Nos. Pump Room Building, 08 Nos. 10000 Glns GSR/ Sump Tank, 02 Nos. Cleaning of Dug wells, 01 No. Improvement of Pump room building, 02 Nos. Boundary wall and pipe laying and allied works under WSS Pacholi under JJM
Construction of 2 No 10000 Gln GSR, Construction of 2 No 5000 Gln GSR ,01 No. collection tank , 4 Nos. spring cover ,01 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Drari (JJM).
Construction of 3 No 20000 Gln GSR, Construction of 3 No 10000 Gln GSR ,2 Nos Pump Room, 2 Nos. spring cover ,02 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Lower Sawani (JJM).
Construction of 8 No 20000 Gln GSR, Construction of 2 No 10000 Gln GSR ,03 Nos Pump Room, 03 No. compound wall, 01 No. protection work , Spring cover 13 Nos. Laying and Fitting Rising Main and Distribution system under WSS Ghambir Mughlan (JJM).
Construction of 4 No 20000 Gln GSR ,Construction of 2 No 5000 Gln GSR, ,2 Nos Pump Room, 02 No. spring cover . 02 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Loorkote (JJM).
Providing, supplying, laying of various dias of HDPE pipes and L/F of DI/GI pipes for mains/ sub mains/ distribution network and Construction of Anchor / saddle blocks and R/walls along naked portion of pipe line for upgradation ETC ETC UNDER JJM
Construction of 2 No 10,000 Gln GSR/Sump Tank, 2 No 20,000 Gln GSR/Sump Tank, 1 No 30,000 Gln GSR/Sump Tank, 1 No pump room, 180 mtr boundary wall, Laying and Fitting Rising Main and Distribution system under WSS Metka (JJM).
L/F Testing, Successful Commissioning of GI Pipes for G/main, Sub main, D/System of different Nominal Bores alongwith pipe fittings and control valves incl. other allied works and Constt. of Civil Structures etc. for WSS Gundna Malwana East under JJM
L/F Testing and Successful Commissioning of GI Pipes for G/main, Sub main and D/System of different Nominal Bores along with pipe fittings and control valves incl. other allied works and Constt. of Civil Structures etc. of WSS Masri under JJM
Construction of 1 No 20000 Gln GSR/Sump Tank, Construction of 4 No 10000 Gln GSR, Construction of 2 No 5000 Gln GSR , 5 Nos Pump Room, 05 No. Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Margan (JJM).
Design, Constt., Testing and Successful Commissioning of SSFP, CLF Around the Structure at Spots, civil structures and allied works and L/F of GI/HDPE Pipes for G/main, D/System of WSS Bharat Bhalal, Jijote, Dhar B, Bhakana and Bhalwana under JJM
Construction of 4 No 10000 Gln GSR, Construction of 1 No 5000 Gln GSR ,3 Nos Pump Room, 3 Nos. spring cover ,03 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Patrara (JJM)
L/F Testing, Successful Commissioning of GI/HDPE Pipes for G/main, Sub main, D/System of different Nominal Bores alongwith pipe fittings and control valves incl. other allied works and Constt. of Civil Structures etc. for WSS Gaddi B under JJM
L/F Testing, Successful Commissioning of GI/HDPE Pipes for G/main, Sub main, D/System of different Nominal Bores alongwith pipe fittings and control valves incl. other allied works and Constt. of Civil Structures etc. for WSS Gaddi A under JJM
Construction of machine room cum operators quarter at WSS Zazna-II nd Batwina, RCC jacketing to Pre-settling tank, revamping of filtration plant at WSS Kondbal, Sluice chambers at OHT/SR site and WC/Bathroom near pump station for augmentation etc JJM
Construction of 01 No. Storage Tank, 08 No. Anchor Blocks, 100 No. Thrust Blocks, Steel Rope crossing, Protection Work and Laying Fitting of GI/HDPE Pipes in Gravity main, Sub main and Distribution Systems of Water Supply Scheme Koti Basti under JJM
Creation of 4X63 KVA 1X 100 KVA Sub station alongwith erection of 11 KV Line on 9 mtr. long ST poles, 30mm Sq ACSR weasel conductor LT line on 8 mtr. ST pole at WSS Malli Pangara under JJM on turnkey basis
Creation of 2 Nos. 100 KVA Sub Stn alongwith HT LT line at Juthana Lower A Tadwal and Mailly under water supply Scheme JJM PHE in respect of Electric Sub-Division Kathua of Electric Division Kathua on Turnkey Basis
ELECTRO-MECHANICAL WORKS AT WSS GUNDBAL ANDROOSA (ANDROOSA PART) UNDER JJM
Construction of 02 Nos. Pump Room Building, 01 No. 10000 Glns GSR/ Sump Tank, 01 No. 20000 Glns GSR/Sump Tank, 01 No. Strengthening of existing 20000 Glns cap. GSR, 01 No. Boundary wall and pipe laying and allied works under WSS Gurah (JJM)
Supply, Erection, Testing, Commissioning for Creation of 100 KVA Sub-Station, laying of HT Line on 9 Mtr Long ST Pole on weasel conductor, laying of LT Line 3 phase 4 wire under JJM at proposed dug well site WSS Baggey Samral Jhajjar Nallah
Creation of 1X250 and 4X100 KVA S.Stn. along with HT/LT line at WSS 250 KVA Potha (A), 100 KVA Potha (B), 100 KVA Upper Hissabwali Dhara Morha (A), Upper Hissabwali Dhara Morha (B) and 100 KVA Nandali Chaprian Eidgah under JJM-2023-24
Creation of 4X100 KVA S.Stn. along with HT/LT line at WSS 100 KVA Dabriban Thalyan Near Thalyan Masjid (A), 100 KVA Near Khokran SolDhara Source (B), 100 KVA Near Upstream side bridge Sadwala road (C) and Near 1st Stage chowki Makasi (D) under JJM-
Creation of 3X100 KVA S.Stn. along with HT/LT line at WSS Sarwalla Gama Kangra 100 KVA Base Stage Lower Kangra Near Pyt. Ghar (A), At Base Stage down stream of Mohalla Malkan (B) and At 1st Stage Kari Top (C) under JJM-2023-24
Construction of 2 No 20000 Gln GSR/Sump Tank, Construction of 3 No 10000 Gln GSR, 2 Nos Pump Room, 02 Nos. Compound wall, Fencing and sign board,01 No. protection work, Laying and Fitting Rising Main and Distribution system under WSS Badhoon-A (JJM).
Construction of 1 No 20000 Gln GSR/Sump Tank, Construction of 3 No 10000 Gln GSR, 2 Nos Pump Room, 02 Nos. Compound wall, 01 No. Protection work, 01 No. Rope crossing Laying and Fitting Rising Main and Distribution system under WSS Charhan (JJM).
Construction of 2 No 5,000 Gln GSR/Sump Tank, 4 No 10,000 Gln GSR/Sump Tank, 3 No 20,000 Gln GSR/Sump Tank, 2 No pump room, 280 mtr boundary wall, Laying and Fitting Rising Main and Distribution system under WSS Upper Bhajwal-A (JJM).
Construction of 5 No 20000 Gln GSR/Sump Tank, Construction of 3 No 10000 Gln GSR, 4 Nos Pump Room, 04 Nos. Compound wall, 1 No collection, 3 No spring covering Laying and Fitting Rising Main and Distribution system under WSS Panjgrain-II (JJM).
Construction of 1 No 20000 Gln GSR, Construction of 3 No 10000 Gln GSR ,03 No. collection tank, 01 Nos Pump Room, 01 No. compound wall, 03 No. spring cover Laying and Fitting Rising Main and Distribution system under WSS Bari Darhal-B (JJM).
Construction of 1 No 5,000 Gln GSR/Sump Tank, 2 No 10,000 Gln GSR/Sump Tank, 3 No 20,000 Gln GSR/Sump Tank, 1 No pump room, 180 mtr boundary wall, Laying and Fitting Rising Main and Distribution system under WSS Hathal A (JJM).
Construction of 1 No 5,000 Gln GSR/Sump Tank, 2 No 10,000 Gln GSR/Sump Tank, 3 No 20,000 Gln GSR/Sump Tank, 1 No pump room, 180 mtr boundary wall, Laying and Fitting Rising Main and Distribution system under WSS Hathal A (JJM).
Constt., Testing and Successful Comm. of SSFP 01 No. 5000GPH, 01 No. 3000GPH, 01 No. 2000GPH, 07 Nos. 1000GPH, 05 Nos. 500GPH, and CLF 15 Nos. at Spots of WSS Bari Ghat, Thatha, Gagla, Beoli, Abli Masri, Pershulla B and Thanda Pani Kotli under JJM
Construction of 3 No 10000 Gln GSR, Construction of 7 No 5000 Gln GSR ,3 Nos Pump Room, 07 Nos. collection tank , 9 Nos. spring cover ,02 No. Fencing and sign board, Laying and Fitting Rising Main and Distribution system under WSS Panglar (JJM).
Construction of 6 No 10000 Gln GSR/Sump Tank, Construction of 2 No 5000 Gln GSR/Sump Tank , 02 No. Fencing, 02 No. spring cover, 04 No. Collection Tank, 02 No. Pump Room Laying and Fitting Rising Main and Distribution system under WSS Kanthol (JJM).
Please refer BOQ
Please refer BOQ
Please refer BOQ
Please refer BOQ
SELECTION ENGAGEMENT OF AGENCIES FOR CARRYING OUT THE SUPPORT ACTIVITIES OF JJM
Providing Drinking water supply to 03 No. Schools (Bhalwal Zone) under JJM.
Creation of 7X100 KVA S.Stn. along with HT/LT line at WSS Kojra Bandichechian 100 KVA Kojra Base, 100 KVA Kojra Stage 1st, 100 KVA Kamal Dheri 2nd, 100 KVA Bandichechian Bae, 100 KVA Saria, 100 KVA Chirhwalal and 100 KVA Khuthar under JJM-2023-24
Constt., Testing and Commissioning of 03 Nos. Storage Tank, 02 Nos. Sed. Tank, RCC GSR 01 No. 5000Gln Cap., 01 No. 3000Gln Cap. and Providing Laying and fixing of GI/HDPE Pipes in Sub Main and D/Systems of WSS Ludna under NRDWP/JJM (JKSSR 2012)
Creation of 4X100 KVA S.Stn. along with HT/LT line at WSS Saifadan Charangri 100 KVA Bore well Moh. Peeran Bhatakass (A), 100 KVA 1st Stage Near Safidan (B), 100 KVA 1st Stage Kurla (C) and 100 KVA Top Stage Topa (D) under JJM-2023-24
CREATION OF SUBSTATION WITH HTLT FOR WSS 1X100 KVA S/STN FOR RSFP WSS DHARAMSAL, 1X100 KVA S/STN FOR WSS KATWARI, 1X100 KVA S/STN FOR RSFP WSS KOTE KABU KARALKASS, 1X 250 KVA S/STN FOR WSS DOKHARDI POTAGALA IN SD RAJOURI-II UNDER JJM.
Creation of 5X100 KVA S.Stn. along with HT/LT line at WSS Barooi Chowki 100 Near Sheep Form, Kamair Hasab Ghai Kathyali 100 KVA Base Stage Kathyali, 100 KVA 1st Stage Kathyali, Balnoi 100 KVA Maidan Balnoi (A) and 100 KVA Nar Balnoi (B) under JJM-2
CONSTRUCTION OF 3 NOS 10000 GLNS GROUND SERVICE RESERVOIR FOR WSS KaRLAH JJM
Construction of 250 mm Dia. Production Tube wells in District Kathua under JJM