Loading…
Loading…
16,802 results • Best match
BARADOBA Piped Water Supply Scheme with FHTC ,Road restoration under AUSGRAM-II Block,
Providing FHTC at surrounding area of Chhoto Salkumar Under Alipurduar Division, PHE DTE.
Providing FHTC of Uttar Kamakhyaguri WSS under Alipurduar Division, PHE Dte. (Part-4)
Sl.No..06..FHTC..KPaschim Salbari piped Water Supply Scheme Zone- I (Phase-II)
Retrofitting to accommodate FHTC 150 nos under JJM in Dariapur PWSS(PHASE -II)
Retrofitting to accommodate FHTC 181 nos. under JJM in ASTICHAK PWSS. PART - 1B
Retrofitting to accommodate FHTC 126 nos. under JJM in ASTICHAK PWSS PART - 2B
Retrofitting to accommodate FHTC 206 nos under JJM in Barasubarnanagar PWSS(PHASE -II)
Retrofitting to accommodate FHTC under JJM in Chaita_Phase_II under Midnapore Division PHE Dte.
(SL. No. 02)
(SL No. 06)
Balance work of sinking of tube well,laying distribution of pipeline,pump house,boundary wall, interconnection and FHTC for augmentation of Anandapur Sundarpur Pwss in Ghatal Block within Ghatal Sub Division under Midnapore Division P.H.E Dte
Water Quality Monitoring through On-site Mobile Analysis System (OMAS) testing in Untouched Habitations, Schools, Anganwadis, Health Facilities throughout the State related to Water Quality Monitoring and Surveillance under Jal Jeevan Mission
Engagement of one consulting agency for Setting up of District Project Management Units (DPMU) at Aliporedure, Coochbehar, Jalpaiguri, Darjeeling Kalimpong, Uttar Dinajpur and Daskin Dinajpur districts under Jal Jeevan Mission Jal Swapna.
Temporary Restoration Work due to laying of Water Supply Pipelines along Bonpass Village (Kamarpara) to Bonpass Rly. Station Rd. by PHE Dte. under JAL JEEVAN MISSION under Burdwan Division, P.W.D. (AMRUT SCHEME)
Construction of Boundary wall at 2nd 3rd Tube Well Site of ANDULBERIYA ZONE -I PWSS under Jal Jeevan Mission within Beldanga-II Block under Berhampore Division -I, PHE.Dte.in the district of Murshidabad.
Repairing of DI Rising main (K-9) including laying of Parallel line at Jiudaru Mouza under Kotshila Water Supply Scheme in Connection with Jal-Jeevan Mission Works at Purulia Division ,PHE Dte .
Construction of Blower Room, Iron Elemination Plant, Boundary Wall at Kalam Piped Water Supply Scheme under Matigara block, Darjeeling district in connection with Jal Jeevan Mission under Siliguri Sub Division, P.H.E. Dte
Providing and installation of pumping machineries and other electromechanical accessories for Augmentation for Pathardoba Zone-B and adjoining mouzas under Simlapal water supply scheme (BRGF Ph-I) under Jal Jeevan Mission progremme
Providing Functional House Hold Tap Connection along with platform under Jal Jeevan Mission for Kalkut Piped Water Supply Scheme Zone-II within Matigara Block under Siliguri Sub Division, P.H.E. Dte. Part-D.
Construction of Boundary Wall ,Foot Path,Drain,pipeline for washout at 2nd site BARAPATINA NATUNBUS ZONE -II PWSS in connection with Jal Jeevan Mission at Block - Sadar Block under Jalpaiguri Division, P.H.E.Dte.
Construction of Service Road extension of boundary wall of Bansgara Zone-I PWSS under Jal Jeevan Mission within Raninagar-II block under Berhampore Division-I PHE Dte. in the district of Murshidabad.
Construction of Boundary Wall ,Foot Path,Drain,pipeline for washout at 2nd site BARAPATINA NATUNBUS ZONE -I PWSS in connection with Jal Jeevan Mission at Block - Sadar Block under Jalpaiguri Division, P.H.E.Dte.
Providing Functional House Hold Tap Connection along with platform under Jal Jeevan Mission for Kalkut Piped Water Supply Scheme Zone-II within Matigara Block under Siliguri Sub Division, P.H.E. Dte. Part-A.
Providing Functional House Hold Tap Connection along with platform under Jal Jeevan Mission for Kalkut Piped Water Supply Scheme Zone-II within Matigara Block under Siliguri Sub Division, P.H.E. Dte. Part-B.
Construction of Service Road for approach and Pump House at Augmentation of Hurshi New PWSS of Raninagar-I Block under Jal Jeevan Mission of Murshidabad District under Berhampore Division-I, PHE Dte.
Providing Functional House Hold Tap Connection along with platform under Jal Jeevan Mission for Kalkut Piped Water Supply Scheme Zone-II within Matigara Block under Siliguri Sub Division, P.H.E. Dte. Part-C.
Construction of Boundary Wall ,Foot Path,Drain,pipeline for washout at 2nd Tubewell site Saptibari Zone-I PWSS in connection with Jal Jeevan Mission at Block - Maynaguri Block under Jalpaiguri Division, P.H.E.Dte.
Construction Service Road for approach and Pump House at Augmentation of LOCHANPUR ZONE-II PWSS of Raninagar-I Block under Jal Jeevan Mission of Murshidabad District under Berhampore Division-I, PHE Dte.
Providing Functional House Hold Tap Connection along with platform under Jal Jeevan Mission for Kalkut Piped Water Supply Scheme Zone-II within Matigara Block under Siliguri Sub Division, P.H.E. Dte. Part-E.
Construction of Service Road for approach and Pump House at Augmentation of KAZIPARA ZONE-II PWSS of Jalangi Block under Jal Jeevan Mission of Murshidabad District under Berhampore Division-I, PHE Dte.
Repairing of DI Rising main (K-9) including laying of Parallel line at Jiudaru Mouza under Kotshila Water Supply Scheme in Connection with Jal-Jeevan Mission Works at Purulia Division ,PHE Dte .
Repairing of DI Rising main (K-9) including other allied works at Panradda Various Zone under Panradda Water Supply Scheme in Connection with Jal-Jeevan Mission Works at Purulia Division ,PHE Dte .
Augmentation of Water Supply Scheme for Kuldiha and its adjoining Mouzas under Sarenga Water Supply Scheme (BRGF Ph-I) under Jal Jeevan Mission under Khatra Sub-Division of Bankura Division, P.H.E. Dte.
Construction of Boundary Wall ,Foot Path,Drain,pipeline for washout at 2nd site of PATKATA ZONE - III PWSS in connection with Jal Jeevan Mission at Block - Sadar Block under Jalpaiguri Division, P.H.E.Dte.
Laying distribution system, rising main, construction of pump house and tubewells along with other allied works inconnection with Jal Jeevan Mission of Augmentation PURBA PASCHIM DHANTALA PWSS (Zone-II) at Rajganj Block
PProviding Functional House hold Tap Connection under Jal Jeevan Mission and Jal Swapno Programme for Fakna mouza of Birsing Piped Water Supply Scheme at Naxalbari block under Siliguri Sub Division PHE Dte
Providing Functional House Hold Tap Connection along with platform under Jal Jeevan Mission for Kalkut Piped Water Supply Scheme Zone-II within Matigara Block under Siliguri Sub Division, P.H.E. Dte. Part-F.
Providing and installation of pumping machineries and other electromechanical accessories for Augmentation for Pathardoba Zone-A and adjoining mouzas under Simlapal water supply scheme (BRGF Ph-I) under Jal Jeevan Mission progremme
Providing and installation of Voltage Stabilizer and submersible pumping machineries with other allied works for Augmentation of Sarenga water supply scheme under Jal Jeevan Mission progremme under Bankura Mechanical Division PHE Dte
Replacement of Filter media of Existing AIRP of (Capacity 126 Cum/hr.) with allied work at Kashipur Zone-I Water Supply Scheme under Jal Jeevan Mission under Berhampore Division-I, PHEengineering Dte
Construction of Pump House Cum Chlorine Room at Head Work Site of BANSGARA ZONE - II PWSS under Jal Jeevan Mission within Lalgola Block under Berhampore Division -I, PHE.Dte.in the district of Murshidabad.
Construction of Boundary Wall ,Foot Path,Drain,pipeline for washout at 2nd Tubewell site Saptibari Zone-III PWSS in connection with Jal Jeevan Mission at Block - Maynaguri Block under Jalpaiguri Division, P.H.E.Dte.
Work for revamping upgradation of the hydraulic parameters of distribution network in reference to Raynagar and Joypur WS Scheme under Nadia Arsenic Division I PHED as a part of Jal Jeevan Mission
Operation and maintenance of distribution system, rising main and allied pipelines, valves, valves chambers, stand posts including repairing of FHTC connection and providing new FHTC connection for Chhoto Sehara water supply scheme
Operation and maintenance of distribution system, rising main and allied pipelines, valves, valves chambers, stand posts including repairing of FHTC connection and providing new FHTC connection for Boyermari Abad water supply scheme
Functional House Hold Tap Connection for left out Household regarding Har Ghar Jal Certification including supply of 15 mm dia PVC pipe of required length, Saddle piece As required size, 15 mm dia Bib cock etc all complete at Vill Mukundapur Kadipur
Functional House Hold Tap Connection for left out Household regarding Har Ghar Jal Certification including supply of 15 mm dia PVC pipe of required length, Saddle piece As required size, 15 mm dia Bib cock etc all complete at Helenchi Zone-I
Functional House Hold Tap Connection for left out Household regarding Har Ghar Jal Certification including supply of 15 mm dia PVC pipe of required length, Saddle piece As required size, 15 mm dia Bib cock etc all complete at Vill Goari Gopipur