Loading…
Loading…
16,802 results • Best match
Operation and maintenance of distribution system including rising main and FHTC for Naraharipur Piped Water Supply Scheme under JJM of Sagar Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (for 366 days)
Operation and maintenance of distribution system including rising main and FHTC for Ramchandranagar Piped Water Supply Scheme under JJM of Kakdwip Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (For 366 days)
Laying distribution pipe line, Accommodate FHTC (322 nos) under JJM with allied work for Panusi its adjoining moujas PWSS in Bhagwanpur-II Block within Contai Sub-Division under Tamluk Division, PHE Dte. (Part-E)
Construction of Boundary wall Soil investigation Construction and Commissioning of RCC OHR of capacity 250 cum and Accommodate FHTC under JJM for Sholkamari PWSS in Midnapore Sadar block under Midnapore Division PHE Dte. PART_B
Pump House, Laying distribution pipe line Accommodate FHTC (250 nos) under JJM with allied work for Ita Baria- PWSS in Bhagwanpur-II Block within Contai Sub-Division under Tamluk Division, PHE Dte. (PART-D)
Laying distribution pipe line, Accommodate FHTC (170 nos) under JJM with allied work for Panusi its adjoining moujas PWSS in Bhagwanpur-II Block within Contai Sub-Division under Tamluk Division, PHE Dte.(Part-I)
Laying distribution pipe line, Accommodate FHTC (150 nos) under JJM with allied work for Panusi its adjoining moujas PWSS in Bhagwanpur-II Block within Contai Sub-Division under Tamluk Division, PHE Dte. (Part-H)
Balance work for Laying distribution system, Rising main for piped water supply scheme at PADMAJOLA for implementation of JJM under augmentation of ground water based W/S scheme to accommodate FHTC in Baruipur Block
Operation and maintenance of distribution system including rising main and FHTC for Sibnagar Piped Water Supply Scheme under JJM of Kakdwip Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (For 366 days)
Operation and maintenance of distribution system including rising main and FHTC for Radhakrishnapur Piped Water Supply Scheme under JJM of Sagar Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (For 366 days)
Retrofitting to accomodate FHTC (899 nos.) under JJM in Dona Zone-II PWSS (Balance Work) Block - Moyna under Tamluk Sub-Division of Tamluk Division, PHE Dte. in the District of Purba Medinipur.(Phase- II)
Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connection etc. for Augmentation of Srikrishnanagar W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division
Operation and maintenance of distribution system including rising main and FHTC for Chandipur Piped Water Supply Scheme under JJM of Kakdwip Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (For 366 days)
Pump House, Laying distribution pipe line Accommodate FHTC (50 nos) under JJM with allied work of GARA BAR PWSS within Bhagwanpur-II Block under Contai Sub-Division of Tamluk Division, PHE Dte. (PART-B)
Pump House, Laying distribution pipe line, Accommodate FHTC (270 nos) under JJM with allied work of BASUDEB BERYA PWSS within Bhagwanpur-II Block under Contai Sub-Division of Tamluk Division, PHE Dte. (PART -B)
Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections etc. at Uttar Chandanpiri PWSS, Block - Namkhana for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E.D. Block - Namkhana
Construction of 350 cum. Over Head Reservoir LDS FHTC for Madhabnagar (Zone-I) Water Supply Scheme, Block - Pathar Pratima for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Part-A)
Operation and maintenance of distribution system including rising main and FHTC for Ramratanpur Piped Water Supply Scheme under JJM of Kakdwip Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (For 366 days)
Laying distribution pipe line, Accommodate FHTC (325 nos) under JJM with allied work for Panusi its adjoining moujas PWSS in Bhagwanpur-II Block within Contai Sub-Division under Tamluk Division, PHE Dte. (Part-D)
Construction of 200 cum. Over Head Reservoir (OHR), LDS, FHTC for Augmentation of Gangasagar Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Zone-II)
Construction of Boundary wall Soil investigation Construction and Commissioning of RCC OHR of capacity 200 cum and Accommodate FHTC under JJM for Pachra PWSS in Midnapore Sadar block under Midnapore Division PHE Dte. PART_B
Providing FHTC in connection with JJM at Diferent villages under Bedrabad GP (Dhulauri,Hunumannagar,Bedrabad) under command area of Dariapur Water Supply Scheme at Kaliachak-III Block under MaldaArsenic Area Water Supply Division, PHED.
Construction of Boundary wall Soil investigation Construction and Commissioning of RCC OHR of capacity 100 cum and Accommodate FHTC under JJM for Khangardihi PWSS in Midnapore Sadar block under Midnapore Division PHE Dte. PART_B
Operation and maintenance of distribution system including rising main and FHTC for Nagendraganj Piped Water Supply Scheme under JJM of Sagar Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (For 366 days)
Laying distribution pipe line, Accommodate FHTC (200 nos) under JJM with allied work for Panusi its adjoining moujas PWSS in Bhagwanpur-II Block within Contai Sub-Division under Tamluk Division, PHE Dte.(Part-G)
Construction of RCC OHR 150 CuM Pump House Boundary wall and Accommodate FHTC under JJM with allied work for Hariatara PWSS Zone_II in Kharagpur_I block within Kharagpur Sub_Division under Midnapore Division PHE Dte. PART_I
Laying distribution pipe line, Boundary Wall Accommodate FHTC ( 250 nos) under JJM with allied work of BASUDEB BERYA PWSS within Bhagwanpur-II Block under Contai Sub-Division of Tamluk Division, PHE Dte.(PART - C)
Construction, placing and fixing of FHTC Platform at every individual beneficiary, pump connections etc. for Nadabangha W/S Scheme, Block - Namkhana for implementation of JJM under Kakdwip Sub-Division of Alipore Division (SM/14158)
Operation and maintenance of distribution system including rising main and FHTC for Koaberia Piped Water Supply Scheme under JJM of Kakdwip Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (for 366 days)
Construction, placing and fixing of FHTC platform at every individual beneficiary etc. at Ramchandrapur W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (SM/15050)
Operation and maintenance of distribution system including rising main and FHTC for Gangasagar Piped Water Supply Scheme under JJM of Kakdwip Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (for 366 days)
Construction of 300 cum. Over Head Reservoir (OHR), , LDS, FHTC for Augmentation of Nagendraganj Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Part-A)
Laying distribution system, construction of 01 no. pump house, FHTC to households including O and M for 1 year after completion of works for Narayanganj Water Supply Scheme, Block - Namkhana for implementation of JJM.
Operation and maintenance of distribution system including rising main and FHTC for Shibkalinagar Piped Water Supply Scheme under JJM of Kakdwip Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (for 366 days)
Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections etc. at Srinarayanpur (Part-II) PWSS, Block - Patharpratima for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte.
Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Augmentation of ground based piped water Supply scheme for DEBRA to accommodate FHTC under JJM Program under MMD PHE Dte. (Part-II)
Retrofitting to accommodate FHTC 310 Nos. under JJM at Santeswarpur J.L No-8(Part), Purushottampur J.L. No-11(Part), Kholaberia J.L. No-36(part), Ranisai J.L. No-40(Part) in Ranisai PWSS. ( PHASE-II)
Repair of different type road under Chanduria I Tatla ITatla IIHingnara GP in connection with augmentation of Surface Water Based Piped Water Supply Scheme for Providing FHTC Repair of OHR allied works under JJM
Fabrication,Erection of Signage (135 nos) of Pump house/OHR site democration with in Alipurduar-II and Kalchini Block for Different PWSS of JJM Project Under Alipurduar Division P.H.E.Dte.
Additional of collecting main , manifold connection ,panel room , main gate ,cable trench and other allied work at Andal H/W site under JJM under RCFA Division-I PHE, Dte
LAYING OF 25 MM DIA PP-R PIPES FROM TASHIGAON RIVER TO LEPCHAKHA AND LEPCHAKHA TO DUMBA AND OTHER ALLIED WORKS UNDER JJM PROGRAMME UNDER ALIPURDUAR DIVISION, PHE DTE.
Additional work for Road crossing of 250 mm dia Rising Main for under JJM RCFA Part-II Water Supply Scheme under Raniganj Block under RCFA Division-I PHE Dte.
Laying 25mm dia PP-R from Lamma River to Chunabhati Buxa Hill Forest Village and other allied works under buxa PWSS under JJM Programme under Alipurduar Division, PHE Dte.
Fabrication,Erection of Signage (268 nos) of Pump house/OHR site democration with in Kumargram, Falakata,Madarihat-Birpara Block for Different PWSS of JJM Project Under Alipurduar Division P.H.E.Dte.
Solarization of grid connected pumping installation at Different PWSS at Sitai, Mathabanga and Mekhliganj Block in the dist.of Coochbehar under JJM programme under Northern Mechanical Division-II, PHE Dte
Solarization of grid connected pumping installation at Different PWSS at Kalchini, Madarihat -Birpara ,kumargram Block in the dist.of Alipurduar under JJM programme under Northern Mechanical Division-II, PHE Dte.
Solarization of grid connected pumping installation at Different PWSS at Alipurduar -I and II Block in the dist.of Alipurduar under JJM programme under Northern Mechanical Division-II, PHE Dte
Sinking of Tube Well, Interconnection pipe line,Laying distribution pipe line,under JJM with allied work for AMLACHATI AND ITS ADJOINING MOUJAS PWSS in JHARGRAM Block including supply of all labour materials within Jhargram SubDivision unde Jhargram
Tarulia Piped Water Supply Scheme with Rising Main, LDS, FHTC and construction of 600 cum capacity Overhead Reservoir including Soil investigation and foundation design at Tarulia under Rajarhat block, Dist.- North 24 Parganas.
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in KAPILESWARPUR water supply scheme