Loading…
Loading…
16,802 results • Best match
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in BASIRHAT AUGMENTATION ZONE - I water supply scheme
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in BASIRHAT AUGMENTATION ZONE - III water supply scheme
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in BASIRHAT AUGMENTATION ZONE - II water supply scheme
Supply, Delivery Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator in connection with Aug. work related to FHTC at Pump House No.I and II Rep. under Dobila WS Schem
Operation and Maintenance of distribution system including Rising main, FHTC, OHR, checking of status of supply in the command area,.....throght out the command area of Muraboni And Its Adjoining Moujas PWSS scheme. For 1 Year.
Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Augumentation in connection to Accommodate FHTC at Pump House No.-I ,II and III , Zone-I under RAMNACHANDPUR ground water base
Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Augumentation in connection to Accommodate FHTC at P.H. No.-III under Tildanga ground water based w/s scheme under Block_ Badu
Annual Operation and maintenance for different dia distribution pipeline including FHTC at Egara, Amkula, part of Nimcha (Part A B) and adjacent area within Amritnagar Zone-I under RCFA Division-I PHE Dte. (For 365 Days)
Annual Operation and maintenance of Rising main distribution system including FHTC for village- Kendula, Sarpi, Jubuna, Arati, Amlouka, Ichhapur, Patsaora, Banguri, Jhanjra adibasi para in Durgapur-Faridpur Block Undar Sarpi W/S Scheme under RCFA D
Emergency laying of 90 mm dia UPVC Pipeline with FHTC and restoration of road at Laudoha village and its adjacent area for smooth running of water supply nof that area under RCFA Division-I PHE Dte.
Sinking of 300X200 mm X150 mtr deapth by DR Rig ,Construction of 1 One) No 5.25X3.25 m Pump house cum Chlorine room with sanitary arrangement, Boundary wall, including laying UPVC distribution system (LDS) and providing FHTC and
Supplying, laying and aligning of UPVC distribution pipe line (Distribution system Part-A) and allied works including functional house holds tap connection (FHTC) and connection providing to Akandara(JL No-47) ,Molandighi(JL No-48),Kandarakona (JL_51
Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Newly Sinkinng Tube Well in connection to Accommodate FHTC at Pump House No.-I and II under Anjangarh ground water based wate
Operation and maintenance of drinking water supply system with Allied works of water supply scheme in convergence with Jalaswapna or JJM at different schools within Tehatta-II Block in the district of Nadia.
Operation AND maintenance of drinking water supply system with Allied works of water supply scheme in convergence with Jalaswapna or JJM at different schools within Krishnagar-II Block in the district of Nadia.
Preparation of Sketch map, demarcation, registration, mutation of Govt and Pvt land of different PWSS under Aushgram I and II, Galsi - I and II Block for ongoing JJM PWSS Under DWSD,PHE Dte
Trial run and special Maintenance of Rising main system with operating of valve within command area under Augmentation of Kanksa Zone-I PWSS, JJM under RCFA Division-I PHE Dte. 6 (Six) Months
Operation AND maintenance of drinking water supply system with Allied works of water supply scheme in convergence with Jalaswapna or JJM at different schools within Krishnagar-I Block in the district of Nadia.
Repairing of 110m Boundary Wall for PH-1 of Khosdelpur Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte.
Operation and maintenance of drinking water supply system with Allied works of water supply scheme in convergence with Jalaswapna or JJM at different schools within Ranaghat-I Block in the district of Nadia.
Operation and maintenance of drinking water supply system with Allied works of water supply scheme in convergence with Jalaswapna or JJM at different schools within Tehatta-I Block in the district of Nadia.
Repairing of Boundary Wall for Pump House No - 1 of Sadpur water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division P.H.E.Dte.
Trial run and special Maintenance of Rising main and Distribution system with operating of valve within command area under Augmentation of Birudiha PWSS, JJM under RCFA Division-I PHE Dte. 6 (Six) Months
Operation and maintenance of drinking water supply system with Allied works of water supply scheme in convergence with Jalaswapna or JJM at different schools within Ranaghat-II Block in the district of Nadia.
Operation and maintenance of drinking water supply system with Allied works of water supply scheme in convergence with Jalaswapna or JJM at different schools within Karimpur-I Block in the district of Nadia.
Trial run and special Maintenance of Rising main and Distribution system with operating of valve within command area under Augmentation of Banagram PWSS, JJM under RCFA Division-I PHE Dte. 6 (Six) Months
Trial run and special Maintenance of Rising main and Distribution system with operating of valve within command area under Augmentation of Napara PWSS, JJM under RCFA Division-I PHE Dte. 6 (Six) Months
Trial run and special Maintenance of Rising main and Distribution system with operating of valve within command area under Augmentation of Garadaha PWSS, JJM under RCFA Division-I PHE Dte. 6 (Six) Months
Trial run and special Maintenance of Rising main and Distribution system with operating of valve within command area under Augmentation of Telipara PWSS, JJM under RCFA Division-I PHE Dte. 6 (Six) Months
Constructions of Pump House, Laying of Distribution pipe line under JJM with allied work for JIRAPARA AND ITS ADJOINING MOUJAS PWSS in JAMBONI Block within Jhargram Sub-Division under Jhargram Division, PHE Dte.
Water Sample Collection Charge at 10 nos G.P. under Jamuria Block (where facilities are unavailable / inactive) related to water quality Monitoring Surveillance under JJM under RCFA Division-I PHE Dte. (For 6 months)
Trial run and special Maintenance of Rising main and Distribution system with operating of valve within command area under Augmentation of Dhobaru PWSS, JJM under RCFA Division-I PHE Dte. 6 (Six) Months
Annual Operation Maintenance of DI CI UPVC HDPE Rising main network along with distribution networks at Roopganj, Arrah,Shibtala Roopganj PWSS (Non-JJM) under RCFA Division-I, PHE Dte (Total-02 nos labour)
Operation and maintenance of drinking water supply system with Allied works of water supply scheme in convergence with Jalaswapna or JJM at different schools within Karimpur-II Block in the district of Nadia.
Construction of Pump House, Boundary Wall, Laying of Rising main with distribution pipe line Accommodate FHTC ( 500 Nos) under JJM with allied work for Ramnagar Zone-I Its Adjoining Mouzas Water Supply Scheme within Ramnagar-I Block under Digha
250 cum OHR (Intze type with pile foundation), Rising main, Laying distribution pipe line,Pump House , Boundary Wall, Soil investigation and Accommodate FHTC (460 nos) under JJM with allied work for Ita Baria- PWSS in Bhagwanpur Block within Contai
Construction of Pump House Laying Rising main Boundary wall Laying distribution pipe line Accommodate FHTC including 2 yrs. OandM under JJM with allied work for Hariatara PWSS Zone_I in Kgp_I block within KSD under Midnapore Divn. PHE Dte. PART_II
Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections, Pile and Pile Cap for OHR etc at Madhavnagar Zone-2 PWSS, Block -Pathar Pratima for implementation of JJM under Kakdwip Sub-Division of Alipore Divis
Operation and maintenance of distribution system including rising main and FHTC for Sibkalinagar Piped Water Supply Scheme under JJM of Kakdwip Block under Kakdwip Sub Division, PHE Dte. (For one year from the date of issuance of work order).
Laying distribution pipe line, Repair of Pump House , Repair Boundary Wall , land development for approch road Accommodate FHTC (70 nos) under JJM with allied work for Bathuari (Zone-I) PWSS within Egra-II Block including supply of all labou
Drum Sheet walling , left out pipe line, road restoration, Accommodate FHTC (27 Nos) and others allied works under JJM for Uttar Gopalpur Its Adjoining Mouzas Water Supply Scheme within Ramnagar-II Block under Digha Sub-Division of Tamluk Divin
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 300 Cum OHR Accommodate FHTC ( 238 Nos) under JJM with allied work for KANPUR (Z-II) PWSS within Ramnagar-II Block under Digha Sub-Division
Sinking of Tube Well, Laying distribution pipe line, Accommodate FHTC (400 nos) under JJM with allied work for PANCHAMI AND ITS ADJOINING MOUJAS PWSS in JHARGRAM Block including supply of all labour materials within Jhargram Sub Division unde PHE
Pump House ,200 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (357 nos) under JJM with allied work of PACHAHRI PWSS within Bhagwanpur II B
Pump House ,50 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (20 nos) under JJM with allied work of GARA BAR PWSS within Bhagwanpur-II
Construction and installation of Manifold and allied works at OHR site in connection to Retrofitting (Phase-I) Under JJM In Ground Based Piped Water Supply Scheme at Itla To Accommodate FHTC Within Krishnagar I Block Under Krishnanagar Sub-division
Tube well, Pump House, 50 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, RCC Culvert, CC Pavement, Boundary Wall, Soil investigation Accommodate FHTC (227 nos) under JJM with allied work for
Providing FHTC by providing branch line in connection with JJM under command area of Niyamatpur From health sub centre towards SSK of Niyamatpur Water Supply Scheme at English Bazar Block under Malda Malda Arsenic Area Water Supply Division, PHED.
Tube well,Pump House ,250 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, RCC Culvert, CC Pavement, Boundary Wall, Soil investigation Accommodate FHTC (1808 nos) under JJM with allied work for
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 209 Nos) under JJM with allied work for KANPUR (Zone-IV) PWSS within Ramnagar-II Block under Digha Sub-Division