Loading…
Loading…
16,802 results • Best match
Providing FHTC, Laying of Rising Main, including supplying..Construction of 100cum capacity RCC Over Head Reservoir..allied Works at Head work 2nd site under JJM at Raynagar Zone- II WS Scheme within Ranaghat-I Block under NAD-I, PHE Dte
Laying distribution system along with boring of new T/W, const. of pump house, boundary wall and providing FHTC at Singbhita, Dhulia, Dhuliar Chhat, Dakua, Tharu Bhita, Dagdhu mouza under JJM/Jal Swapna in connection with rejuvenation of Dhulia PWSS
Retrofitting to accommodate FHTC(Balance work) (200 nos.) and laying of left-out portion with uPVC pipeline due to uncovered area of this Zone and damaged pipe line at different nodal point under JJM in Surface water based water supply scheme
Retrofitting to accommodate FHTC (429 nos) under JJM in Tajpur PWSS within Bar Jamtalya - JL No.-148 (Bar Jamtalya) Nandanayak Bar - J.L. - 179 (Nandanayak Bar) in Nandigram-I dev. Block under Haldia Sub-Division of Tamluk Division, PHE Dte.(Part-E
Retrofitting to accommodate FHTC (409 nos) under JJM in Tajpur PWSS within Dijam Talya - JL No.-149 (Dijam Talya) in Nandigram-I dev. Block under Haldia Sub-Division of Tamluk Division, PHE Dte. in the District of Purba Medinipur. (Part-D)
Retrofitting to accommodate .FHTC (152 nos.)(Balance work) and laying of left-out portion with uPVC pipeline due to uncovered area of Dona Zone-II Water Supply Scheme and its adjoining mouzas Water Supply Scheme at different nodal point under JJM
Retrofitting works for creacion of FHTC (Functional House Hold Tap Connection in connection with Jal Jeevan Misson (JJM) and JAL SWAPNA of DHABAN (Zone - A) under Saltora- Chhatna Block W/S Scheme (BRGF ph - I project) under Bankura Sadar Sub - D
Relaying pipe line which was damaged during construction of RIDF Blacktop road from Purushottampur to Balakbar Road to reconnect the pipe line and FHTC under JJM in HALDIA PWSS within Ramnagar-I Block under Digha Sub-Division of Tamluk Division
Sinking of 200 X 150 mm dia. X 165 mtr. rig bored replacement tubewell for Rukhnimara Mini W/S Scheme in connection with retrofitting to accommodate FHTC under JJM in 45nos. Mini PWSS at Nayagram Block under Jhargram Division , (ANNNEXURE_iii)
Construction of different components of ANANDAPUR TG PWSS ie 2 Nos Tube well 2 Nos Pump House IEP 2 Nos Boundary Wall 350Cum OHR Rising Main FHTC etc. in connection with JJM at Block Kranti under Jalapiguri Division PHE Dte
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 50 Cum OHR and Accommodate FHTC ( 270 Nos) under JJM with allied work for Daha daya and Its Adjoining Mouzas Water Supply Scheme within Ramnagar-I
Retrofitting works for creacion of FHTC (Funtional House Hold Tap Connection in connection with Jal Jeevan Misson (JJM) and JAL SWAPNA of KALIPUR(Zone - C) under Saltora- Chhatna Block W/S Scheme (BRGF ph - I project) under Bankura Sadar Sub - Di
Tube well,Pump House ,250 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (1847 nos) under JJM with allied work for AJAYA- PWSS in Khejuri-I
Pump House ,150 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (200 nos) under JJM with allied work for PANCH BAJARI PWSS in Bhagwanpur-II B
Allied work for laying of 110 mm dia upvc pipeline at Minister para area in connection with Retrofitting providing FHTC in connection with JJM under command area of village of Lalgola village code 314224 under Lalgola Ground Water Based Water Sup
Retrofitting works for creacion of FHTC (Funtional House Hold Tap Connection in connection with Jal Jeevan Misson (JJM) and JAL SWAPNA of CHINABARI (Zone - H) under Saltora- Chhatna Block W/S Scheme (BRGF ph - I project) under Bankura Sadar Sub -
Laying distribution system pipe line, accommodate FHTC(500 nos),Construction of switch room cum cholorine room(H/W site) , Construction of Boundary Wall (H/W site) under JJM with allied work for Harashankar PWSS in Tamluk Dev. Block including sup
Providing Functional House Hold Tap Connection (FHTC) to each and every household within command area of Zone -C of Puncha and Zone -E of Aguribandh Punisole PWSS executed under BRGF in Onda Block of Bankura District under Jal Swapna and JJM
Restoration work by providing Sand Filling GSB WMM BM and Mastic asphalt wearing course at Damaged Bituminous road portions and restoration of flank portion by sand filling by Open Trench Method by PHE Dte in connection with JJM FHTC project
Laying distribution pipe line, renovation of Pump House, Boundary Wall 400 Cum OHR and Accommodate balance FHTC ( 42 Nos) under JJM with allied work for Sankarpur (Zone-II) PWSS within Ramnagar-I Block under Digha Sub-Division of Tamluk Divn
Retrofitting to accommodate FHTC (741 nos) under JJM in Mahammadpur PWSS within Mahammadpur JL No.-185- (Uttar Mahammadpur) in Nandigram-I dev. Block under Haldia Sub-Division of Tamluk Division, PHE Dte. in the District of Purba Medinipur. (Part-B)
Balance work for Retrofitting to accommodate FHTC (345 nos) and laying of left-out portion uPVC pipeline due to uncovered area of this Zone and damaged pipe line at different nodal point under JJM in Surface water based water supply scheme
Construction and installation of MANIFOLD and allied works at OHR site under Muragachha Zone-II Ground Based WSS under Hanskhali Block under NADI PHED. in connection with Providing FHTC under JJM for Miragachha Zone-I and II Part III etc.
Retrofitting to accommodate FHTC (505 Nos) (Mouza- Rankinipur, J.L. No.-135) Relaying of damaged pipeline within Nodal point 160-161, 196-197, 196-199, 161-172 172-174 in Hanubhunia Mouza, J.L. No.-133, under JJM in Gholepukuria (Zone-I) PWSS.
Construction of 2 nos. 350 cum. Over Head Reservoir (OHR), , LDS, FHTC for Augmentation of Bishnupur (Zone-I and II) Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Part-A)
Laying distribution pipe line due to Re- design of pipe line , Accommodate Balance FHTC ( 110 Nos) under JJM with allied work for SANKARPUR (Zone-V) PWSS within Ramnagar-I Block under Digha Sub-Division of Tamluk Division , PHED , Purba Medi
Retrofitting works for creation of FHTC (Functional House Hold Tap Connection in connection with Jal Jeevan Misson (JJM) and JAL SWAPNA of Horaka (Zone - G) under Saltora- Chhatna Block W/S Scheme (BRGF Ph- I Project) under Division, PHE Dte.
Retrofitting works for creacion of FHTC (Functional House Hold Tap Connection in connection with Jal Jeevan Misson (JJM) and JAL SWAPNA of HAPANIA (Zone - D) under Saltora- Chhatna Block W/S Scheme (BRGF ph - I project) under Bankura Sadar Sub -
Balance work for Retrofitting to accommodate FHTC (620 nos.) and laying of left-out portion uPVC pipeline due to uncovered area of this Zone and damaged pipe line at different nodal point under JJM in Surface water based water supply scheme
Laying distribution system pipe line, accommodate FHTC(700 nos),Construction of switch room cum cholorine room(2nd T/W site) , Construction of Boundary Wall (2nd t/w site) under JJM with allied work for Harashankar PWSS in Tamluk Dev. Block inclu
Laying distribution system for providing FHTC to all households for Augmentation of Khas Ramkarchar (Zone- I and II) Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Divn of Alipore Division, P.H.E Dte. (Zone-I) (Part-B)
Laying of HDPE Pipe Line from Arrah to Dochama Ashram for retrofitting works for creation of FHTC (Functional House Hold Tap Connection in connection with Jal Jeevan Misson (JJM) and JAL SWAPNA of Bandyagal (Zone - F) under Chhatna Bloc k of
Laying of UPVC pipe line supportive to retrofitting to accommodate FHTC including supplying laying fitting fixing of 15mm dia. NB PVC and HDPE Pipe with all necessary specials etc. under JJM at Barisha Zone_I W_S Scheme under Midnapore Divn PHE Dte.
Laying distribution system pipe line, accommodate to FHTC and construction of switch room cum chlorine room (2nd T/W site), construction of Boundary wall (2nd T/W site), under JJM with allied work for Harasankar PWSS within Tamluk Sub-Division under
Retrofitting works for creacion of FHTC (Funtional House Hold Tap Connection in connection with Jal Jeevan Misson (JJM) and JAL SWAPNA of KALIPUR(Zone - C) under Saltora- Chhatna Block W/S Scheme (BRGF ph - I project) under Bankura Sadar Sub - Di
Providing FHTC in connection with JJM under command area of Jote Basanta W/S Scheme (Habitation Kachari Para, Tiyor Para, Colony ,Purba Para, Lalchand Para, village Jote Basanta) at Englishbazar Block under Malda Arsenic Area W/S Division, PHE Dte.
Providing FHTC under JJM for Garapota Bazar to H/O Chayan Biswas, Boro Chupria Paschim Garapota to HO Sanjiban Biswas, Boro Chupria at Hanskhali Block by retrofitting of Ground Water Based PWSS for Chupria WS Scheme under NAD I PHED
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 173 Nos) under JJM with allied work for Chirulia-Chatla (Zone-IV) PWSS within Egra-I Block under Digha Sub-Divis
Retrofitting works for creacion of FHTC (Funtional House Hold Tap Connection in connection with Jal Jeevan Misson (JJM) and JAL SWAPNA of DHABAN (Zone - A) under Saltora- Chhatna Block W/S Scheme (BRGF ph - I project) under Bankura Sadar Sub - Di
Laying distri. system along with const. of pump houses with toilet, boundary walls at tube well sites, laying of rising main, providing FHTC with platform and other allied works under JJM for MANJHA TEA GARDEN PWSS under Siliguri Sub Division, PHEDte
Laying left out pipe line and Retrofitting to accommodate FHTC (1600 Nos.) under JJM in Surface Water Based Water Supply Scheme for Zone-X (Balance work) Block- Kolaghat in the District of Purba Medinipur under Tamluk Sub Division of Tamluk Division
Laying distribution pipe line, Pump House , Boundary Wall ,Rising main , O M and accommodate FHTC (832 nos) under JJM with allied work for AGAR PWSS in Sahid Matangini Block including supply of all labour materials within Tamluk Sub-Division und
Laying distribution system for providing FHTC to all households for Augmentation of Khas Ramkarchar (Zone- I and II) Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Divn of Alipore Division, PHE Dte. (Zone-I) (Part-A)
Laying of Rising Main, Providing FHTC including supplying..Construction of 400cum capacity RCC Over Head Reservoir..allied Works at Head work 2nd site under JJM for Parbatipur Zone- I in Ranaghat-I Block..under Nadia Arsenic Division-I, PHE Dte
Providing FHTC, Laying of UPVC parallel pipe supply of all specials and valves , others Allied works and three months trial run in connection with JJM under Bakhrabad PWSS of Kaliachak-III Block under Malda Arsenic Area W/S Division PHE Dte.
Sinking of Tube Well , Pump House , 200 cum OHR, Rising main pipe line, Interconnection pipe line, Laying distribution pipe line, Installation of display Board, soil investigation under JJM with allied work for GOHAL BURA
Repairing of 65 m Boundary Wall for PH-2 of Kamarpur Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte.
Trial run and special Maintenance of Rising main and Distribution system with operating of valve within command area under Augmentation of Garkillah- Kherobari PWSS, JJM under RCFA Division-I PHE Dte. 6 (Six) Months.
Work Related to Construction of Boundary Wall including land development and Pathway at Bhaburia H/W site for Sharpi Water Supply Scheme under JJM at Durgapur-Faridpur Block under RCFA Division-I PHE Dte.
Providing and installation of High lift pumping machineries and other electromechanical accessories for Augmentation of piped water supply scheme for Kenjakura its adjoining mouzas (JJM Revision) under Bankura Mechanical Division PHE Dte Bankura-I