Loading…
Loading…
16,803 results • Best match
Special repair and renovation of pump house and other Allied Works for Pump House No - 2 of Talsa WS scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte.
Laying 200 mm dia MS water pipe line with 600 mm dia MS casing pipe for railway crossing in between Jamuria (JMA) and Barabani (BBI) at KM 25/2-3 in Asansol Division under JJM under RCFA Division-I PHE Dte.
Constructions of Pump House under JJM with allied work for PITHAPURA AND ITS ADJOINING MOUJAS PWSS in GOPIBALLAVPUR-II Block including supply of all labour and materials within Jhargram Sub-Division under Jhargram Division, PHE Dte. 2nd Call (Ref 1
Construction of Service Road 55 Mtr. Length x 2 Mtr. Width for Pump House No 2 of kamarpur Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte.
Special repair and renovation of pump house and other Allied Works for Pump House No - 1 of Gaighata WS scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte.
Construction of the Service Road 88.00 Mtr. Length and 3.00 Mtr. Wide while 1.00 Mtr. wide road already existing in Head Work Site of Maslandapur- I Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdic
Construction of Service Road 20 Mtr. Length X 2 Mtr. Width for Pump House No 2 of Talsa Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte.
Sinking of Tube Well, Switch Room under JJM with allied work for DALKATI AND ITS ADJOINING MOUJAS PWSS in JHARGRAM Block including supply of all labour and materials within Jhargram Sub-Division under Jhargram Division, PHE Dte. 2nd Call (Ref 1st
Laying 450 mm dia MS water pipe line with 700 mm dia MS casing pipe for Railway crossing in between KM 227/27-29 and between Salanpur (SLS) Rupnarayanpur (RNPR) in Asansol Division under JJM under RCFA Division-I PHE Dte.
Special repair and renovation of boundary wall and other allied Works for Pump House No - 1 of Deora WS scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dt
Repeairing and Renovation of Existing Room For Prepair of Laboratory Room and Store Room, Boundary Wall with Gate, Side drain with necessary allied works at Galsi - II Head Works Site under Jadabganj pipe Water Supply Scheme (JJM) Under DWSD , PHE
Laying of proposed Rising main (Length- 1085 mtr, 4817 mtr AND 1320 mtr.) of Cha-Sundori Project (JJM- SM/10054) within Lankapara Tea Garden Area Piped Water Supply Scheme, Madarihat-Birpara block of Birpara Sub-Division under Alipurduar Division, PH
Construction of Service Road 30 Mtr. Length X 2 Mtr. Width for Pump House No 1 of khosdelpur Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte
Construction of Service Road 45 Mtr. Length X 2 Mtr. Width for Pump House No 1 of Gaighata Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte.
Special repair and renovation of pump house and other Allied Works for Pump House No - 1 of Kankpul WS scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte.
Special repair and renovation of pump house and other Allied Works for Pump House No - 2 of Kamarpur WS scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte.
Repair and renovation of High Lift Pump House, Clorine Room and CWR in the Head Work site of Maslandapur II Piped water supply scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat
Construction of Service Road 55 Mtr. Length X 2 Mtr. Width for Pump House No1 of kamarpur Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte.
Special repair and renovation of pump house and other Allied Works for Pump House No - 2 of Talsa and Adj Mouzas WS scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division,
PWSS to accommodate FHTC Laying Distribution System under Jal Jivan Mission
PWSS to accommodate FHTC Laying Distribution System under Jal Jivan Mission
FHTC AT LEFT OUT PORTION OF PURBA THAKURANICHAK ZONE-II PWSS
Relaying damaged U-pvc pipe Re-Installation damaged FHTC By WBSRDA
BHATPARA and adjoining moujas PWSS to accommodate FHTC, Construction Tube Well
PWSS to accommodate FHTC Laying Distribution System under Jal Jivan Mission
BRAHMANDIHI and adjoining moujas PWSS to accommodate FHTC, Construction Tube Well
PWSS to accommodate FHTC Laying Distribution System under Jal Jivan Mission
PWSS to accommodate FHTC Laying Distribution System under Jal Jivan Mission
PWSS to accommodate FHTC Laying Distribution System under Jal Jivan Mission
SINGADDA and adjoining moujas PWSS to accommodate FHTC, Construction Tube Well
SURFACE WATER BASED RANGMOHAN PWSS TO ACCOMODATE FHTC IN MIRIK BLOCK
PWSS to accommodate FHTC Laying Distribution System under Jal Jivan Mission
FHTC AT LEFT OUT PORTION OF PURBA THAKURANICHAK ZONE-I PWSS
PWSS to accommodate FHTC Laying Distribution System under Jal Jivan Mission
PWSS to accommodate FHTC Laying Distribution System under Jal Jivan Mission
EROALI and Adjoining Mouzas PWSS to accommodate FHTC, Construction Tube Well
PARULIA and adjoining moujas PWSS to accommodate FHTC, Construction Tube Well
PWSS to accommodate FHTC Laying Distribution System under Jal Jivan Mission
PWSS to accommodate FHTC Laying Distribution System under Jal Jivan Mission
PWSS to accommodate FHTC Laying Distribution System under Jal Jivan Mission
ANDULIA and Adjoining Mouzas PWSS to accommodate FHTC, Construction Tube Well
LOHADAHA and Adjoining Mouzas PWSS to accommodate FHTC, Construction Tube Well
WATER BASED GHAYABARI TEA GARDEN TO ACCOMODATE FHTC IN KURSEONG BLOCK
PWSS to accommodate FHTC Laying Distribution System under Jal Jivan Mission
PETARI and Adjoining Mouzas PWSS to accommodate FHTC, Construction Tube Well
MAHISAR and Adjoining Mouzas PWSS to accommodate FHTC, Construction Tube Well
PWSS to accommodate FHTC Laying Distribution System under Jal Jivan Mission
Restoration of existing pipeline including necessary reconnection of FHTC damaged etc.
Supply, delivery, installation, commissioning and trial run of electro-mechanical components along with Cu wound line voltage corrector for AUGUMENTATION of RASIKBIL water supply scheme, TW no I of Zone-I and TW I of Zone-II under JJM
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC), FHTC with all related structure of 6 nos Mini pipe water supply scheme (out of 45 Mini PWSS) of Jamboni Block (2 nos ) and Jhargram Block (4 nos)under Jhargram